Summary


PRSUBD20180411
Public Infrastructure
Final Acceptance
LEMERY LEIGH ANN
DEVELOPMENT COMPLETE
Reserve at Stoney Creek 3rd Plat - sanitary and water, street and storm
02/23/2018
11/13/2019
11/18/2022
07/31/2023
Locations
Address
1405 SW GEORGETOWN DR, LEES SUMMIT, MO 64082

Address
1409 SW GEORGETOWN DR, LEES SUMMIT, MO 64082

Address
1413 SW GEORGETOWN DR, LEES SUMMIT, MO 64082

Address
1417 SW GEORGETOWN DR, LEES SUMMIT, MO 64082

Address
1421 SW GEORGETOWN DR, LEES SUMMIT, MO 64082

Address
1425 SW GEORGETOWN DR, LEES SUMMIT, MO 64082

Address
1505 SW GEORGETOWN DR, LEES SUMMIT, MO 64082

Address
1509 SW GEORGETOWN DR, LEES SUMMIT, MO 64082

Address
1513 SW GEORGETOWN DR, LEES SUMMIT, MO 64082

Address
1517 SW GEORGETOWN DR, LEES SUMMIT, MO 64082

Address
1521 SW GEORGETOWN DR, LEES SUMMIT, MO 64082

Address
1525 SW GEORGETOWN DR, LEES SUMMIT, MO 64082

Address
1529 SW GEORGETOWN DR, LEES SUMMIT, MO 64082

Address
1533 SW GEORGETOWN DR, LEES SUMMIT, MO 64082

Address
4408 SW LODESTONE DR, LEES SUMMIT, MO 64082

Address
1410 SW GEORGETOWN DR, LEES SUMMIT, MO 64082

Address
1414 SW GEORGETOWN DR, LEES SUMMIT, MO 64082

Address
1418 SW GEORGETOWN DR, LEES SUMMIT, MO 64082

Address
1422 SW GEORGETOWN DR, LEES SUMMIT, MO 64082

Address
1426 SW GEORGETOWN DR, LEES SUMMIT, MO 64082

Address
1504 SW GEORGETOWN DR, LEES SUMMIT, MO 64082

Address
1508 SW GEORGETOWN DR, LEES SUMMIT, MO 64082

Address
1512 SW GEORGETOWN DR, LEES SUMMIT, MO 64082

Address
1516 SW GEORGETOWN DR, LEES SUMMIT, MO 64082

Address
1520 SW GEORGETOWN DR, LEES SUMMIT, MO 64082

Address
1524 SW GEORGETOWN DR, LEES SUMMIT, MO 64082

Address
1528 SW GEORGETOWN DR, LEES SUMMIT, MO 64082

Address
1532 SW GEORGETOWN DR, LEES SUMMIT, MO 64082

Address
1536 SW GEORGETOWN DR, LEES SUMMIT, MO 64082

Address
1604 SW GEORGETOWN DR, LEES SUMMIT, MO 64082

Address
4399 SW AMETHYST DR, LEES SUMMIT, MO 64082

Address
4395 SW AMETHYST DR, LEES SUMMIT, MO 64082

Address
4391 SW AMETHYST DR, LEES SUMMIT, MO 64082

Address
1704 SW HIGHTOWN DR, LEES SUMMIT, MO 64082

Address
1708 SW HIGHTOWN DR, LEES SUMMIT, MO 64082

Address
1712 SW HIGHTOWN DR, LEES SUMMIT, MO 64082

Address
1800 SW HIGHTOWN DR, LEES SUMMIT, MO 64082

Address
1804 SW HIGHTOWN DR, LEES SUMMIT, MO 64082

Address
1808 SW HIGHTOWN DR, LEES SUMMIT, MO 64082

Address
1812 SW HIGHTOWN DR, LEES SUMMIT, MO 64082

Address
1900 SW HIGHTOWN DR, LEES SUMMIT, MO 64082

Address
1705 SW HIGHTOWN DR, LEES SUMMIT, MO 64082

Address
1709 SW HIGHTOWN DR, LEES SUMMIT, MO 64082

Address
1713 SW HIGHTOWN DR, LEES SUMMIT, MO 64082

Address
1717 SW HIGHTOWN DR, LEES SUMMIT, MO 64082

Address
1801 SW HIGHTOWN DR, LEES SUMMIT, MO 64082

Address
1805 SW HIGHTOWN DR, LEES SUMMIT, MO 64082

Address
1809 SW HIGHTOWN DR, LEES SUMMIT, MO 64082

Address
1813 SW HIGHTOWN DR, LEES SUMMIT, MO 64082

Address
1901 SW HIGHTOWN DR, LEES SUMMIT, MO 64082

Address
1700 SW HIGHTOWN DR, LEES SUMMIT, MO 64082

Address
1700 SW GEORGETOWN DR, LEES SUMMIT, MO 64082

Address
1800 SW GEORGETOWN DR, LEES SUMMIT, MO 64082

Property
69740151300000000

Property
69740151200000000

Property
69740151100000000

Property
69740151000000000

Property
69700130100000000

Property
69700130200000000

Property
69700130300000000

Property
69740151400000000

Property
69700130400000000

Property
69700130500000000

Property
69700130600000000

Property
69700130700000000

Property
69740151500000000

Property
69740160600000000

Property
69740160500000000

Property
69740160400000000

Property
69700980100000000

Property
69740160700000000

Property
69700037200000000

Property
69700037300000000

Property
69700037400000000

Property
69700037500000000

Property
69700037600000000

Property
69700037700000000

Property
69700140900000000

Property
69700038100000000

Property
69700037800000000

Property
69700037900000000

Property
69700990300000000

Property
69700038000000000

Property
69700038200000000

Property
69700140100000000

Property
69700038300000000

Property
69700038500000000

Property
69700038600000000

Property
69700038700000000

Property
69700038800000000

Property
69700038900000000

Property
69700039000000000

Property
69700039100000000

Property
69700990100000000

Property
69700038400000000

Property
69700130800000000

Property
69700071400000000

Property
69700990400000000

Property
69700037100000000

Property
69700140200000000

Property
69700140300000000

Property
69700140400000000

Property
69700140500000000

Property
69700140600000000

Property
69700140700000000

Property
69700140800000000

Property
257601

Address
1406 SW GEORGETOWN DR, LEES SUMMIT, MO 64082

Contacts
REDFORD CONSTRUCTION INC, Address:PO BOX 1065, Phone:(816) 540-2030  
ENGINEERING SOLUTIONS, Address:50 SE 30TH ST, Phone:(816) 623-9888  
RANDY SPALDING EXCAVATING INC, Address:PO BOX 1421, Phone:(816) 318-9500  
JK CONCRETE CONSTRUCTION LLC, Address:PO BOX 159, Phone:(816) 623-3343  
SUPERIOR BOWEN CONST LLC, Address:520 W PENNWAY ST STE 300, Phone:(816) 921-8200  
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
LEMERY LEIGH ANN, Address:1414 SW GEORGETOWN DR  
WOODWARD JEFFREY B & ANGELA M, Address:1410 SW GEORGETOWN DR  
GINES JED & JENNIFER, Address:1418 SW GEORGETOWN DR  
WALKER ANTHONY P, Address:1422 SW GEORGETOWN DR  
HIRJI RAHEEL N & AKHONZADA FERESHTA, Address:1426 SW GEORGETOWN DR  
BUSTOS FAUSTO JOSEPH III & KARA, Address:1405 SW GEORGETOWN DR  
BLISS MATTHEW DAVID & KATIE ALIZABETH, Address:1409 SW GEORGETOWN DR  
HOWELL TRUST AGREEMENT DATED 04/08/2024, Address:1413 SW GEORGETOWN DR  
ATKERSON RYAN & EMILY, Address:1417 SW GEORGETOWN DR  
PARKER DENITA, Address:1421 SW GEORGETOWN DR  
ESQUARED TRUST DATED 03/25/2024, Address:1425 SW GEORGETOWN DR  
CHENG JOHN S & CHRISTINE, Address:1505 SW GEORGETOWN DR  
HANLEY MICHAEL & REBECCA, Address:1509 SW GEORGETOWN DR  
FRANK SHERRY L & RICHARD A, Address:1513 SW GEORGETOWN DR  
WATT ALEXANDER MICHAEL & KYMRI ELLEN, Address:1517 SW GEORGETOWN DR  
FERNELIUS ANTHONY & KAITLYN, Address:1521 SW GEORGETOWN DR  
EKWUE DANIEL, Address:1525 SW GEORGETOWN DR  
CROW KALEB & BARNES RYAN, Address:1529 SW GEORGETOWN DR  
BURNS COREY LAVARR & SHAMETRIA LATRAIL, Address:1533 SW GEORGETOWN DR  
ANDERSON ERIC HOWELL & ALLISON DONNA, Address:4408 SW LODESTONE DR  
BLOCK DAVID M & WOODS LORI A, Address:1504 SW GEORGETOWN DR  
SAVAGE CASSIDY & JESSICA, Address:1508 SW GEORGETOWN DR  
KAUR PARKASH, Address:1512 SW GEORGETOWN DR  
NOWLIN STEVEN P & TERRI L--TRUSTEES, Address:1516 SW GEORGETOWN DR  
SMITH RICKY & RHONDA, Address:1520 SW GEORGETOWN DR  
BOYACIOGLU MUSTAFA HIKMET & BOYACIOGLU DILEK, Address:1524 SW GEORGETOWN DR  
WEISENBORN MICHELLE L, Address:1528 SW GEORGETOWN DR  
ROBINSON MICHAEL SHAWN & LOUISE WHITNEY, Address:1532 SW GEORGETOWN DR  
DECKER ROBERT JR & LINDA, Address:1536 SW GEORGETOWN DR  
LOLLIS SHAWN I & ANGELA C, Address:1604 SW GEORGETOWN DR  
STONEY CREEK ESTATES HOMEOWNERS ASSOCIATION INC, Address:120 SE 30TH ST  
BERGEN FAMILY TRUST DATED 12/02/2021, Address:1704 SW HIGHTOWN DR  
MEYER CHRISTINA L, Address:4399 SW AMETHYST DR  
ALLGEYER KEVIN M & SHELLY R HAMMONTREE, Address:4395 SW AMETHYST DR  
PARKER RAFEAL L II & NATASHA L, Address:4391 SW AMETHYST DR  
KELLUM MARTY & MONICA HARRIS, Address:1708 SW HIGHTOWN DR  
KELDGORD THOMAS, Address:4040 PIEDMONT DR UNIT 129  
AVITAL HOMES LLC, Address:15729 BALLENTINE ST  
MARCHAND STEPHEN J & CARLA M, Address:1804 SW HIGHTOWN DR  
MCCAFFREY BRADLEY & KELLEY A, Address:1812 SW HIGHTOWN DR  
HELLUM HUNTER L & KJELBURG JESSICA, Address:1900 SW HIGHTOWN DR  
HARALSON BRETT A & ABBY M, Address:1705 SW HIGHTOWN DR  
MUNSELL FAMILY TRUST DATED 04/01/2024, Address:1709 SW HIGHTOWN DR  
HERNANDEZ ALEX & KRISTY, Address:1713 SW HIGHTOWN DR  
NEAL BLAKE & MAKAYLA, Address:1813 SW HIGHTOWN DR  
Reviews
Review Type Outcome Est. Completion Date Completed
Master Draingage As-built Review Approved 11/15/2019 11/13/2019
John DiMauro
Licensed Contractors Approved 02/23/2018 11/29/2018
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
91100C8-Sanitary Sewer Insp Fees $4,386.72 $4,386.72 Paid 02/23/2018
91100C9-Water Insp Fee $5,540.12 $5,540.12 Paid 02/23/2018
9110072-Water Test Fee $800.00 $800.00 Paid 02/23/2018
9110071-Site Grading Fee $2,870.71 $2,870.71 Paid 06/04/2018
9110068-Storm Fee $10,305.58 $10,305.58 Paid 06/04/2018
9110081-Paved Surface Inspection Fee $19,107.84 $19,107.84 Paid 06/04/2018
9110069-After Hours Inspections (Public Works)(Per Hour) $250.00 $250.00 Paid 12/04/2019
9110068-Storm Fee $346.80 $346.80 Paid 03/09/2022
$10,652.38
Outstanding Fees Amount Paid Owing Date Paid


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Passed 6/22/2018 at 8:30 AM 06/23/2018
Informational
06/23/2018
Tom Chandler 06/23/2018 7:18 AM ESC devices have been installed. Additional ESC measures to be installed where trees are located after clearing and grubbing. Will monitor weekly.
Sanitary Sewer Construction Inspection Partial 7/13/2018 at 9:15 AM 07/13/2018
PW-Main inspection
Informational
07/13/2018
Brice Lawson 07/13/2018 11:32 AM Redford Construction has core drilled the existing MH A-7 in two locations (west and north). Approx. 28' of 8" SDR 26 PVC pipe has been installed from MH A-7 towards the west on line A. Approx. 112' of 8" SDR 26 PVC pipe has been installed from MH A-7 towards the north on line 1. The pipe is being bedded in clean rock. A walk behind compactor plate is being used to compact the trench bottom and the top of the bedding rock once the final lift of rock is placed or the pipe. There appeared to be at least 6" of clearance from the outside edge of the pipe to the trench wall. The contractor plans to install the marker tape approx. 2' below final grade. I mentioned to them that the plans show a change in elevation to the tops of MH A-7 and A-6.
Sanitary Sewer Construction Inspection Partial 7/13/2018 at 1:00 PM 07/16/2018
PW-Main inspection
Informational
07/13/2018
Brice Lawson 07/13/2018 11:32 AM Redford Construction has core drilled the existing MH A-7 in two locations (west and north). Approx. 28' of 8" SDR 26 PVC pipe has been installed from MH A-7 towards the west on line A. Approx. 112' of 8" SDR 26 PVC pipe has been installed from MH A-7 towards the north on line 1. The pipe is being bedded in clean rock. A walk behind compactor plate is being used to compact the trench bottom and the top of the bedding rock once the final lift of rock is placed or the pipe. There appeared to be at least 6" of clearance from the outside edge of the pipe to the trench wall. The contractor plans to install the marker tape approx. 2' below final grade. I mentioned to them that the plans show a change in elevation to the tops of MH A-7 and A-6.
PW-Main inspection
Informational
07/16/2018
Brice Lawson 07/16/2018 7:54 AM Redford Construction continues to install the 8" PVC sanitary sewer betweeen MH A-7 and MH 1-1. I did not notice any stakes marking the service wyes and asked the contractor if the service wyes were being installed. The service wyes were not being installed and he planned to go back and install the service wyes for lots 92 and 102.
PW-Main inspection
Informational
07/16/2018
Brice Lawson 07/16/2018 7:57 AM It appears that the service wyes and anodes have been installed for lots 92 and 102. The sanitary main has been covered with rock where the service wyes were installed and the main was not visible. The tracer wire for the anodes was visible in the trench. The 8" SDR 26 sanitary main has been installed to approx. STA. 1+54 on sanitary line 1.
Sanitary Sewer Construction Inspection Partial 7/13/2018 07/17/2018
PW-Main inspection
Informational
07/16/2018
Brice Lawson 07/13/2018 11:32 AM Redford Construction has core drilled the existing MH A-7 in two locations (west and north). Approx. 28' of 8" SDR 26 PVC pipe has been installed from MH A-7 towards the west on line A. Approx. 112' of 8" SDR 26 PVC pipe has been installed from MH A-7 towards the north on line 1. The pipe is being bedded in clean rock. A walk behind compactor plate is being used to compact the trench bottom and the top of the bedding rock once the final lift of rock is placed or the pipe. There appeared to be at least 6" of clearance from the outside edge of the pipe to the trench wall. The contractor plans to install the marker tape approx. 2' below final grade. I mentioned to them that the plans show a change in elevation to the tops of MH A-7 and A-6.
PW-Main inspection
Informational
07/16/2018
Brice Lawson 07/16/2018 7:54 AM Redford Construction continues to install the 8" PVC sanitary sewer betweeen MH A-7 and MH 1-1. I did not notice any stakes marking the service wyes and asked the contractor if the service wyes were being installed. The service wyes were not being installed and he planned to go back and install the service wyes for lots 92 and 102.
PW-Main inspection
Informational
07/16/2018
Brice Lawson 07/16/2018 7:57 AM It appears that the service wyes and anodes have been installed for lots 92 and 102. The sanitary main has been covered with rock where the service wyes were installed and the main was not visible. The tracer wire for the anodes was visible in the trench. The 8" SDR 26 sanitary main has been installed to approx. STA. 1+54 on sanitary line 1.
Sanitary Sewer Construction Inspection Passed 7/16/2018 07/17/2018
PW-Main inspection
Informational
07/17/2018
Brice Lawson 07/13/2018 11:32 AM Redford Construction has core drilled the existing MH A-7 in two locations (west and north). Approx. 28' of 8" SDR 26 PVC pipe has been installed from MH A-7 towards the west on line A. Approx. 112' of 8" SDR 26 PVC pipe has been installed from MH A-7 towards the north on line 1. The pipe is being bedded in clean rock. A walk behind compactor plate is being used to compact the trench bottom and the top of the bedding rock once the final lift of rock is placed or the pipe. There appeared to be at least 6" of clearance from the outside edge of the pipe to the trench wall. The contractor plans to install the marker tape approx. 2' below final grade. I mentioned to them that the plans show a change in elevation to the tops of MH A-7 and A-6.
PW-Main inspection
Informational
07/17/2018
Brice Lawson 07/16/2018 7:54 AM Redford Construction continues to install the 8" PVC sanitary sewer betweeen MH A-7 and MH 1-1. I did not notice any stakes marking the service wyes and asked the contractor if the service wyes were being installed. The service wyes were not being installed and he planned to go back and install the service wyes for lots 92 and 102.
PW-Main inspection
Informational
07/17/2018
Brice Lawson 07/16/2018 7:57 AM It appears that the service wyes and anodes have been installed for lots 92 and 102. The sanitary main has been covered with rock where the service wyes were installed and the main was not visible. The tracer wire for the anodes was visible in the trench. The 8" SDR 26 sanitary main has been installed to approx. STA. 1+54 on sanitary line 1.
Sanitary Sewer Construction Inspection Partial 7/16/2018 07/17/2018
Informational
07/17/2018
Tom Chandler 07/17/2018 9:07 AM Installed 175 L/F of 8" SDR 26 from existing MH A-7 towards MH A-8.
Sanitary Sewer Construction Inspection Partial 7/17/2018 at 1:45 PM 07/17/2018
Informational
07/17/2018
Tom Chandler 07/17/2018 4:42 PM Installed laterals for lots 92,93 and 102. Installed tracer wire and trench checks. Will backfill lots 92 and 93 with testing lab on-site for moisture/density testing in roadway.
Sanitary Sewer Construction Inspection Partial 7/18/2018 at 8:15 AM 07/18/2018
Informational
07/18/2018
Tom Chandler 07/18/2018 11:37 AM Breaking rock today. No pipe to be installed because of weather.
Sanitary Sewer Construction Inspection Partial 7/19/2018 at 8:45 AM 07/19/2018
Informational
07/19/2018
Tom Chandler 07/19/2018 10:53 AM Contractor installing sanitary sewer main today starting at MH A-8.
Sanitary Sewer Construction Inspection Partial 7/19/2018 at 2:30 PM 07/19/2018
Informational
07/19/2018
Tom Chandler 07/19/2018 3:27 PM Installed 84 L/F of 8" SDR 26.
Sanitary Sewer Construction Inspection Partial 7/23/2018 at 2:00 PM 07/25/2018
Informational
07/25/2018
Tom Chandler 07/25/2018 6:57 AM Installed 8" SDR 26 sanitary sewer main up to station 1+75. Installed MH A-8.
Sanitary Sewer Construction Inspection Partial 7/24/2018 07/26/2018
Informational
07/26/2018
Tom Chandler 07/26/2018 12:45 PM Installed line A up to station 3+25. Installed MH A-9 as well. Stacked and wrapped as well.
Sanitary Sewer Construction Inspection Partial 7/25/2018 07/26/2018
Informational
07/26/2018
Tom Chandler 07/26/2018 1:26 PM Installed up to station 6+65. Installed MH A-10 and stacked and wrapped as well. Backfilled as well.
Sanitary Sewer Construction Inspection Partial 7/26/2018 at 8:00 AM 07/26/2018
Informational
07/26/2018
Tom Chandler 07/26/2018 1:28 PM Installed up to station 7+50. Plugged and stopped work for the day due to rain.
Detention Basin Partial 7/25/2018 at 2:00 PM 07/26/2018
Informational
07/26/2018
Tom Chandler 07/26/2018 1:30 PM Began converting temporary sediment basin to detention basin. Grading contractor has cut channel towards creek and slopes have been built up as well. Met with Thomas Hudgens on-site to discuss plan for timing of structure to be nstalled as well as stabilization. Installed more rock checks in the drainage channel. Additional ESC devices and measures still needed on the slopes.
Sanitary Sewer Construction Inspection Partial 7/27/2018 at 2:00 PM 07/30/2018
PW-Main inspection
Informational
07/30/2018
Brice Lawson 07/30/2018 8:04 AM On 7/27/18 Redford Construction informed me that they installed 60' of 8" sanitary main into MH-11. It appeared that the main was bedded in clean rock. They were in the process of installing the inverts in MH's 8, 10 and 11. Spencer with KC Testing was on site performing compaction testing on the sanitary main trench backfill. The road crossings that are near MH-10. Spencer let me know that the compaction test results were within specfications.
Detention Basin Partial 7/27/2018 at 3:01 PM 07/30/2018
Informational
07/30/2018
Brice Lawson 07/30/2018 8:19 AM On 7/27/18 silt fence has been installed below the permanent detention basin. The silt fence has been installed in a continuous run. It does not appear that there is enough ESC measures in place to control erosion in and below the detention basin. I informed Tom C. of this and he is aware and plans to follow up with contractor.
Sanitary Sewer Construction Inspection Partial 8/16/2018 08/16/2018
Informational
08/16/2018
Tom Chandler 08/16/2018 4:16 PM Contractor installed sanitary sewer main line 1 up to station 9+06. Installed MH 1-2 and MH 1-3. Installed service wyes as well.
Sanitary Sewer Construction Inspection Partial 8/27/2018 at 10:00 AM 08/27/2018
Informational
08/27/2018
Tom Chandler 08/27/2018 3:23 PM Installing sanitary sewer laterals for lots between MH 1-1 and MH 1-2.
Storm Sewer Construction Inspection Partial 8/29/2018 08/30/2018
Informational
08/30/2018
Tom Chandler 08/30/2018 2:24 PM Began storm sewer construction on 8/29/2018. Installed 36" HDPE pipe.
Site Visit Complete 8/31/2018 at 8:30 AM 09/04/2018
PW-Misc
Informational
09/04/2018
Brice Lawson 09/04/2018 8:39 AM On 8/31/18 I was covering this project in Tom's absence. I went by the job aroung 8:30 in the morning and around 1:45 in the afternoon. The site was wet due to rain. There did not appear to be any activity at the site due to the weather. The streets were free of debris.
Storm Sewer Construction Inspection Partial 9/5/2018 09/05/2018
Informational
09/05/2018
Tom Chandler 09/05/2018 1:46 PM Contractor finished installing storm sewer line 10. Installed FES 10-1 and poured toe wall. Installed 36" HDPE and CI 10-2 and CI 10-3.
Storm Sewer Construction Inspection Partial 9/10/2018 at 11:00 AM 09/11/2018
Informational
09/11/2018
Tom Chandler 09/11/2018 11:25 AM Worked on storm line 9 yesterday. Working on storm line 8 this morning.
Storm Sewer Construction Inspection Partial 9/25/2018 09/25/2018
PW-Storm Sewer Inspection
Corrective Action Required
09/25/2018
Corrections need to be made to the Storm Sewer Tom Chandler 09/25/2018 2:40 PM Proposed curb inlet 7-3 is directly above an existing sanitary sewer service lateral for lot 82. Sewer lateral was installed as part of the 2nd Plat. Talked with Sue Pyles and she stated it would be acceptable to relocate the service lateral to the south of the proposed curb inlet 7-3. This will provide the clearances needed for the storm and sewer.
Storm Sewer Construction Inspection Partial 9/25/2018 09/25/2018
PW-Storm Sewer Inspection
Corrective Action Required
09/25/2018
Corrections need to be made to the Storm Sewer Tom Chandler 09/25/2018 Proposed curb inlet 7-3 is directly above an existing sanitary sewer service lateral for lot 82. Sewer lateral was installed as part of the 2nd Plat. Talked with Sue Pyles and she stated it would be acceptable to relocate the service lateral to the south of the proposed curb inlet 7-3. This will provide the clearances needed for the storm and sewer.
PW-Storm Sewer Inspection
Resolved
09/25/2018
Corrections need to be made to the Storm Sewer Tom Chandler 09/25/2018 2:47 PM Talked to Chad with Redford Construction after lunch. Informed him of the acceptable solution for the storm and sanitary sewers related to the existing service lateral for lot 82 and proposed curb inlet 7-3. He will move the service lateral 5 feet south of the proposed curb inlet 7-3 and use the existing wye. He will maintain his 18" of vertical seperation as well.
Sanitary Sewer - Air Test Partial 10/3/2018 at 7:30 AM 10/04/2018
Informational
10/04/2018
Tom Chandler 10/04/2018 3:34 PM Air tested Line 1. tested from existing MH A-7 to MH 1-1 for 7m34s and from MH 1-2 to MH 1-3 for 8m48s. both sections passed. Tested Line A from MH A-9 to MH A-10 for 8m36s and from MH A-10 to MH A-11 for 7m34s. Both sections passed.
Sanitary Sewer - Air Test Failed 10/3/2018 at 7:30 AM 10/04/2018
PW-Sanitary Sewer Testing
Corrective Action Required
10/04/2018
Sanitary Sewer Testing needs to be completed. Tom Chandler 10/04/2018 3:45 PM Air tested from MH 1-1 to MH 1-2. Line would not air up. Contractor will need to locate problem and make repairs. Will have to wait 30 days after repairs have been made to retest.
Sanitary Sewer - Vacuum Partial 10/3/2018 at 7:30 AM 10/04/2018
Informational
10/04/2018
Tom Chandler 10/04/2018 3:48 PM Vacuum tested Manholes 1-1 and MH 1-3 for 2m30s. Both passed test. Vacuum tested MH A-9,A-10 and A-11 for 2m30s. All passed testing.
Sanitary Sewer - Vacuum Failed 10/3/2018 at 7:30 AM 10/04/2018
PW-Misc
Corrective Action Required
10/04/2018
Tom Chandler 10/04/2018 3:51 PM Manhole 1-2 failed vacuum test. Will need to make repairs and retest.
Site Visit Complete 10/31/2018 10/31/2018
Misc
Informational
10/31/2018
Begin installing fly ash today.
Pavement-Stabilized Subgrade Partial 10/31/2018 10/31/2018
Misc
Informational
10/31/2018
Fly ash installed today. KCTE was on site for testing. Willl finish subgrade stabilization tomorrow.
Pavement-Stabilized Subgrade Partial 11/1/2018 11/01/2018
Misc
Informational
10/31/2018
Fly ash installed today. KCTE was on site for testing. Willl finish subgrade stabilization tomorrow.
Misc
Informational
11/01/2018
Contractor installing fly ash again today. KCTE will be testing as well.
Pavement-Stabilized Subgrade Passed 11/8/2018 11/08/2018
Misc
Informational
11/01/2018
Fly ash installed today. KCTE was on site for testing. Willl finish subgrade stabilization tomorrow.
Misc
Informational
11/01/2018
Contractor installing fly ash again today. KCTE will be testing as well.
Misc
Informational
11/08/2018
Tom Chandler 11/08/2018 2:24 PM Subgrade stabilization has been completed and tested by KCTE. Awaiting proof roll testing prior to MODOT type 5 base rock installation. Proof roll has been delayed due to weather.
Pavement-Aggregate Base Failed 11/19/2018 11/19/2018
Misc
Corrective Action Required
11/19/2018
John Jackson and I observed the proof roll for the curbs. The test failed. The contractor will reschedule at a later date.
Water Line - Construction Inspection Partial 12/04/2018
Misc
Informational
12/04/2018
The Redford Construction crew is installing the 12” C900 water line along SW Georgetown east of SW Stoney creek Dr. They currently have approximately 28’ft installed. I will return for further inspection.
Water Line - Construction Inspection Partial 12/4/2018 12/05/2018
Misc
Informational
12/04/2018
The Redford Construction crew is installing the 12” C900 water line along SW Georgetown east of SW Stoney creek Dr. They currently have approximately 28’ft installed. I will return for further inspection.
Misc
Informational
12/05/2018
The Redford crew installed the 12” water line along SW Georgetown DR from station 0+00 to 4+86.16 They relocated the the permanent Hydrant assembly at station 4+09.71 and poured the thrust blocks. At the cap end near 0+00 the crew poured the straddle block for the testing purpose. The install appears to match the approved plans and meets the City of LS standard specifications.
Water Line - Construction Inspection Partial 12/6/2018 12/11/2018
Misc
Informational
12/05/2018
The Redford Construction crew is installing the 12” C900 water line along SW Georgetown east of SW Stoney creek Dr. They currently have approximately 28’ft installed. I will return for further inspection.
Misc
Informational
12/05/2018
The Redford crew installed the 12” water line along SW Georgetown DR from station 0+00 to 4+86.16 They relocated the the permanent Hydrant assembly at station 4+09.71 and poured the thrust blocks. At the cap end near 0+00 the crew poured the straddle block for the testing purpose. The install appears to match the approved plans and meets the City of LS standard specifications.
Misc
Informational
12/11/2018
The Redford crew is continuing the 12” water line along SW Georgetown Dr.
Water Line - Construction Inspection Partial 12/12/2018 at 9:00 AM 12/12/2018
Misc
Informational
12/11/2018
The Redford Construction crew is installing the 12” C900 water line along SW Georgetown east of SW Stoney creek Dr. They currently have approximately 28’ft installed. I will return for further inspection.
Misc
Informational
12/11/2018
The Redford crew installed the 12” water line along SW Georgetown DR from station 0+00 to 4+86.16 They relocated the the permanent Hydrant assembly at station 4+09.71 and poured the thrust blocks. At the cap end near 0+00 the crew poured the straddle block for the testing purpose. The install appears to match the approved plans and meets the City of LS standard specifications.
Misc
Informational
12/11/2018
The Redford crew is continuing the 12” water line along SW Georgetown Dr.
Misc
Informational
12/12/2018
John DiMauro 12/12/2018 9:15 AM The Redford crew is working on water line 7. The crew is working at station 9+56.97 They are digging to prepare to install pipe.
Water Line - Construction Inspection Partial 12/14/2018 12/14/2018
Misc
Informational
12/14/2018
The RedFord crew is installing the thrust blocks and straddle blocks for the hydrants for stations 3+60 and 6+29.27 on water line 6.
Water Line - Hydrostatic Test Passed 12/18/2018 12/18/2018
Misc
Informational
12/18/2018
The Redford crew performed the hydrostatic pressure test on the 12” line segment from station 0+00 to the connection at 4+86.16 The line held at 150 psi for 2 hours. Test passed.
Water Line - Hydrostatic Test Passed 01/15/2019
Misc
Informational
01/15/2019
The Redford Construction crew performed the hydro test on the entire water system for the subdivision including water lines 1 & 2 for The Manor at Stoney Creek. I observed the crew pressurize the line to 150 psi and remained on site to verify that the line held for two hours. The test passed.
Water Line - Construction Inspection Partial 12/12/2018 01/28/2019
Misc
Informational
12/12/2018
The Redford Construction crew is installing the 12” C900 water line along SW Georgetown east of SW Stoney creek Dr. They currently have approximately 28’ft installed. I will return for further inspection.
Misc
Informational
12/12/2018
The Redford crew installed the 12” water line along SW Georgetown DR from station 0+00 to 4+86.16 They relocated the the permanent Hydrant assembly at station 4+09.71 and poured the thrust blocks. At the cap end near 0+00 the crew poured the straddle block for the testing purpose. The install appears to match the approved plans and meets the City of LS standard specifications.
Misc
Informational
12/12/2018
The Redford crew is continuing the 12” water line along SW Georgetown Dr.
Misc
Informational
12/12/2018
John DiMauro 12/12/2018 9:15 AM The Redford crew is working on water line 7. The crew is working at station 9+56.97 They are digging to prepare to install pipe.
Misc
Informational
01/28/2019
The Redford Construction crew chlorinated the entire water line system. I was present during the process and verified the proper method and amount of chlorine was injected into the line. We will flush the line tomorrow 1/29/19 and pull samples for testing the following day.
Water Line - Construction Inspection Partial 12/14/2018 02/01/2019
Misc
Informational
12/14/2018
The RedFord crew is installing the thrust blocks and straddle blocks for the hydrants for stations 3+60 and 6+29.27 on water line 6.
Misc
Informational
02/01/2019
The Redford crew flushed the entire water line for Stoney Creek 3rd Plat. I was on site and verified that they flushed the water correctly and dechlorinated the water.
Water Line - Coliform Test 1 Partial 2/4/2019 02/04/2019
Misc
Informational
02/04/2019
The Redford Construction crew pulled water samples for the entire water line including the two dead end lines for the Manor at Stoney Creek. I was on site during work and collected and delivered the samples to Keystone Labs for testing. We will know the results of the tests in 24 hours.
Water Line - Coliform Test 2 Partial 2/5/2019 02/05/2019
Misc
Informational
02/05/2019
We collected the day 2 samples for the entire water line including the Manor at Stoney creek. We delivered the samples to Keystone Labs. We will know the results in 24 hours.
Water Line - Coliform Test 1 Passed 2/11/2019 02/11/2019
Misc
Informational
02/04/2019
The Redford Construction crew pulled water samples for the entire water line including the two dead end lines for the Manor at Stoney Creek. I was on site during work and collected and delivered the samples to Keystone Labs for testing. We will know the results of the tests in 24 hours.
Water Line - Coliform Test 2 Passed 2/11/2019 02/11/2019
Misc
Informational
02/05/2019
We collected the day 2 samples for the entire water line including the Manor at Stoney creek. We delivered the samples to Keystone Labs. We will know the results in 24 hours.
Misc
Informational
02/11/2019
John DiMauro 02/11/2019 3:15 PM The day 1 & 2 samples passed the bacteria tests. Today we put the lines in service.
Water Line - Construction Inspection Partial 2/13/2019 02/13/2019
Misc
Informational
02/01/2019
The RedFord crew is installing the thrust blocks and straddle blocks for the hydrants for stations 3+60 and 6+29.27 on water line 6.
Misc
Informational
02/01/2019
The Redford crew flushed the entire water line for Stoney Creek 3rd Plat. I was on site and verified that they flushed the water correctly and dechlorinated the water.
Misc
Informational
02/13/2019
The Redford Construction crew connected the new Water Line # 1 to the existing line and fire hydrant assembly at station 0+00. I verified the correct materials were used and that the thrust blocks installed were sufficient and meet the standard specifications.
Water Line - Construction Inspection Partial 2/14/2019 02/19/2019
Misc
Informational
02/13/2019
The RedFord crew is installing the thrust blocks and straddle blocks for the hydrants for stations 3+60 and 6+29.27 on water line 6.
Misc
Informational
02/13/2019
The Redford crew flushed the entire water line for Stoney Creek 3rd Plat. I was on site and verified that they flushed the water correctly and dechlorinated the water.
Misc
Informational
02/13/2019
The Redford Construction crew connected the new Water Line # 1 to the existing line and fire hydrant assembly at station 0+00. I verified the correct materials were used and that the thrust blocks installed were sufficient and meet the standard specifications.
Misc
Informational
02/19/2019
The Redford Construction crew completed the water system install. Today the crew installed the remainder of water line #3. The crew set the fire hydrant assembly and connected to the existing water line at station 1+14.80. The thrust blocks were poured and the crew will be back at a later date to backfill once the concrete sets up. The crew also completed the water line #2 install for The Manor at Stoney Creek 3rd Plat. The crew converted the temporary fire hydrant to a permanent assembly and connected to the existing main at station 0+97.89 Thrust blocks were poured and the crew will be back at a later date to backfill once the concrete sets up.
Pavement-Proof Roll Passed 7/2/2019 07/02/2019
Misc
Informational
07/02/2019
The Randy Spalding crew proof rolled the fly ash treated sub-grade for this project. I observed the proof roll and verified the correct weight loaded on the truck. The roll test passed.
Curb - Proof Roll Passed 7/9/2019 07/09/2019
Misc
Informational
07/09/2019
I observed the proof roll of the curb line for the public roads at The Reserve / Manor at Stoney Creek. I verified the correct truck type and load weight. The roll test passed. The curb crew plans to start the curb install on Thursday 7/11/19.
Public Curb Inspection Partial 7/12/2019 07/12/2019
Misc
Informational
07/12/2019
JK Concrete is installing the public curb for both The Reserve and The Manor roads. I verified that the correct concrete type is being poured and the correct equipment and material is being used. The crew will have a little more than half of the curb installed and plans to finish the install on Monday 7/15/19.
Public Curb Inspection Partial 7/15/2019 07/15/2019
Misc
Informational
07/12/2019
JK Concrete is installing the public curb for both The Reserve and The Manor roads. I verified that the correct concrete type is being poured and the correct equipment and material is being used. The crew will have a little more than half of the curb installed and plans to finish the install on Monday 7/15/19.
Misc
Informational
07/15/2019
JK Concrete is continuing the public curb install. KC Testing is on site performing the required testing of the concrete. I verified that the correct concrete mix is being installed and that the correct equipment and materials are being used.
Pavement-Proof Roll Passed 07/18/2019
Misc
Informational
07/18/2019
I observed the proof roll for the public streets for this subdivision. I verified the correct truck and load weight. The proof roll passed inspection.
Pavement-Surface Partial 7/20/2019 07/20/2019
Misc
Informational
07/20/2019
Superior Bowen is on site installing the base lift for both The Reserve & Manor at Stoney Creek. I verified the correct mix type, temperature and equipment for the job. The crew plans to install the surface lift on Monday 7/22/19.
Street - Surface Course Partial 7/23/2019 07/23/2019
Misc
Informational
07/23/2019
The Superior Bowen crew is on site installing the surface lift for both The Reserve & Manor at Stoney Creek. I verified the correct mix type, Temperature and equipment for the install.
Erosion Control Inspection Failed 07/24/2019
PW-Erosion and Sediment Control
Corrective Action Required
07/24/2019
Your project is in violation of the Erosion and Sediment control policy. ESC devices need to be installed throughout the entire site in efforts to keep silt and mud from leaving the site and infiltrating the storm water collection system. The disturbed areas need to be stabilized and sufficient erosion control devices need to be installed. All of the storm inlets need ESC devices properly installed. A stop work or will be posted if the corrections have not been made with in two business days.
ADA Inspection Partial 08/09/2019
Misc
Informational
08/09/2019
JK Concrete is on site installing the ADA ramps and a section of the public sidewalk for the subdivision. I inspected the ramp forms and verified the subgrade is in compliance. I will return for further inspection after the concrete has been poured.
ADA Inspection Passed 8/13/2019 08/19/2019
Misc
Informational
08/09/2019
JK Concrete is on site installing the ADA ramps and a section of the public sidewalk for the subdivision. I inspected the ramp forms and verified the subgrade is in compliance. I will return for further inspection after the concrete has been poured.
Misc
Informational
08/19/2019
The ADA Ramps are in compliance.
Sidewalk Inspection Passed 08/19/2019
Misc
Informational
08/19/2019
The sidewalk along SW Georgetown DR to the west of SW Amethyst DR has been installed and meets ADA requirements.
Street - Surface Course Passed 11/13/2019
Install Street and Stop Signs Passed 11/13/2019
Curb - Compression Strength Passed 11/13/2019
Storm - Material Verification Passed 11/13/2019
Storm - Pipe Complete 11/13/2019
Storm - Outlet Structure Complete 11/13/2019
Storm - Rip Rap Complete 11/13/2019
Storm - Swales Complete 11/13/2019
Sanitary Sewer Construction Inspection Complete 11/13/2019
Storm Sewer Construction Inspection Complete 11/13/2019
PW-Storm Sewer Inspection
Corrective Action Required
09/25/2018
Corrections need to be made to the Storm Sewer Tom Chandler 09/25/2018 Proposed curb inlet 7-3 is directly above an existing sanitary sewer service lateral for lot 82. Sewer lateral was installed as part of the 2nd Plat. Talked with Sue Pyles and she stated it would be acceptable to relocate the service lateral to the south of the proposed curb inlet 7-3. This will provide the clearances needed for the storm and sewer.
Sanitary Sewer - Mandrel Complete 11/13/2019
Sanitary Sewer - Air Test Complete 11/13/2019
PW-Sanitary Sewer Testing
Corrective Action Required
10/04/2018
Sanitary Sewer Testing needs to be completed. Tom Chandler 10/04/2018 3:45 PM Air tested from MH 1-1 to MH 1-2. Line would not air up. Contractor will need to locate problem and make repairs. Will have to wait 30 days after repairs have been made to retest.
Sanitary Sewer - Vacuum Complete 11/13/2019
PW-Misc
Corrective Action Required
10/04/2018
Tom Chandler 10/04/2018 3:51 PM Manhole 1-2 failed vacuum test. Will need to make repairs and retest.
Pavement-Aggregate Base Complete 11/13/2019
Misc
Corrective Action Required
11/19/2018
John Jackson and I observed the proof roll for the curbs. The test failed. The contractor will reschedule at a later date.
Water Line - Construction Inspection Complete 11/13/2019
Misc
Informational
02/19/2019
The RedFord crew is installing the thrust blocks and straddle blocks for the hydrants for stations 3+60 and 6+29.27 on water line 6.
Misc
Informational
02/19/2019
The Redford crew flushed the entire water line for Stoney Creek 3rd Plat. I was on site and verified that they flushed the water correctly and dechlorinated the water.
Misc
Informational
02/19/2019
The Redford Construction crew connected the new Water Line # 1 to the existing line and fire hydrant assembly at station 0+00. I verified the correct materials were used and that the thrust blocks installed were sufficient and meet the standard specifications.
Misc
Informational
02/19/2019
The Redford Construction crew completed the water system install. Today the crew installed the remainder of water line #3. The crew set the fire hydrant assembly and connected to the existing water line at station 1+14.80. The thrust blocks were poured and the crew will be back at a later date to backfill once the concrete sets up. The crew also completed the water line #2 install for The Manor at Stoney Creek 3rd Plat. The crew converted the temporary fire hydrant to a permanent assembly and connected to the existing main at station 0+97.89 Thrust blocks were poured and the crew will be back at a later date to backfill once the concrete sets up.
Public Curb Inspection Complete 11/13/2019
Misc
Informational
07/15/2019
JK Concrete is installing the public curb for both The Reserve and The Manor roads. I verified that the correct concrete type is being poured and the correct equipment and material is being used. The crew will have a little more than half of the curb installed and plans to finish the install on Monday 7/15/19.
Misc
Informational
07/15/2019
JK Concrete is continuing the public curb install. KC Testing is on site performing the required testing of the concrete. I verified that the correct concrete mix is being installed and that the correct equipment and materials are being used.
Pavement-Surface Complete 11/13/2019
Misc
Informational
07/20/2019
Superior Bowen is on site installing the base lift for both The Reserve & Manor at Stoney Creek. I verified the correct mix type, temperature and equipment for the job. The crew plans to install the surface lift on Monday 7/22/19.
Sanitary Sewer Construction Inspection Complete 11/13/2019
Water - Material Verification Complete 11/13/2019
Water Line - Valve Complete 11/13/2019
Water Line - Fire Hydrant Complete 11/13/2019
Water Line - Thrust Restraint Complete 11/13/2019
Water Line - Construction Taps Removed Complete 11/13/2019
Water Line - Construction Inspection Complete 11/13/2019
Sanitary - Material Verification Complete 11/13/2019
Sanitary Sewer Construction Inspection Complete 11/13/2019
Sanitary Sewer - Invert Complete 11/13/2019
Install Street and Stop Signs Complete 11/13/2019
Storm - Material Verification Complete 11/13/2019
Sanitary Sewer Construction Inspection Complete 11/13/2019
Water - Material Verification Complete 11/13/2019
Water Line - Construction Inspection Complete 11/13/2019
Sanitary - Material Verification Complete 11/13/2019
Sanitary Sewer Construction Inspection Complete 11/13/2019
Install Street and Stop Signs Complete 11/13/2019
Storm - Material Verification Complete 11/13/2019
Master Drainage As-built Inspection Passed 11/15/2019 11/13/2019
Detention Basin Partial 03/19/2020
Misc
Corrective Action Required
03/19/2020
During and after the rain event over the last two days the detention basin is holding a significant amount of water but does not appear to be nearing capacity and appears to be functioning as designed. I will continue to monitor the basin levels and inspect for silt and sediment build up over the next 48 hours to ensure that it is continuing to function properly.
Erosion Control Inspection Failed 07/21/2020
PW-Erosion and Sediment Control
Resolved
07/21/2020
Your project is in violation of the Erosion and Sediment control policy. ESC devices need to be installed throughout the entire site in efforts to keep silt and mud from leaving the site and infiltrating the storm water collection system. The disturbed areas need to be stabilized and sufficient erosion control devices need to be installed. All of the storm inlets need ESC devices properly installed. A stop work or will be posted if the corrections have not been made with in two business days.
PW-Erosion and Sediment Control
Corrective Action Required
07/21/2020
Your project is in violation of the Erosion and Sediment control policy. After the heavy rain even there are a number of inlet protection devices that have failed. They are filled with silt and construction debris and allowing silt and debris to bypass and collect into the inlets. Please make corrections to the devices asap.
Erosion Control Inspection Passed 7/22/2020 7/22/2020 07/22/2020
PW-Erosion and Sediment Control
Resolved
07/22/2020
Your project is in violation of the Erosion and Sediment control policy. After the heavy rain even there are a number of inlet protection devices that have failed. They are filled with silt and construction debris and allowing silt and debris to bypass and collect into the inlets. Please make corrections to the devices asap.
Misc
Informational
07/22/2020
The inlet protection devices have been cleaned and replaced. No further corrections required at this time.
Record Drawing Review Passed 1/28/2022 07/19/2022
Storm Sewer Construction Inspection Passed 4/25/2022 07/19/2022
Misc
Informational
04/26/2022
On 4.7.2022 Redford Construction began working Storm Line 10 removing riprap. On 4.8.2022 Redford Construction began working Storm Line 11 On 4.11.2022 Redford Construction began working Storm Line 12 On 4.12.2022 Redford Construction put down erosion control matting
Documents & Images
Date Uploaded File Type Document Name
02/23/2018 Receipt Receipt for transaction: 2018-000665
02/23/2018 Receipt Receipt for transaction: 2018-000666
06/22/2018 Letter DE-Permit
06/23/2018 DOC062318-06232018072447
07/16/2018 Letter DE-Daily Inspection Summary
07/18/2018 Letter DE-Daily Inspection Summary
07/19/2018 Letter DE-Daily Inspection Summary
07/26/2018 Letter DE-Daily Inspection Summary
07/30/2018 Letter DE-Daily Inspection Summary
08/16/2018 Letter DE-Daily Inspection Summary
08/27/2018 Letter DE-Daily Inspection Summary
08/30/2018 Letter DE-Daily Inspection Summary
09/05/2018 Letter DE-Daily Inspection Summary
09/25/2018 Letter DE-Daily Inspection Summary
10/04/2018 Letter DE-Daily Inspection Summary
10/31/2018 image
10/31/2018 image0
10/31/2018 Letter Inspection Summary
11/01/2018 Letter Inspection Summary
11/08/2018 Letter DE-Daily Inspection Summary
11/19/2018 Letter INSPECTION SUMMARY
12/04/2018 image1
12/04/2018 Letter INSPECTION SUMMARY
12/05/2018 Hydrant at 4+09.71
12/05/2018 Hydrant 4+09.71
12/05/2018 Hydrant 4+09.72
12/05/2018 Straddle block at 0+00
12/05/2018 Cap at existing tie in location
12/05/2018 Letter INSPECTION SUMMARY
12/11/2018 DD6E279D-5E41-4289-B8BA-BBB8055F34D0
12/11/2018 Letter INSPECTION SUMMARY
12/12/2018 Letter DE-Daily Inspection Summary
12/14/2018 image2
12/14/2018 image3
12/14/2018 image4
12/14/2018 image5
12/14/2018 Letter INSPECTION SUMMARY
12/14/2018 Letter INSPECTION SUMMARY
12/18/2018 Letter INSPECTION SUMMARY
01/15/2019 Letter INSPECTION SUMMARY
01/28/2019 Letter INSPECTION SUMMARY
02/01/2019 Letter INSPECTION SUMMARY
02/04/2019 Letter INSPECTION SUMMARY
02/05/2019 Letter INSPECTION SUMMARY
02/11/2019 Letter DE-Daily Inspection Summary
02/11/2019 WO#1B90177 - City of Lees Summit
02/11/2019 WO#1B90228 - City of Lees Summit
02/13/2019 image6
02/13/2019 image7
02/13/2019 image8
02/13/2019 image9
02/13/2019 Letter INSPECTION SUMMARY
02/19/2019 Letter INSPECTION SUMMARY
02/19/2019 Letter INSPECTION SUMMARY
02/19/2019 Letter INSPECTION SUMMARY
02/19/2019 image10
07/02/2019 Letter INSPECTION SUMMARY
07/09/2019 Letter INSPECTION SUMMARY
07/12/2019 Letter INSPECTION SUMMARY
07/15/2019 Letter INSPECTION SUMMARY
07/18/2019 Letter INSPECTION SUMMARY
07/20/2019 Letter INSPECTION SUMMARY
07/23/2019 Letter INSPECTION SUMMARY
07/24/2019 Letter INSPECTION SUMMARY
08/09/2019 Letter INSPECTION SUMMARY
08/19/2019 Letter INSPECTION SUMMARY
08/19/2019 Letter INSPECTION SUMMARY
11/18/2019 Letter DE-Punch List
11/18/2019 Letter DE-Certificate of Substantial Completion Multiple Lot
11/19/2019 The Reserve at Stoney Creek 3rd Plat Signed Certificate of Substantial Completion
11/19/2019 The Reserve at Stoney Creek 3rd Plat Signed Punch List
12/04/2019 Receipt Receipt for transaction: 2019-007584
03/19/2020 Letter INSPECTION SUMMARY
07/21/2020 Letter INSPECTION SUMMARY
07/22/2020 Letter INSPECTION SUMMARY
09/30/2021 Security Document Maintenance Bond - Reserve at stoney Creek and Manor at Stoney Creek 3rd Plat Maintenance Bonds
10/26/2021 RESERVE 3RD ASBUILTS 11-14-2019
10/26/2021 RESERVE 3RD STREET AND STORM 11-14-2019
10/26/2021 RESERVE 3RD ASBULITS 11-14-2021
01/21/2022 Reserve at Stoney Creek 3rd Asbuilts 12-9-2021
03/09/2022 Receipt Receipt for transaction:2022-001267
03/11/2022 Approved Plans The Reserve at Stoney Creek, 3rd Plat - Storm Extension Approved 3.11.22
04/26/2022 Stoney Creek Manor and Reserve 3rd Final Payment Affidavits
07/21/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/31/2023 Letter DE-Certificate of Final Acceptance (Commercial)
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home