Summary


PRSITE20225556
Development - Site
Closed
CCRC of Lee's Summit LLC
DEVELOPMENT COMPLETE
Raintree Senior Living Facility - ESC & Mass Grading.
11/03/2022
03/28/2023
07/05/2024
Locations
Contacts
CCRC of Lee's Summit LLC, Address:6731 W. 121st St., Phone:(913) 730-1094  
Jordan Anderson, Address:Scenic Development, Phone:(913) 730-1094  
Julie Sellers, Address:Olsson Associates, Phone:(816) 361-1177  
Tom Mazacek, Address:703 19th Ave NE, Phone:(320) 363-4733  
Dennis Winkelman, Phone:(320) 241-1240  
CITY OF LEES SUMMIT MISSOURI, Address:220 SE GREEN ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 03/14/2023 03/20/2023
Scott Ready
Fees
Paid Fees Amount Paid Owing Date Paid
9110071-Site Grading Fee $1,397.86 $1,397.86 Paid 03/21/2023
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 03/21/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Partial 6/29/2023 6/29/2023 06/29/2023
Misc
Informational
06/29/2023
6/29/23 PS Erosion control silt fence has been installed at perimeter of project per plans. Equipment is being mobilizied on site
Erosion Control Inspection Partial 7/5/2023 7/5/2023 07/05/2023
Misc
Informational
06/29/2023
6/29/23 PS Erosion control silt fence has been installed at perimeter of project per plans. Equipment is being mobilizied on site 7-5-23 PS Silt fence has been installed at perimeter of project. Erosion control acceptable at time of inspection. Provide construction entrance prior to construction
Site Visit Partial 7/5/2023 7/5/2023 07/05/2023
Misc
Informational
07/05/2023
7-5-23 PS Crews on site have been mowing and pulling trees
Site Visit Partial 7/6/2023 7/6/2023 07/06/2023
Misc
Informational
07/05/2023
7-5-23 PS Crews on site have been mowing and pulling trees 7-6-23 PS Crew pulling trees and brush, hauling off site
Site Visit Partial 7/11/2023 7/11/2023 07/11/2023
Misc
Informational
07/06/2023
7-5-23 PS Crews on site have been mowing and pulling trees 7-6-23 PS Crew pulling trees and brush, hauling off site 7-11-23 PS Crew on site grading
Grading/Excavation/Fill Inspection Partial 7/12/2023 7/12/2023 07/12/2023
Misc
Informational
07/12/2023
7-5-23 PS Crews on site have been mowing and pulling trees 7-6-23 PS Crew pulling trees and brush, hauling off site 7-11-23 PS Crew on site grading 7-12-23 PS Crew on site grading
Erosion Control Inspection Partial 7/13/2023 7/13/2023 07/13/2023
Misc
Informational
07/05/2023
6/29/23 PS Erosion control silt fence has been installed at perimeter of project per plans. Equipment is being mobilizied on site 7-5-23 PS Silt fence has been installed at perimeter of project. Erosion control acceptable at time of inspection. Provide construction entrance prior to construction 7-13-23 PS Erosion control acceptable at time of inspection
Grading/Excavation/Fill Inspection Partial 7/13/2023 7/13/2023 07/13/2023
Misc
Informational
07/12/2023
7-5-23 PS Crews on site have been mowing and pulling trees 7-6-23 PS Crew pulling trees and brush, hauling off site 7-11-23 PS Crew on site grading 7-12-23 PS Crew on site grading 7-13-23 PS Crew on site grading soil
Grading/Excavation/Fill Inspection Partial 7/14/2023 7/14/2023 07/14/2023
Misc
Informational
07/13/2023
7-5-23 PS Crews on site have been mowing and pulling trees 7-6-23 PS Crew pulling trees and brush, hauling off site 7-11-23 PS Crew on site grading 7-12-23 PS Crew on site grading 7-13-23 PS Crew on site grading soil 7-14-23 PS Crew grading site and compacting soil, also excavating for sediment basin design
Grading/Excavation/Fill Inspection Partial 7/17/2023 7/17/2023 07/17/2023
Misc
Informational
07/14/2023
7-5-23 PS Crews on site have been mowing and pulling trees 7-6-23 PS Crew pulling trees and brush, hauling off site 7-11-23 PS Crew on site grading 7-12-23 PS Crew on site grading 7-13-23 PS Crew on site grading soil 7-14-23 PS Crew grading site and compacting soil, also excavating for sediment basin design 7-17-23 PS Crew grading site and compacting soil
Erosion Control Inspection Partial 7/17/2023 7/17/2023 07/17/2023
Misc
Informational
07/13/2023
6/29/23 PS Erosion control silt fence has been installed at perimeter of project per plans. Equipment is being mobilizied on site 7-5-23 PS Silt fence has been installed at perimeter of project. Erosion control acceptable at time of inspection. Provide construction entrance prior to construction 7-13-23 PS Erosion control acceptable at time of inspection 7-17-23 PS Erosion control acceptable at time of inspection. Crew has been excavating for the sediment basins on site
Erosion Control Inspection Partial 7/18/2023 7/18/2023 07/18/2023
Misc
Informational
07/17/2023
6/29/23 PS Erosion control silt fence has been installed at perimeter of project per plans. Equipment is being mobilizied on site 7-5-23 PS Silt fence has been installed at perimeter of project. Erosion control acceptable at time of inspection. Provide construction entrance prior to construction 7-13-23 PS Erosion control acceptable at time of inspection 7-17-23 PS Erosion control acceptable at time of inspection. Crew has been excavating for the sediment basins on site
Erosion Control Inspection Partial 7/19/2023 7/19/2023 07/19/2023
Misc
Informational
07/18/2023
6/29/23 PS Erosion control silt fence has been installed at perimeter of project per plans. Equipment is being mobilizied on site 7-5-23 PS Silt fence has been installed at perimeter of project. Erosion control acceptable at time of inspection. Provide construction entrance prior to construction 7-13-23 PS Erosion control acceptable at time of inspection 7-17-23 PS Erosion control acceptable at time of inspection. Crew has been excavating for the sediment basins on site
Grading/Excavation/Fill Inspection Partial 7/20/2023 7/20/2023 07/20/2023
Misc
Informational
07/17/2023
7-5-23 PS Crews on site have been mowing and pulling trees 7-6-23 PS Crew pulling trees and brush, hauling off site 7-11-23 PS Crew on site grading 7-12-23 PS Crew on site grading 7-13-23 PS Crew on site grading soil 7-14-23 PS Crew grading site and compacting soil, also excavating for sediment basin design 7-17-23 PS Crew grading site and compacting soil 7-20-23 PS Crew grading soil
Grading/Excavation/Fill Inspection Partial 7/21/2023 7/21/2023 07/21/2023
Misc
Informational
07/20/2023
7-5-23 PS Crews on site have been mowing and pulling trees 7-6-23 PS Crew pulling trees and brush, hauling off site 7-11-23 PS Crew on site grading 7-12-23 PS Crew on site grading 7-13-23 PS Crew on site grading soil 7-14-23 PS Crew grading site and compacting soil, also excavating for sediment basin design 7-17-23 PS Crew grading site and compacting soil 7-20-23 PS Crew grading soil 7-21-23 PS Crew on site performing grading and compaction of soil
Erosion Control Inspection Partial 7/24/2023 7/24/2023 07/24/2023
Misc
Informational
07/19/2023
6/29/23 PS Erosion control silt fence has been installed at perimeter of project per plans. Equipment is being mobilizied on site 7-5-23 PS Silt fence has been installed at perimeter of project. Erosion control acceptable at time of inspection. Provide construction entrance prior to construction 7-13-23 PS Erosion control acceptable at time of inspection 7-17-23 PS Erosion control acceptable at time of inspection. Crew has been excavating for the sediment basins on site 7-24-23 PS Erosion control containing silt to site.
Grading/Excavation/Fill Inspection Partial 7/25/2023 7/25/2023 07/25/2023
Misc
Informational
07/21/2023
7-5-23 PS Crews on site have been mowing and pulling trees 7-6-23 PS Crew pulling trees and brush, hauling off site 7-11-23 PS Crew on site grading 7-12-23 PS Crew on site grading 7-13-23 PS Crew on site grading soil 7-14-23 PS Crew grading site and compacting soil, also excavating for sediment basin design 7-17-23 PS Crew grading site and compacting soil 7-20-23 PS Crew grading soil 7-21-23 PS Crew on site performing grading and compaction of soil 7-25-23 PS Crews on site performing grading and compacting of soil
Grading/Excavation/Fill Inspection Partial 7/26/2023 7/26/2023 07/26/2023
Misc
Informational
07/25/2023
7-5-23 PS Crews on site have been mowing and pulling trees 7-6-23 PS Crew pulling trees and brush, hauling off site 7-11-23 PS Crew on site grading 7-12-23 PS Crew on site grading 7-13-23 PS Crew on site grading soil 7-14-23 PS Crew grading site and compacting soil, also excavating for sediment basin design 7-17-23 PS Crew grading site and compacting soil 7-20-23 PS Crew grading soil 7-21-23 PS Crew on site performing grading and compaction of soil 7-25-23 PS Crews on site performing grading and compacting of soil 7-26-23 PS Crew on site performing grading and compacting of soil, Excavating soil where building underground parking garage will go
Grading/Excavation/Fill Inspection Partial 7/27/2023 7/27/2023 07/27/2023
Misc
Informational
07/26/2023
7-5-23 PS Crews on site have been mowing and pulling trees 7-6-23 PS Crew pulling trees and brush, hauling off site 7-11-23 PS Crew on site grading 7-12-23 PS Crew on site grading 7-13-23 PS Crew on site grading soil 7-14-23 PS Crew grading site and compacting soil, also excavating for sediment basin design 7-17-23 PS Crew grading site and compacting soil 7-20-23 PS Crew grading soil 7-21-23 PS Crew on site performing grading and compaction of soil 7-25-23 PS Crews on site performing grading and compacting of soil 7-26-23 PS Crew on site performing grading and compacting of soil, Excavating soil where building underground parking garage will go 7-27-23 PS Crew on site grading and compacting soils
Grading/Excavation/Fill Inspection Partial 7/28/2023 7/28/2023 07/28/2023
Misc
Informational
07/27/2023
7-5-23 PS Crews on site have been mowing and pulling trees 7-6-23 PS Crew pulling trees and brush, hauling off site 7-11-23 PS Crew on site grading 7-12-23 PS Crew on site grading 7-13-23 PS Crew on site grading soil 7-14-23 PS Crew grading site and compacting soil, also excavating for sediment basin design 7-17-23 PS Crew grading site and compacting soil 7-20-23 PS Crew grading soil 7-21-23 PS Crew on site performing grading and compaction of soil 7-25-23 PS Crews on site performing grading and compacting of soil 7-26-23 PS Crew on site performing grading and compacting of soil, Excavating soil where building underground parking garage will go 7-27-23 PS Crew on site grading and compacting soils 7-28-23 PS Crew on site grading and compacting soil
Erosion Control Inspection Partial 7/31/2023 7/31/2023 07/31/2023
Misc
Informational
07/24/2023
6/29/23 PS Erosion control silt fence has been installed at perimeter of project per plans. Equipment is being mobilizied on site 7-5-23 PS Silt fence has been installed at perimeter of project. Erosion control acceptable at time of inspection. Provide construction entrance prior to construction 7-13-23 PS Erosion control acceptable at time of inspection 7-17-23 PS Erosion control acceptable at time of inspection. Crew has been excavating for the sediment basins on site 7-24-23 PS Erosion control containing silt to site. 7-31-23 PS Erosion control acceptable at time of inspection
Grading/Excavation/Fill Inspection Partial 8/1/2023 8/1/2023 08/01/2023
Misc
Informational
07/28/2023
7-5-23 PS Crews on site have been mowing and pulling trees 7-6-23 PS Crew pulling trees and brush, hauling off site 7-11-23 PS Crew on site grading 7-12-23 PS Crew on site grading 7-13-23 PS Crew on site grading soil 7-14-23 PS Crew grading site and compacting soil, also excavating for sediment basin design 7-17-23 PS Crew grading site and compacting soil 7-20-23 PS Crew grading soil 7-21-23 PS Crew on site performing grading and compaction of soil 7-25-23 PS Crews on site performing grading and compacting of soil 7-26-23 PS Crew on site performing grading and compacting of soil, Excavating soil where building underground parking garage will go 7-27-23 PS Crew on site grading and compacting soils 7-28-23 PS Crew on site grading and compacting soil 8-1-23 PS Crew excavating and compacting at underground garage
Grading/Excavation/Fill Inspection Partial 8/2/2023 8/2/2023 08/02/2023
Misc
Informational
08/01/2023
7-5-23 PS Crews on site have been mowing and pulling trees 7-6-23 PS Crew pulling trees and brush, hauling off site 7-11-23 PS Crew on site grading 7-12-23 PS Crew on site grading 7-13-23 PS Crew on site grading soil 7-14-23 PS Crew grading site and compacting soil, also excavating for sediment basin design 7-17-23 PS Crew grading site and compacting soil 7-20-23 PS Crew grading soil 7-21-23 PS Crew on site performing grading and compaction of soil 7-25-23 PS Crews on site performing grading and compacting of soil 7-26-23 PS Crew on site performing grading and compacting of soil, Excavating soil where building underground parking garage will go 7-27-23 PS Crew on site grading and compacting soils 7-28-23 PS Crew on site grading and compacting soil 8-1-23 PS Crew excavating and compacting at underground garage 8-2-23 PS Crew scraping and compacting soils
Erosion Control Inspection Partial 8/2/2023 8/2/2023 08/02/2023
Misc
Informational
07/31/2023
6/29/23 PS Erosion control silt fence has been installed at perimeter of project per plans. Equipment is being mobilizied on site 7-5-23 PS Silt fence has been installed at perimeter of project. Erosion control acceptable at time of inspection. Provide construction entrance prior to construction 7-13-23 PS Erosion control acceptable at time of inspection 7-17-23 PS Erosion control acceptable at time of inspection. Crew has been excavating for the sediment basins on site 7-24-23 PS Erosion control containing silt to site. 7-31-23 PS Erosion control acceptable at time of inspection 8-2-23 PS Erosion control acceptable at time of inspection
Erosion Control Inspection Partial 8/3/2023 8/3/2023 08/03/2023
Misc
Informational
08/02/2023
6/29/23 PS Erosion control silt fence has been installed at perimeter of project per plans. Equipment is being mobilizied on site 7-5-23 PS Silt fence has been installed at perimeter of project. Erosion control acceptable at time of inspection. Provide construction entrance prior to construction 7-13-23 PS Erosion control acceptable at time of inspection 7-17-23 PS Erosion control acceptable at time of inspection. Crew has been excavating for the sediment basins on site 7-24-23 PS Erosion control containing silt to site. 7-31-23 PS Erosion control acceptable at time of inspection 8-2-23 PS Erosion control acceptable at time of inspection 8-3-23 PS Erosion control acceptable at time of inspection
Site Visit Partial 8/4/2023 8/4/2023 08/04/2023
Misc
Informational
07/11/2023
7-5-23 PS Crews on site have been mowing and pulling trees 7-6-23 PS Crew pulling trees and brush, hauling off site 7-11-23 PS Crew on site grading 8-4-23 PS No activity on site
Grading/Excavation/Fill Inspection Partial 8/7/2023 8/7/2023 08/07/2023
Misc
Informational
08/02/2023
7-5-23 PS Crews on site have been mowing and pulling trees 7-6-23 PS Crew pulling trees and brush, hauling off site 7-11-23 PS Crew on site grading 7-12-23 PS Crew on site grading 7-13-23 PS Crew on site grading soil 7-14-23 PS Crew grading site and compacting soil, also excavating for sediment basin design 7-17-23 PS Crew grading site and compacting soil 7-20-23 PS Crew grading soil 7-21-23 PS Crew on site performing grading and compaction of soil 7-25-23 PS Crews on site performing grading and compacting of soil 7-26-23 PS Crew on site performing grading and compacting of soil, Excavating soil where building underground parking garage will go 7-27-23 PS Crew on site grading and compacting soils 7-28-23 PS Crew on site grading and compacting soil 8-1-23 PS Crew excavating and compacting at underground garage 8-2-23 PS Crew scraping and compacting soils 8-7-23 PS Crew spreading and compacting fill dirt being delivered on east side of project.
Erosion Control Inspection Partial 8/9/2023 8/9/2023 08/09/2023
Misc
Informational
08/03/2023
6/29/23 PS Erosion control silt fence has been installed at perimeter of project per plans. Equipment is being mobilizied on site 7-5-23 PS Silt fence has been installed at perimeter of project. Erosion control acceptable at time of inspection. Provide construction entrance prior to construction 7-13-23 PS Erosion control acceptable at time of inspection 7-17-23 PS Erosion control acceptable at time of inspection. Crew has been excavating for the sediment basins on site 7-24-23 PS Erosion control containing silt to site. 7-31-23 PS Erosion control acceptable at time of inspection 8-2-23 PS Erosion control acceptable at time of inspection 8-3-23 PS Erosion control acceptable at time of inspection 8-9-23 PS Erosion control acceptable at time of inspection
Erosion Control Inspection Partial 8/11/2023 8/11/2023 08/11/2023
Misc
Informational
08/09/2023
6/29/23 PS Erosion control silt fence has been installed at perimeter of project per plans. Equipment is being mobilizied on site 7-5-23 PS Silt fence has been installed at perimeter of project. Erosion control acceptable at time of inspection. Provide construction entrance prior to construction 7-13-23 PS Erosion control acceptable at time of inspection 7-17-23 PS Erosion control acceptable at time of inspection. Crew has been excavating for the sediment basins on site 7-24-23 PS Erosion control containing silt to site. 7-31-23 PS Erosion control acceptable at time of inspection 8-2-23 PS Erosion control acceptable at time of inspection 8-3-23 PS Erosion control acceptable at time of inspection 8-9-23 PS Erosion control acceptable at time of inspection 8-11-23 PS Erosion control acceptable at time of inspection
Erosion Control Inspection Partial 8/14/2023 8/14/2023 08/14/2023
Misc
Informational
08/11/2023
6/29/23 PS Erosion control silt fence has been installed at perimeter of project per plans. Equipment is being mobilizied on site 7-5-23 PS Silt fence has been installed at perimeter of project. Erosion control acceptable at time of inspection. Provide construction entrance prior to construction 7-13-23 PS Erosion control acceptable at time of inspection 7-17-23 PS Erosion control acceptable at time of inspection. Crew has been excavating for the sediment basins on site 7-24-23 PS Erosion control containing silt to site. 7-31-23 PS Erosion control acceptable at time of inspection 8-2-23 PS Erosion control acceptable at time of inspection 8-3-23 PS Erosion control acceptable at time of inspection 8-9-23 PS Erosion control acceptable at time of inspection 8-11-23 PS Erosion control acceptable at time of inspection 8-14-23 PS Erosion control at lot perimeter acceptable. Clean any mud built up at gutter buddies in front of storm inlets and any mud gathered along curbs
Documents & Images
Date Uploaded File Type Document Name
03/14/2023 Approved Plans Raintree Village Site Disturbance Approved 03 14 23
11/02/2022 Activity Document Fees PL2022291 Raintree Village Senior Living Phase 1 Site Disturbance
10/11/2022 Engineer Report/Study 2022-10_10_RAINTREE VILLAGE_SWPPP
10/11/2022 Engineers Estimate 2022_10_10_RAINTREE VILLAGE_SDP_COST_ESTIMATE
03/21/2023 Receipt Receipt for transaction:2023-001575
03/28/2023 Letter DE-Permit
06/29/2023 Letter INSPECTION SUMMARY
07/05/2023 Letter INSPECTION SUMMARY
07/05/2023 Letter INSPECTION SUMMARY
07/06/2023 Letter INSPECTION SUMMARY
07/11/2023 Letter INSPECTION SUMMARY
07/12/2023 Letter INSPECTION SUMMARY
07/13/2023 Letter INSPECTION SUMMARY
07/13/2023 Letter INSPECTION SUMMARY
07/14/2023 Letter INSPECTION SUMMARY
07/17/2023 Letter INSPECTION SUMMARY
07/17/2023 Letter INSPECTION SUMMARY
07/18/2023 Letter INSPECTION SUMMARY
07/19/2023 Letter INSPECTION SUMMARY
07/20/2023 Letter INSPECTION SUMMARY
07/21/2023 Letter INSPECTION SUMMARY
07/24/2023 Letter INSPECTION SUMMARY
07/25/2023 Letter INSPECTION SUMMARY
07/26/2023 Letter INSPECTION SUMMARY
07/27/2023 Letter INSPECTION SUMMARY
07/28/2023 Letter INSPECTION SUMMARY
07/31/2023 Letter INSPECTION SUMMARY
08/01/2023 Letter INSPECTION SUMMARY
08/02/2023 Letter INSPECTION SUMMARY
08/02/2023 Letter INSPECTION SUMMARY
08/03/2023 Letter INSPECTION SUMMARY
08/04/2023 Letter INSPECTION SUMMARY
08/07/2023 Letter INSPECTION SUMMARY
08/09/2023 Letter INSPECTION SUMMARY
08/11/2023 Letter INSPECTION SUMMARY
08/14/2023 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home