Summary


PRSITE20200789
Development - Site
Final Acceptance
THE UNITED METHODIST CHURCH OF LEES SUMM
DEVELOPMENT COMPLETE
The Summit Church classroom addition site development
03/26/2020
03/30/2020
11/17/2020
Locations
Contacts
THE UNITED METHODIST CHURCH OF LEES SUMM, Address:3381 NW CHIPMAN RD  
AL HUBER, Address:10770 EL MONTE, Phone:(913) 341-4880  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 03/26/2020 03/26/2020
Dawn Bell
Fees
Paid Fees Amount Paid Owing Date Paid
91100C8-Sanitary Sewer Insp Fees $285.88 $285.88 Paid 03/27/2020
9110068-Storm Fee $563.49 $563.49 Paid 03/27/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Storm - Pipe Partial 5/13/2020 05/13/2020
Misc
Informational
05/13/2020
Marty with Rainbow Construction started working on roof drain #2 today. RP 5-13-20
Storm - Material Verification Passed 5/13/2020 05/13/2020
Misc
Informational
05/13/2020
They are using 12” Nyloplast Inlets with 8” HDPE storm pipe. They will also be using 10” and 12” HDPE pipe. RP 5-13-20
Storm - Pipe Partial 5/14/2020 05/14/2020
Misc
Informational
05/13/2020
Marty with Rainbow Construction started working on roof drain #2 today. RP 5-13-20
Misc
Informational
05/14/2020
Marty’s crew has continued working on drain line #2. Made some field changes to 45’s instead of 90’s where it wraps around the building. Also talked with Mark Goracke from A.L. Huber concerning the severe slope to the inlets. He has contacted Designer Matt Schlitt about raising one of them. He believes the other one won’t be that severe. RP 5-14-20
Storm - Pipe Partial 5/18/2020 05/19/2020
Misc
Informational
05/14/2020
Marty with Rainbow Construction started working on roof drain #2 today. RP 5-13-20
Misc
Informational
05/14/2020
Marty’s crew has continued working on drain line #2. Made some field changes to 45’s instead of 90’s where it wraps around the building. Also talked with Mark Goracke from A.L. Huber concerning the severe slope to the inlets. He has contacted Designer Matt Schlitt about raising one of them. He believes the other one won’t be that severe. RP 5-14-20
Misc
Informational
05/19/2020
Marty’s crew laid the storm pipe around thee base of the building and installed another Nyloplast inlet. Inlets still look set to low but are placed according to plans. Developer has decided to raise the beginning inlet 6 inches. Will monitor the other inlets when grading for drainage. RP 5-18-20
Misc
Informational
05/19/2020
Marty’s crew finished drain line 2 and drain line 1 today. Just waiting to see if the developer wants to raise two of the inlets that look to be below grade. RP 5-19-20
Storm - Pipe Passed 5/22/2020 09/15/2020
Misc
Informational
05/19/2020
Marty with Rainbow Construction started working on roof drain #2 today. RP 5-13-20
Misc
Informational
05/19/2020
Marty’s crew has continued working on drain line #2. Made some field changes to 45’s instead of 90’s where it wraps around the building. Also talked with Mark Goracke from A.L. Huber concerning the severe slope to the inlets. He has contacted Designer Matt Schlitt about raising one of them. He believes the other one won’t be that severe. RP 5-14-20
Misc
Informational
05/19/2020
Marty’s crew laid the storm pipe around thee base of the building and installed another Nyloplast inlet. Inlets still look set to low but are placed according to plans. Developer has decided to raise the beginning inlet 6 inches. Will monitor the other inlets when grading for drainage. RP 5-18-20
Misc
Informational
05/19/2020
Marty’s crew finished drain line 2 and drain line 1 today. Just waiting to see if the developer wants to raise two of the inlets that look to be below grade. RP 5-19-20
Misc
Informational
09/15/2020
Contractor is satisfied with the heights of the remaining storm drains compared to final grade. RP 9-15-20
Site Visit Partial 9/25/2020 9/25/2020 09/25/2020
Misc
Informational
09/25/2020
Meet with Mark from AL Huber. Planning on sodding around the church by the end of October. Irrigation crew is running new irrigation lines around the parking lot. Once the are done, they fill finish grading and seeding that area. RP 9-25-20
Erosion Control Inspection Passed 10/19/2020 10/19/2020 10/19/2020
Misc
Informational
10/19/2020
No erosion issues. They have sodded the area surrounding the church addition. RP 10-19-20
Site Visit Complete 10/19/2020 10/19/2020 10/19/2020
Misc
Informational
09/25/2020
Meet with Mark from AL Huber. Planning on sodding around the church by the end of October. Irrigation crew is running new irrigation lines around the parking lot. Once the are done, they fill finish grading and seeding that area. RP 9-25-20
Misc
Informational
10/19/2020
Area around building addition has been sodded. RP 10-19-20
Documents & Images
Date Uploaded File Type Document Name
03/27/2020 Receipt Receipt for transaction:2020-001306
03/30/2020 Approved set FDP- Summit church addition
03/30/2020 Letter DE-Permit
05/13/2020 Letter INSPECTION SUMMARY
05/13/2020 Letter INSPECTION SUMMARY
05/13/2020 Letter INSPECTION SUMMARY
05/14/2020 Letter INSPECTION SUMMARY
05/19/2020 Letter INSPECTION SUMMARY
09/15/2020 Letter INSPECTION SUMMARY
09/25/2020 Letter INSPECTION SUMMARY
10/19/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter DE-Certificate of Final Acceptance (Commercial)
11/10/2020 Summit Church Storm Water Final Acceptance.
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.