Summary


PRSITE20183061
Development - Site
Final Acceptance
MENC LLC
DEVELOPMENT COMPLETE
Summit Eye Center phase I parking expansion
09/12/2018
10/26/2018
10/21/2019
Locations
Contacts
SUMMIT EYE CENTER LLC, Address:1621 NW BLUE PKWY, Phone:(816) 246-2111  
SRKO LLC, Address:24 NW CHIPMAN RD, Phone:(816) 365-0100  
MENC LLC, Address:1741 NE DOUGLAS STE 100  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 09/12/2018 10/26/2018
Steve Robbins
Fees
Paid Fees Amount Paid Owing Date Paid
9110068-Storm Fee $68.25 $68.25 Paid 09/12/2018
9110081-Paved Surface Inspection Fee $1,431.90 $1,431.90 Paid 09/12/2018
9110071-Site Grading Fee $67.54 $67.54 Paid 09/12/2018
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Pavement-Aggregate Base Passed 10/25/2018 at 9:00 AM 10/26/2018
Misc
Informational
10/26/2018
The subgrade for this parking lot is 6" of portland cement and it was tilled in with a tiller and water. CFS was out to do the testing on the parking lot. CFS said they passed the testing and will send me the results.Steve Robbins 10/26/2018 11:34 AM
Pavement-Proof Roll Passed 10/26/2018 at 11:30 AM 10/26/2018
Informational
10/26/2018
We did a proofroll on the subgrade only for the parking lot. The truck had 27 ton on it. The subgrade is very solid. We did the proofroll with the rock truck bringing in the rock.Steve Robbins 10/26/2018 12:33 PM
Curb - Proof Roll Passed 10/26/2018 at 11:45 AM 10/30/2018
Misc
Informational
10/30/2018
Joe Starlin 10/30/2018 7:12 AM The proof roll passed and curb is being poured.
Commercial Curb Inspection Passed 11/01/2018
Misc
Informational
11/01/2018
Inspected curb contractor grouted the back Side of curb with voids of honeycomb.
Proof roll parking lot Passed 11/16/2018 at 10:15 AM 11/16/2018
Misc
Informational
11/16/2018
Joe Starlin 11/16/2018 3:47 PM The grade was proof rolled and was in compliance. Third party inspector was on site and was in agreement with the results.
Pavement-Surface Passed 11/17/2018 at 8:00 AM 11/26/2018
Misc
Informational
11/26/2018
John Jackson was on site to over see the base being installed.
Street - Surface Course Passed 11/17/2018 at 12:00 PM 11/26/2018
Misc
Informational
11/26/2018
John Jackson was on site for the surface install after base was cooled down.
Grading/Excavation/Fill Inspection Passed 11/26/2018
Storm - Material Verification Passed 11/26/2018
Storm - Rip Rap Passed 11/8/2018 11/26/2018
Misc
Informational
11/26/2018
Rip rap was moved forward from the three original spots to new placement.
Pavement-Aggregate Base Passed 10/26/2018 11/26/2018
Documents & Images
Date Uploaded File Type Document Name
09/12/2018 Receipt Receipt for transaction: 2018-006336
10/23/2018 Letter DE-Permit
10/26/2018 Letter DE-Daily Inspection Summary
10/26/2018 Letter DE-Daily Inspection Summary
10/30/2018 Letter DE-Daily Inspection Summary
11/01/2018 B3F95422-9722-41F9-A5B4-5B962F21B178
11/01/2018 Letter Inspection Summary
11/01/2018 Letter Inspection Summary
11/16/2018 Letter DE-Daily Inspection Summary
11/26/2018 Letter DE-Daily Inspection Summary
11/26/2018 Letter DE-Daily Inspection Summary
11/26/2018 Letter DE-Daily Inspection Summary
11/26/2018 Letter DE-Certificate of Substantial Completion Multiple Lot
11/26/2018 Letter DE-Punch List
12/07/2018 summit eye1
12/07/2018 summit Eye2
12/07/2018 summit Eye3
12/07/2018 summit eye care parking lot substantial & punch list.
10/21/2019 Summit Eye Care Center Phase 1 Parking Expansion
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home