Permit Application Status

PRSGN20253845


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRSGN20253845
Sign Permit
Final Completion
PREMIERLIFE REAL ESTATE HOLDING
SIGN
Non-lighted monument sign installed on existing concrete pad
09/09/2025
09/10/2025
03/25/2026
Locations
Contacts
ROYAL SIGNS & GRAPHICS, Address:1921D SW US-40 HWY, Phone:(816) 229-7728  
PREMIERLIFE REAL ESTATE HOLDING, Address:400 NW MURRAY RD  
Mark Jones, Address:1921 SW Hwy 40 Suite D, Phone:(816) 229-7728  
Reviews
Review Type Outcome Est. Completion Date Completed
Sign Permit Review Approved 09/12/2025 09/10/2025
Claire Byers
Sign location as shown approved as part of 2004-235 FDP.
Sign Permit Review Rejected 09/11/2025 09/10/2025
Claire Byers
Please provide a site plan/aerial image of the property with the sign location marked.
Fees
Paid Fees Amount Paid Owing Date Paid
Sign Permit-Permanent Fee $100.00 $100.00 Paid 09/10/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sign Confirmation Inspection Not Ready 10/1/2025 10/01/2025
Sign Confirmation Inspection Not Ready 10/22/2025 10/30/2025
Sign Confirmation Inspection Passed 3/25/2026 03/25/2026
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home

*PLEASE NOTE - You must be logged in with your registered user account to view any documents related to your permit