Permit Application Status

PRSGN20242836


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRSGN20242836
Sign Permit
Final Completion
VAAP CHAPEL RIDGE LLC
SIGN
Yummy's Donuts 2 - Lighted Channel Letters
06/04/2024
06/05/2024
01/13/2025
Locations
Contacts
GATOR GRAPHICS, Address:404 W YOUNG, Phone:(660) 429-7443  
VAAP CHAPEL RIDGE LLC, Address:PO BOX 24193  
Dean Wille, Address:404 W. Young, Phone:(660) 429-7443  
Reviews
Review Type Outcome Est. Completion Date Completed
Sign Permit Review Approved 06/06/2024 06/04/2024
Hector Soto Jr.
Fees
Paid Fees Amount Paid Owing Date Paid
9110062-Sign Permit-Permanent Fee $100.00 $100.00 Paid 06/05/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sign Confirmation Inspection Passed 6/26/2024 06/26/2024
Final Electrical Inspection Passed 01/13/2025
Documents & Images
Date Uploaded File Type Document Name
06/04/2024 Yummy's 2 Sign Permit 6-4-24
06/04/2024 Yummy's 2 Sign Mock Up 6-4-24
06/04/2024 Permit DS P/R Corrections Document
06/05/2024 Permit DS Building Permit
06/05/2024 Receipt Receipt for transaction:2024-004385
01/13/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home