Permit Application Status

PRSGN20231470


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRSGN20231470
Sign Permit
Final Completion
230 MAIN INVESTORS LLC
SIGN
New sign for International Tap House
04/05/2023
04/17/2023
01/25/2024
Locations
Contacts
FOSSIL FORGE DESIGN, Address:317 SE MAIN ST, Unit B, Phone:(816) 785-3280  
230 MAIN INVESTORS LLC, Address:7200 W 132ND ST STE 150  
Dave Eames, Address:317 B SE Main Street, Phone:(816) 785-3280  
Reviews
Review Type Outcome Est. Completion Date Completed
Sign Permit Review Approved 04/07/2023 04/11/2023
Jalen Ford
Fees
Paid Fees Amount Paid Owing Date Paid
9110062-Sign Permit-Permanent Fee $100.00 $100.00 Paid 04/17/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Final Electrical Inspection Not Ready 05/01/2023
Sign Confirmation Inspection Not Ready 5/8/2023 05/08/2023
Sign Confirmation Inspection Not Ready 5/30/2023 05/30/2023
Final Electrical Inspection Not Ready 6/1/2023 6/1/2023 06/01/2023
Sign Confirmation Inspection Not Ready 6/20/2023 06/20/2023
Final Electrical Inspection Not Ready 6/22/2023 6/22/2023 06/22/2023
Sign Confirmation Inspection Not Ready 7/12/2023 07/12/2023
Final Electrical Inspection Not Ready 7/20/2023 7/20/2023 07/20/2023
Sign Confirmation Inspection Not Ready 8/2/2023 08/02/2023
Sign Confirmation Inspection Not Ready 8/23/2023 08/23/2023
Sign Confirmation Inspection Passed 9/14/2023 09/14/2023
Final Electrical Inspection Passed 01/25/2024
Documents & Images
Date Uploaded File Type Document Name
04/05/2023 InternationalTapHouseSignPermit
04/06/2023 Permit DS P/R Corrections Document
04/11/2023 Permit DS P/R Corrections Document
04/17/2023 Permit DS Building Permit
04/17/2023 Receipt Receipt for transaction:2023-002117
05/01/2023 Letter INSPECTION SUMMARY
06/01/2023 Letter INSPECTION SUMMARY
06/01/2023 Letter INSPECTION SUMMARY
06/22/2023 Letter INSPECTION SUMMARY
07/20/2023 Letter INSPECTION SUMMARY
01/25/2024 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home