Permit Application Status

PRRPR20210323


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRPR20210323
Repair, Replace, Upgrade
Closed
SOUTHWESTERN BELL TELEPHONE
REPAIR REPLACE UPGRADE
REPLACE EXISTING CHILLER
01/25/2021
03/18/2021
08/01/2021
11/28/2022
Locations
Contacts
NABHOLZ CONSTRUCTION CORPORATION, Address:PO BOX 2090, Phone:(501) 505-5800  
MMC CONTRACTORS NATIONAL INC, Address:13800 WYANDOTTE, Phone:(816) 941-5300  
MMC CONTRACTORS NATIONAL INC, Address:13800 WYANDOTTE, Phone:(816) 941-5300  
STACO ELECTRIC CONSTRUCTION COMPANY INC, Address:11030 HICKMAN MILLS DR, Phone:(816) 765-7112  
SCHWERDT DESIGN GROUP INC, Address:2231 SW WAHAMAKER RD. , Phone:(785) 273-7540  
SOUTHWESTERN BELL TELEPHONE, Address:1010 PINE ST ROOM 9E-L-01  
bob.ross@nabholz.com, Address:bob.ross@nabholz.com  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved 03/16/2021 03/09/2021
Joe Frogge
IBC 1606.2 Design dead load - structural
Resolved
03/09/2021

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide verification that either the weight of new roof top equipment is less than or equal to original equipment or provide engineer’s report to verify that existing roof structure will support additional load.
IBC 1015.6 Mechanical equipment, systems and devices - hvac within 10 feet of roof edge
Resolved
03/09/2021

2018 IBC 1015.6 Mechanical equipment, systems and devices. Guards shall be provided where various components that require service are located within 10 feet of a roof edge or open side of a walking surface and such edge or open side is located more than 30 inches above the floor, roof or grade below. The guard shall extend not less than 30 inches beyond each end of such components. The guard shall be constructed so as to prevent the passage of a sphere 21 inches in diameter. Action required: Provide fall protection at new roof mounted equipment.
NEC Article 210.63 Heating, air-conditioning and refrigeration outlet
Resolved
03/09/2021

2017 NEC Article 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide convenience receptacle within 25' of new roof mounted hvac equipment or provide verification that there is an existing receptacle.
Licensed Contractors Approved 03/09/2021 03/09/2021
Joe Frogge
Fire Plan Review Approved with Conditions 03/16/2021 03/09/2021
Joe Frogge
Construction documents - Fire protection systems
Corrective Action Required
03/09/2021

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Informational Purposes) Any modifications to the fire sprinkler system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Building Plan Review Rejected 02/04/2021 02/02/2021
Joe Frogge
IBC 1606.2 Design dead load - structural
Corrective Action Required
01/29/2021

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide verification that either the weight of new roof top equipment is less than or equal to original equipment or provide engineer’s report to verify that existing roof structure will support additional load.
IBC 1015.6 Mechanical equipment, systems and devices - hvac within 10 feet of roof edge
Corrective Action Required
01/29/2021

2018 IBC 1015.6 Mechanical equipment, systems and devices. Guards shall be provided where various components that require service are located within 10 feet of a roof edge or open side of a walking surface and such edge or open side is located more than 30 inches above the floor, roof or grade below. The guard shall extend not less than 30 inches beyond each end of such components. The guard shall be constructed so as to prevent the passage of a sphere 21 inches in diameter. Action required: Provide fall protection at new roof mounted equipment.
NEC Article 210.63 Heating, air-conditioning and refrigeration outlet
Corrective Action Required
01/29/2021

2017 NEC Article 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide convenience receptacle within 25' of new roof mounted hvac equipment or provide verification that there is an existing receptacle.
Fire Plan Review Approved with Conditions 01/28/2021
Michael Weissenbach
Construction documents - Fire protection systems
Corrective Action Required
01/28/2021

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Informational Purposes) Any modifications to the fire sprinkler system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Licensed Contractors Approved 01/25/2021 01/25/2021
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Repair/Replace/Upgrade $1,541.30 $1,541.30 Paid 03/18/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections

There are no inspections for this permit application.

Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home