Permit Application Status

PRROOF20251653


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRROOF20251653
Roofing Permit
Issued
GREEN MILL II LLC
RE-ROOF
Remove existing cap metal . Remove existing wall flashing. . Install 1/2" Secure rock cover board over existing modified roof system. . Mechanically fasten cover board per manufacturer specifications for uplift. . Mechanically fasten GAF 60 MIL TPO single ply roof system. . Fully adhere all wall flashings up & over parapets. . Flash all HVAC &other penetrations to manufacturer specifications. . Install (3) new coated scupper. . A 20 yr, Manufacturer warranty will be included in proposal. . Putty and rag front eyebrow & coat with 550 coating.
04/23/2025
04/23/2025
Locations
Contacts
WEATHER TECH RENOVATIONS, Address:3008 SW US 40 HIGHWAY, Phone:(816) 988-8957  
GREEN MILL II LLC, Address:331 NW CAPITAL DR  
Joel Frey, Address:3008 SW US 40 Highway, Phone:(816) 988-8957  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
9110078 Roofing Permit Fee Portal $50.00 $50.00 Paid 04/23/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Roof Pending 5/7/2025
Documents & Images
Date Uploaded File Type Document Name
04/23/2025 Certificate/License DS Building Permit
04/23/2025 Receipt Receipt for transaction:2025-002545
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home