Permit Application Status

PRROOF20180082


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRROOF20180082
Roofing Permit
Final Completion
PINE TREE PLAZA LLC
RE-ROOF
RE ROOF COMMERICAL
01/10/2018
01/10/2018
11/27/2018
Locations
Contacts
PINE TREE PLAZA LLC, Address:601 E SOUTH ST  
MIDWEST COATING INC, Address:3830 NW 16TH ST, Phone:(785) 232-4276  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Roofing Permit Fee $30.00 $30.00 Paid 01/10/2018
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Roof Partial 3/14/2018 at 3:30 PM 03/14/2018
Corrective Action Required
03/14/2018
ABANDONED EQUIPMENT, PIPE, ETC AT 300 A, B, C, D -- TO BE REMOVED?
Corrective Action Required
03/14/2018
RTU SCREENS NOT SECURED TO ROOF STRUCTURE
Corrective Action Required
03/14/2018
FINAL CLEANUP REQUIRED AT COMPLETION
Roof Partial 5/1/2018 at 1:35 PM 05/01/2018
Roof Passed 11/27/2018 at 7:10 AM 11/27/2018
Investigation Inspection Complete 11/27/2018
Documents & Images
Date Uploaded File Type Document Name
01/10/2018 Receipt Receipt for transaction: 2018-000112
01/10/2018 Certificate/License Codes Building Permit
11/27/2018 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home