PRRES20252298
Building Permit - Residential
Issued
CLAYTON PROPERTIES GROUP INC
NEW SINGLE FAMILY
NEW HOUSE - HOUSE TRUSSES - UNFINISHED BASEMENT - UNCOVERED DECK STOP WORK ORDER generated on 06/27/2025 12:00 AM by username 'Shawn Hoffman'. STOP WORK ORDER removed on 07/01/2025 12:00 AM by username 'Shawn Hoffman'. STOP WORK ORDER generated on 08/08/2025 12:00 AM by username 'Jamie Simerly'. STOP WORK ORDER removed on 08/20/2025 12:00 AM by username 'Shawn Hoffman'. STOP WORK ORDER generated on 09/03/2025 12:00 AM by username 'Shawn Hoffman'. STOP WORK ORDER removed on 09/09/2025 12:00 AM by username 'Shawn Hoffman'.
06/03/2025
06/06/2025
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
CLAYTON PROPERTIES GROUP INC, Address:120 SE 30TH ST  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
BRUCER@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 06/06/2025
Right of Way Permit Fee $85.00 $85.00 Paid 06/06/2025
Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 06/06/2025
Water Tap Fee $3,973.00 $3,973.00 Paid 06/06/2025
Water Meter Fee $748.03 $748.03 Paid 06/06/2025
Valuation Fee New Single Family $1,788.64 $1,788.64 Paid 06/06/2025
Outstanding Fees Amount Paid Owing Date Paid
Not Ready Inspection Fee $75.00 $0.00 $75.00 Not Paid


$75.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Driveway Inspection Pending
Plot Plan Inspection Pending
Occupancy Inspection - Codes Residential Pending
Erosion Control Inspection Residential Pending
Miscellaneous Correction
Informational
09/09/2025
EROSION CONROL IN PLACE AT TIME OF INSPECTION.
All Rough Inspection - Residential Pending 9/10/2025 9/10/2025
Misc
Corrective Action Required
09/03/2025
PORTAL FRAME ONLY SHEETING AND OUTSIDE NAILING APPROVED ONLY
Misc
Corrective Action Required
09/03/2025
No underslab plumbing inspection done. Protect spoils pile from leaving lot and entering atom inlet Stop work until resolved - Fire block AC chase at garage at bottom of soffit - Cut joist for plumbing above stove need a to have hangers - Fur out ductwork and fire block in pantry and power room - Fire block floor penetration at owner entry closet - Provide 2 king studs each side of windows under 1 header wider than 8’ in great room Provide - Fire block top of chase South East corner of great room - Missing nails in LIB located in flex room - Missing snow blocking second floor stairs front wall - Fire block HVAC chase in second floor at Smurf tube at top - Nail off studs in primary bedroom North side - Fire block top of double wall between tub and shower second floor - Anchor bolts to be in the middle third of plate in basement - Notched joist above stairs landing in basement ( no bearing) - Wall studs at foundation wall in front at stairs have no bearing -
Water Service Inspection - R Partial 6/27/2025 06/27/2025
Misc
Corrective Action Required
06/27/2025
Partial copper from foundation out 12 Ft.
Sewer Service Inspection - R Passed 6/27/2025 6/27/2025 06/27/2025
Footing Inspection - Residential Failed - Stop Work 6/27/2025 06/27/2025
Miscellaneous Correction
Corrective Action Required
06/27/2025
NO FOOTING INSPECTION ON FILE.
Water Service Inspection - R Passed 7/1/2025 07/01/2025
Misc
Resolved
07/01/2025
Partial copper from foundation out 12 Ft.
Footing Inspection - Residential Partial 7/1/2025 07/01/2025
Miscellaneous Correction
Resolved
07/01/2025
NO FOOTING INSPECTION ON FILE.
Misc
Corrective Action Required
07/01/2025
Third party inspection on file.
Erosion Control Inspection Residential Failed 7/1/2025 07/01/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
07/01/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. - Protrct stock pile - Remove gravel and debris from street and curbing
Water Service Inspection - R Passed 7/7/2025 7/7/2025 07/07/2025
Misc
Informational
07/07/2025
this has already been approved.
All Rough Inspection - Residential Failed 8/5/2025 8/5/2025 08/05/2025
Misc
Corrective Action Required
08/05/2025
PORTAL FRAME ONLY SHEETING AND OUTSIDE NAILING APPROVED ONLY
Erosion Control Inspection Residential Failed 8/5/2025 08/05/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
08/05/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. - Protrct stock pile - Remove gravel and debris from street and curbing
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
08/05/2025
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED. - More gravel needed on construction entrance
Erosion Control Inspection Residential Failed 8/5/2025 8/5/2025 08/05/2025
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
08/05/2025
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED. - More gravel needed on construction entrance
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/05/2025
08/05/25 Jamie S, Erosion control on the back of the lot needs to be addressed around the storm drain east of the property. Strom drain must be cleaned out and silt fence reestablished. Spoils and construction debris on the back of the lot need to be contained as well. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Failed - Stop Work 8/8/2025 8/8/2025 08/08/2025
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
08/05/2025
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED. - More gravel needed on construction entrance
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/05/2025
08/05/25 Jamie S, Erosion control on the back of the lot needs to be addressed around the storm drain east of the property. Strom drain must be cleaned out and silt fence reestablished. Spoils and construction debris on the back of the lot need to be contained as well. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 08/08/25 Jamie S, Erosion control has not been addressed for the back ot the lot around storm drain or spoils.
Erosion Control Inspection Residential Failed 08/11/2025
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
08/08/2025
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED. - More gravel needed on construction entrance
DCM3 ESC REQUIRED 2 DAY
Partial Correction
08/11/2025
08/05/25 Jamie S, Erosion control on the back of the lot needs to be addressed around the storm drain east of the property. Strom drain must be cleaned out and silt fence reestablished. Spoils and construction debris on the back of the lot need to be contained as well. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 08/08/25 Jamie S, Erosion control has not been addressed for the back of the lot around storm drain or spoils. 08/11/25 Jamie S, Erosion control around the storm drain has been addressed. Spoils and construction debris on the back of the lot need to be removed or contained with silt fence.
Erosion Control Inspection Residential Failed - Stop Work 8/14/2025 8/14/2025 08/14/2025
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
08/11/2025
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED. - More gravel needed on construction entrance
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/14/2025
08/05/25 Jamie S, Erosion control on the back of the lot needs to be addressed around the storm drain east of the property. Strom drain must be cleaned out and silt fence reestablished. Spoils and construction debris on the back of the lot need to be contained as well. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 08/08/25 Jamie S, Erosion control has not been addressed for the back of the lot around storm drain or spoils. 08/11/25 Jamie S, Erosion control around the storm drain has been addressed. Spoils and construction debris on the back of the lot need to be removed or contained with silt fence. 08/14/25 Jamie S, Spoils and construction debris on the back of the lot need to be removed or contained with silt fence.
Erosion Control Inspection Residential Failed - Stop Work 8/15/2025 8/15/2025 08/15/2025
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
08/14/2025
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED. - More gravel needed on construction entrance
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/14/2025
08/05/25 Jamie S, Erosion control on the back of the lot needs to be addressed around the storm drain east of the property. Strom drain must be cleaned out and silt fence reestablished. Spoils and construction debris on the back of the lot need to be contained as well. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 08/08/25 Jamie S, Erosion control has not been addressed for the back of the lot around storm drain or spoils. 08/11/25 Jamie S, Erosion control around the storm drain has been addressed. Spoils and construction debris on the back of the lot need to be removed or contained with silt fence. 08/14/25 Jamie S, Spoils and construction debris on the back of the lot need to be removed or contained with silt fence. 08/15/25 Jamie S, Spoils and construction debris on the back of the lot need to be removed or contained with silt fence. Stop work order has been posted at the front of the property and working contractors have been asked to leave.
Erosion Control Inspection Residential Partial 8/20/2025 8/20/2025 08/20/2025
DCM6 ESC INSP DENIED STREET CLEAN UP
Resolved
08/20/2025
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED. - More gravel needed on construction entrance
DCM3 ESC REQUIRED 2 DAY
Resolved
08/20/2025
08/05/25 Jamie S, Erosion control on the back of the lot needs to be addressed around the storm drain east of the property. Strom drain must be cleaned out and silt fence reestablished. Spoils and construction debris on the back of the lot need to be contained as well. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 08/08/25 Jamie S, Erosion control has not been addressed for the back of the lot around storm drain or spoils. 08/11/25 Jamie S, Erosion control around the storm drain has been addressed. Spoils and construction debris on the back of the lot need to be removed or contained with silt fence. 08/14/25 Jamie S, Spoils and construction debris on the back of the lot need to be removed or contained with silt fence. 08/15/25 Jamie S, Spoils and construction debris on the back of the lot need to be removed or contained with silt fence. Stop work order has been posted at the front of the property and working contractors have been asked to leave.
Erosion Control Inspection Residential Partial 9/2/2025 09/02/2025
Misc
Corrective Action Required
09/02/2025
- Erosion control in place at time of inspection.
All Rough Inspection - Residential Not Ready 9/2/2025 9/2/2025 09/02/2025
Misc
Corrective Action Required
08/05/2025
PORTAL FRAME ONLY SHEETING AND OUTSIDE NAILING APPROVED ONLY
Misc
Corrective Action Required
09/02/2025
Inspection Denide No plans or truss package on sight. Not ready
Underslab Plumbing Inspection - Residential Failed 9/3/2025 09/03/2025
Misc
Corrective Action Required
09/03/2025
No inspecion done STOP WORK
Erosion Control Inspection Residential Failed 9/3/2025 09/03/2025
Misc
Resolved
09/03/2025
- Erosion control in place at time of inspection.
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
09/03/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - PROTECTION REQUIRED FOR SPOILS PILE
Footing Inspection - Residential Passed 9/3/2025 09/03/2025
Misc
Informational
09/03/2025
Third party inspection on file.
Electrical Service Inspection Passed 9/3/2025 9/3/2025 09/03/2025
Gas Service Inspection - Residential Passed 9/3/2025 9/3/2025 09/03/2025
All Rough Inspection - Residential Failed 9/3/2025 9/3/2025 09/03/2025
Misc
Corrective Action Required
09/02/2025
PORTAL FRAME ONLY SHEETING AND OUTSIDE NAILING APPROVED ONLY
Misc
Resolved
09/03/2025
Inspection Denide No plans or truss package on sight. Not ready
Misc
Corrective Action Required
09/03/2025
No underslab plumbing inspection done. Protect spoils pile from leaving lot and entering atom inlet Stop work until resolved - Fire block AC chase at garage at bottom of soffit - Cut joist for plumbing above stove need a to have hangers - Fur out ductwork and fire block in pantry and power room - Fire block floor penetration at owner entry closet - Provide 2 king studs each side of windows under 1 header wider than 8’ in great room Provide - Fire block top of chase South East corner of great room - Missing nails in LIB located in flex room - Missing snow blocking second floor stairs front wall - Fire block HVAC chase in second floor at Smurf tube at top - Nail off studs in primary bedroom North side - Fire block top of double wall between tub and shower second floor - Anchor bolts to be in the middle third of plate in basement - Notched joist above stairs landing in basement ( no bearing) - Wall studs at foundation wall in front at stairs have no bearing -
Underslab Plumbing Inspection - Residential Failed - Stop Work 9/3/2025 09/03/2025
Misc
Corrective Action Required
09/03/2025
No inspecion done STOP WORK
Underslab Plumbing Inspection - Residential Passed 9/9/2025 9/9/2025 09/09/2025
Misc
Resolved
09/09/2025
Erosion Control Inspection Residential Partial 9/9/2025 9/9/2025 09/09/2025
DCM2 ESC DEFICIENT INSTALLATION
Resolved
09/09/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - PROTECTION REQUIRED FOR SPOILS PILE
Miscellaneous Correction
Informational
09/09/2025
EROSION CONROL IN PLACE AT TIME OF INSPECTION.
Documents & Images
Date Uploaded File Type Document Name
06/03/2025 Application Form HM #150 - Permitting Application
06/05/2025 Approved Plans APPROVED PLANS
06/05/2025 Plot Plan APPROVED PLOT PLAN
06/05/2025 Approved Plans APPROVED TRUSS LAYOUT
06/05/2025 Approved Plans APPROVED TRUSS PACKET
06/06/2025 Permit Codes Residential Plan Review
06/06/2025 Permit DS Building Permit
06/06/2025 Receipt Receipt for transaction:2025-004266
06/27/2025 Letter INSPECTION SUMMARY
06/27/2025 Letter INSPECTION SUMMARY
06/27/2025 Letter Stop Work Order
06/30/2025 Application Form THIRD PARTY FOOTING INSPECTION
06/30/2025 Application Form THIRD PARTY FOOTING INSPECTION
07/01/2025 Letter INSPECTION SUMMARY
07/01/2025 Letter INSPECTION SUMMARY
07/01/2025 Letter INSPECTION SUMMARY
07/07/2025 Letter INSPECTION SUMMARY
08/05/2025 Letter INSPECTION SUMMARY
08/05/2025 Letter INSPECTION SUMMARY
08/05/2025 Letter INSPECTION SUMMARY
08/08/2025 Letter Stop Work Order
08/11/2025 Letter INSPECTION SUMMARY
08/14/2025 Letter Stop Work Order
08/15/2025 Letter Stop Work Order
08/20/2025 Letter INSPECTION SUMMARY
09/02/2025 Letter INSPECTION SUMMARY
09/02/2025 Letter INSPECTION SUMMARY
09/03/2025 Letter INSPECTION SUMMARY
09/03/2025 Letter INSPECTION SUMMARY
09/03/2025 Letter INSPECTION SUMMARY
09/03/2025 Letter INSPECTION SUMMARY
09/03/2025 Letter INSPECTION SUMMARY
09/03/2025 Letter INSPECTION SUMMARY
09/03/2025 Letter Stop Work Order
09/09/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home