Permit Application Status

PRRES20251888


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20251888
Building Permit - Residential
Certificate of Occupancy
CLAYTON PROPERTIES GROUP INC
NEW SINGLE FAMILY
NEW HOUSE. UNFINISHED AND FINISHED BASEMENT. ROOF TRUSSES. BILL'S PLUMBING PERFORMED THE PLUMBING WORK ON THIS HOUSE Brandon Kalwei 12/18/2025 3:20 PM
05/08/2025
05/12/2025
11/08/2025
12/03/2025
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:10450 Holmes Rd Suite 100, Phone:(816) 246-6700  
CLAYTON PROPERTIES GROUP INC, Address:120 SE 30TH ST  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
BILL'S PLUMBING SERVICE LLC, Address:308 E PARK STREET, Phone:(913) 829-8213  
COULTER@SUMMITHOMESKC.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Water Tap Fee $3,973.00 $3,973.00 Paid 05/12/2025
Water Meter Fee $748.03 $748.03 Paid 05/12/2025
Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 05/12/2025
Right of Way Permit Fee $85.00 $85.00 Paid 05/12/2025
Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 05/12/2025
Valuation Fee New Single Family $1,436.21 $1,436.21 Paid 05/12/2025
Not Ready Inspection Fee $75.00 $75.00 Paid 10/21/2025
Not Ready Inspection Fee $75.00 $75.00 Paid 10/21/2025
Not Ready Inspection Fee $75.00 $75.00 Paid 10/21/2025
Not Ready Inspection Fee $75.00 $75.00 Paid 10/21/2025
Not Ready Inspection Fee $75.00 $75.00 Paid 10/21/2025
Temporary Occupancy Fee $50.00 $50.00 Paid 10/21/2025
Temporary Occupancy Fee $50.00 $50.00 Paid 12/03/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Residential Failed 6/2/2025 06/02/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
06/02/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. - Remove gravel from street - Protect stock pile - Protect front of lot, and complete gravel filter.
Underslab Plumbing Inspection - Residential Not Ready 6/2/2025 6/2/2025 06/02/2025
Miscellaneous Correction
Corrective Action Required
06/02/2025
INSPECTION DENIDE NO FOOTING INSPECTION ON FILE
Footing Inspection - Residential Failed - Stop Work 6/2/2025 6/2/2025 06/02/2025
Miscellaneous Correction
Corrective Action Required
06/02/2025
No inspection on file for this lot.
Footing Inspection - Residential Passed 6/2/2025 06/02/2025
Miscellaneous Correction
Informational
06/02/2025
Third party inspection on file.
Underslab Plumbing Inspection - Residential Not Ready 6/3/2025 6/3/2025 06/03/2025
Miscellaneous Correction
Resolved
06/03/2025
INSPECTION DENIDE NO FOOTING INSPECTION ON FILE
P2601 GENERAL PLUMBING
Corrective Action Required
06/03/2025
- Support piping with gravel not ready
Sewer Service Inspection - R Passed 6/5/2025 6/5/2025 06/05/2025
Water Service Inspection - R Partial 6/5/2025 6/5/2025 06/05/2025
Misc
Corrective Action Required
06/05/2025
PARTIAL - Poly out of foundation 10'
Underslab Plumbing Inspection - Residential Not Ready 6/6/2025 6/6/2025 06/06/2025
P2601 GENERAL PLUMBING
Corrective Action Required
06/03/2025
- Support piping with gravel not ready
Miscellaneous Correction
Corrective Action Required
06/06/2025
Shawn Hoffman 06/06/2025 8:54 AM NO READY NO GRAVEL
Water Service Inspection - R Passed 6/6/2025 6/6/2025 06/06/2025
Misc
Resolved
06/06/2025
PARTIAL - Poly out of foundation 10'
Underslab Plumbing Inspection - Residential Not Ready 6/9/2025 6/9/2025 06/09/2025
P2601 GENERAL PLUMBING
Corrective Action Required
06/06/2025
- Support piping with gravel not ready
Miscellaneous Correction
Corrective Action Required
06/06/2025
Shawn Hoffman 06/06/2025 8:54 AM NO READY NO GRAVEL
Misc
Corrective Action Required
06/09/2025
NO READY NO GRAVEL Shawn Hoffman 06/09/2025 9:01 AM
Erosion Control Inspection Residential Failed 6/9/2025 06/09/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
06/02/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. - Protect front of lot, and complete gravel filter.
Underslab Plumbing Inspection - Residential Passed 6/10/2025 6/10/2025 06/10/2025
P2601 GENERAL PLUMBING
Resolved
06/10/2025
- Support piping with gravel not ready
Miscellaneous Correction
Resolved
06/10/2025
Shawn Hoffman 06/06/2025 8:54 AM NO READY NO GRAVEL
Misc
Resolved
06/10/2025
NO READY NO GRAVEL Shawn Hoffman 06/09/2025 9:01 AM
All Rough Inspection - Residential Failed 6/26/2025 6/26/2025 06/26/2025
Misc
Corrective Action Required
06/26/2025
PORTAL FRAME SHEETING NAILING APPROVED ONLY. OK TO COVER
Erosion Control Inspection Residential Failed 6/26/2025 06/26/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
06/26/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. - Protect front of lot, and complete gravel filter.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
06/26/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. - REMOVE TRASH AND DEBRIS FROM LOT - REMOVE GRAVEL FROM STREET AND CURB - CLEAN OUT TRASH AND DEBRIS FROM STORM INLET. - PROTECT FRONT OF LOT.
Erosion Control Inspection Residential Failed 6/30/2025 06/30/2025
DCM3 ESC REQUIRED 2 DAY
Resolved
06/30/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. - REMOVE TRASH AND DEBRIS FROM LOT - REMOVE GRAVEL FROM STREET AND CURB - CLEAN OUT TRASH AND DEBRIS FROM STORM INLET. - PROTECT FRONT OF LOT.
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
06/30/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Gas Service Inspection - Residential Passed 7/29/2025 7/29/2025 07/29/2025
Electrical Service Inspection Passed 7/29/2025 7/29/2025 07/29/2025
Erosion Control Inspection Residential Failed 7/29/2025 07/29/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
07/29/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
07/29/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. - PROTECT FIELD INLET - REMOVE GRAVEL FROM STREET - PROTECT FRONT OF LOT
All Rough Inspection - Residential Failed 7/29/2025 7/29/2025 07/29/2025
Misc
Resolved
07/29/2025
PORTAL FRAME SHEETING NAILING APPROVED ONLY. OK TO COVER
Misc
Resolved
07/29/2025
TRUSS REPAIR FOR A3 TRUSS ON FILE.
Misc
Corrective Action Required
07/29/2025
- missing anchor bolts single bay garage at plate breaks - Missing hold downs at double girders garage single bay - Strap top plate in bedroom 2 at entry wall no minimum 24” overlap - Missing anchor bolts at sill plate breaks with in 12” basement sump room near I-beam - Anchor all steel columns in basement - Fire block top plate above egress window back side - Fire block top of fur-out wall electrical panel side - Over notched stud same wall - Anchor bolts missing same wall - Fire block end of soffit same wall - Nail off siding at sill plate
Erosion Control Inspection Residential Failed 7/30/2025 7/30/2025 07/30/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
07/29/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. - PROTECT FIELD INLET - REMOVE GRAVEL FROM STREET - PROTECT FRONT OF LOT
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/30/2025
07/30/25 Jamie S, Erosion control needs to be reestablished. Street and downstream storm drain need to be cleaned. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
All Rough Inspection - Residential Not Ready 7/31/2025 7/31/2025 07/31/2025
Misc
Corrective Action Required
07/29/2025
- missing anchor bolts single bay garage at plate breaks - Missing hold downs at double girders garage single bay - Strap top plate in bedroom 2 at entry wall no minimum 24” overlap - Missing anchor bolts at sill plate breaks with in 12” basement sump room near I-beam - Anchor all steel columns in basement - Fire block top plate above egress window back side - Fire block top of fur-out wall electrical panel side - Over notched stud same wall - Anchor bolts missing same wall - Fire block end of soffit same wall - Nail off siding at sill plate
Misc
Corrective Action Required
07/31/2025
INSPECTION DENIDE FOR EROSION CONTROL
All Rough Inspection - Residential Failed 8/1/2025 8/1/2025 08/01/2025
Misc
Corrective Action Required
07/31/2025
- missing anchor bolts single bay garage at plate breaks - Missing hold downs at double girders garage single bay - Strap top plate in bedroom 2 at entry wall no minimum 24” overlap - Missing anchor bolts at sill plate breaks with in 12” basement sump room near I-beam - Anchor all steel columns in basement - Fire block top plate above egress window back side - Fire block top of fur-out wall electrical panel side - Over notched stud same wall - Anchor bolts missing same wall - Fire block end of soffit same wall - Nail off siding at sill plate
Misc
Corrective Action Required
07/31/2025
INSPECTION DENIDE FOR EROSION CONTROL Clean out the mouth of the Storm inlet on the side property line, and install silt fence properly
Erosion Control Inspection Residential Partial 8/4/2025 8/4/2025 08/04/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
07/30/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. - PROTECT FIELD INLET - REMOVE GRAVEL FROM STREET - PROTECT FRONT OF LOT
DCM3 ESC REQUIRED 2 DAY
Resolved
08/04/2025
07/30/25 Jamie S, Erosion control needs to be reestablished. Street and downstream storm drain need to be cleaned. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 08/04/25 Jamie S, Erosion Control has been reestablished.
All Rough Inspection - Residential Failed 8/5/2025 8/5/2025 08/05/2025
Misc
Corrective Action Required
08/01/2025
- Fire block top plate above egress window back side - Fire block top of fur-out wall electrical panel side ( now needs gaps foamed) - Anchor bolts missing same wall - Fire block end of soffit same wall at I- beam
Misc
Resolved
08/05/2025
INSPECTION DENIDE FOR EROSION CONTROL Clean out the mouth of the Storm inlet on the side property line, and install silt fence properly
Erosion Control Inspection Residential Partial 8/5/2025 08/05/2025
Misc
Corrective Action Required
08/04/2025
- Erosion conrol in place at time of inspection
All Rough Inspection - Residential Passed 8/7/2025 8/7/2025 08/07/2025
Misc
Resolved
08/07/2025
- Fire block top plate above egress window back side - Fire block top of fur-out wall electrical panel side ( now needs gaps foamed) - Anchor bolts missing same wall - Fire block end of soffit same wall at I- beam
Erosion Control Inspection Residential Failed 8/7/2025 08/07/2025
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
08/05/2025
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED.
Driveway Inspection Partial 9/11/2025 9/11/2025 09/11/2025
Misc
Corrective Action Required
09/11/2025
9/11/25 Tyler S. DW is formed and compacted. Approved to pour.
Occupancy Inspection - Codes Residential Failed 10/15/2025 10/15/2025 10/15/2025
Misc
Corrective Action Required
10/15/2025
1106 SW Fiord Dr - Washer outlet is not gfci protected - Outlet at toilet in master is not gfci protected - Sump outlet not labeled as non gfci - Gfci on front wall of garage will not reset - Front porch approach, Transition from driveway to landing at main egress is not allowed to be more than 2 percent grade.
Erosion Control Inspection Residential Failed 10/16/2025 10/16/2025
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
08/07/2025
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED.
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
10/16/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
Driveway Inspection Failed 10/17/2025 10/17/2025 10/17/2025
Misc
Resolved
10/17/2025
9/11/25 Tyler S. DW is formed and compacted. Approved to pour.
Misc
Corrective Action Required
10/17/2025
10-17-25 REQUESTED INSPECTION DENIED DUE TO DEFICIENT EROSION CONTROL PROVIDED ON LOT PROVIDE ADEQUATE EROSION CONTROL AND CLEAN ALL MUD AND SILT FROM STREET WITHIN 2 BUSINESS DAYS
Occupancy Inspection - Codes Residential Ready for Temp CO 10/20/2025 10/20/2025 10/20/2025
Misc
Resolved
10/20/2025
Misc
Corrective Action Required
10/20/2025
- uncover water meter pit - provide splash pads at down spouts - land sewer trace wire at grade - final grading and sod - sump discharge to be 36” away from foundation - pending driveway inspection - will check water meter at time of Occupancy - pay outstanding fees
Erosion Control Inspection Residential Failed 10/20/2025 10/20/2025
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
10/16/2025
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED.
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
10/16/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
Erosion Control Inspection Residential Passed 11/14/2025 11/14/2025
DCM6 ESC INSP DENIED STREET CLEAN UP
Resolved
11/14/2025
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED.
DCM2 ESC DEFICIENT INSTALLATION
Resolved
11/14/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
Plot Plan Inspection Passed 11/24/2025 11/24/2025
Occupancy Inspection - Codes Residential Ready for Temp CO 11/24/2025 11/24/2025
Misc
Corrective Action Required
10/20/2025
- pending driveway inspection
Driveway Inspection Passed 12/3/2025 12/03/2025
Misc
Informational
12/03/2025
12-3-25 PS Driveway approach meets LS specs
Occupancy Inspection - Codes Residential Full C of O 12/3/2025 12/03/2025
Misc
Resolved
12/03/2025
- pending driveway inspection
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home

*PLEASE NOTE - You must be logged in with your registered user account to view any documents related to your permit