Permit Application Status

PRRES20251620


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20251620
Building Permit - Residential
Issued
TRUMARK CUSTOM HOMES LLC
NEW SINGLE FAMILY
NEW HOUSE - FINISHED AND UNFINSHED BASEMENT - COVERED AND UNCOVERED DECK STOP WORK ORDER generated on 08/04/2025 12:00 AM by username 'Jamie Simerly'. STOP WORK ORDER removed on 08/08/2025 12:00 AM by username 'Jamie Simerly'.
04/22/2025
05/05/2025
10/22/2025
Locations
Contacts
TRUMARK HOMES, LLC, Address:424 SE MAXWELL DR, Phone:(816) 564-5613  
TRUMARK CUSTOM HOMES LLC, Address:2924 NW THOREAU DR  
MARK A YANCIK, Address:508 nw manor dr  
TRUMARKHOMES.MARK@GMAIL.COM  
APEX HEATING & AIR CONDITIONING INC, Address:1202 NW EAGLE RIDGE BLVD, Phone:(816) 228-2739  
IMPACT ELECTRICAL SOLUTIONS LLC, Address:14 ANCHOR DRIVE, Phone:(816) 674-9345  
A BRIGHT PLUMBING LLC, Address:201 NE WOODBURY DR, Phone:(816) 867-4540  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 05/05/2025
Right of Way Permit Fee $85.00 $85.00 Paid 05/05/2025
Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 05/05/2025
Water Tap Fee $3,973.00 $3,973.00 Paid 05/05/2025
Water Meter Fee $748.03 $748.03 Paid 05/05/2025
Valuation Fee New Single Family $1,591.34 $1,591.34 Paid 05/05/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Driveway Inspection Pending
Plot Plan Inspection Pending
Occupancy Inspection - Codes Residential Pending
Erosion Control Inspection Residential Pending
Miscellaneous Correction
Corrective Action Required
08/28/2025
Erosion control in place at time of inspection.
Footing Inspection - Residential Passed 5/8/2025 05/08/2025
Misc
Informational
05/08/2025
Third party footing inspection on file.
Erosion Control Inspection Residential Partial 5/8/2025 05/08/2025
Misc
Corrective Action Required
05/08/2025
Erosion control in place
Underslab Plumbing Inspection - Residential Passed 5/21/2025 05/21/2025
Erosion Control Inspection Residential Partial 5/21/2025 05/21/2025
Misc
Corrective Action Required
05/08/2025
Erosion control in place
Water Service Inspection - R Partial 6/18/2025 06/18/2025
Misc
Corrective Action Required
06/18/2025
PARTIAL Poly out of foundation 15 ft.
Sewer Service Inspection - R Passed 6/18/2025 6/18/2025 06/18/2025
Erosion Control Inspection Residential Failed 6/18/2025 06/18/2025
Misc
Resolved
06/18/2025
Erosion control in place
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
06/18/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - Remove gravel from curb and street - Protect front of lot.
Water Service Inspection - R Passed 6/20/2025 6/20/2025 06/20/2025
Misc
Resolved
06/20/2025
PARTIAL Poly out of foundation 15 ft.
Erosion Control Inspection Residential Failed 6/20/2025 06/20/2025
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
06/18/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - Remove gravel from curb and street - Protect front of lot.
Erosion Control Inspection Residential Failed 7/8/2025 07/08/2025
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
06/20/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - Remove gravel from curb and street - Protect front of lot.
All Rough Inspection - Residential Failed 7/8/2025 7/8/2025 07/08/2025
Misc
Corrective Action Required
07/08/2025
PORTAL FRAME ONLY - portal frame sheeting nail pattern ok - back patio door CSPF, sheeting break to be in middle 1/3 of leg. make lower portion at least 4 foot for a 12 foot hieght header. block and nail off. (I will check at All rough) - back deck ceiling, ok - front porch ceiling, ok
Erosion Control Inspection Residential Failed 7/30/2025 7/30/2025 07/30/2025
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
07/08/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - Remove gravel from curb and street - Protect front of lot.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/30/2025
07/30/25 Jamie S, Erosion control needs to be reestablished. Street and downstream storm drain need to be cleaned. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Failed - Stop Work 8/4/2025 8/4/2025 08/04/2025
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
07/30/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - Remove gravel from curb and street - Protect front of lot.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/30/2025
07/30/25 Jamie S, Erosion control needs to be reestablished. Street and downstream storm drain need to be cleaned. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 08/04/25 Jamie S, Erosion control needs to be reestablished. Street and downstream storm drain need to be cleaned.
Erosion Control Inspection Residential Failed 8/5/2025 8/5/2025 08/05/2025
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
08/04/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - Remove gravel from curb and street - Protect front of lot.
DCM3 ESC REQUIRED 2 DAY
Partial Correction
08/05/2025
07/30/25 Jamie S, Erosion control needs to be reestablished. Street and downstream storm drain need to be cleaned. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 08/04/25 Jamie S, Erosion control needs to be reestablished. Street and downstream storm drain need to be cleaned. 08/05/25 Jamie S, Erosion control has been reestablished. Straw waddles placed at storm drains on both sides need to be replaced with Silt socks.
Erosion Control Inspection Residential Partial 8/8/2025 8/8/2025 08/08/2025
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
08/05/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - Remove gravel from curb and street - Protect front of lot.
DCM3 ESC REQUIRED 2 DAY
Resolved
08/08/2025
07/30/25 Jamie S, Erosion control needs to be reestablished. Street and downstream storm drain need to be cleaned. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 08/04/25 Jamie S, Erosion control needs to be reestablished. Street and downstream storm drain need to be cleaned. 08/05/25 Jamie S, Erosion control has been reestablished. Straw waddles placed at storm drains on both sides need to be replaced with Silt socks. 08/08/25 Jamie S, Straw waddle on property side has been replaced with a silt sock.
Gas Service Inspection - Residential Failed 8/19/2025 8/19/2025 08/19/2025
Miscellaneous Correction
Corrective Action Required
08/19/2025
- Pressure test failed. no pressure on gauge
Erosion Control Inspection Residential Partial 8/19/2025 08/19/2025
DCM2 ESC DEFICIENT INSTALLATION
Resolved
08/19/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - Remove gravel from curb and street - Protect front of lot.
Miscellaneous Correction
Corrective Action Required
08/19/2025
Erosion control in place at time of inspection.
Electrical Service Inspection Passed 8/19/2025 8/19/2025 08/19/2025
All Rough Inspection - Residential Failed 8/19/2025 8/19/2025 08/19/2025
Misc
Resolved
08/19/2025
PORTAL FRAME ONLY - portal frame sheeting nail pattern ok - back patio door CSPF, sheeting break to be in middle 1/3 of leg. make lower portion at least 4 foot for a 12 foot hieght header. block and nail off. (I will check at All rough) - back deck ceiling, ok - front porch ceiling, ok
Misc
Corrective Action Required
08/19/2025
- Windows in dining room wider than 8’ header requires (2) king studs on each end - Protect water lines in master bedroom/ shower with boca plates not strike plate - Strap top plate corner of entry wall to hallway wall ( no top plate tie in) - Fire block end of soffit around I-beam at back exterior wall/closet - Security block exterior door studs basement - Fire block end of soffit and exterior wall at joists space above basement exit door - Nail off floor joists that are cut between basement stairs and garage wall - Fire block penetration at top plate bedroom 4 patio wall
Gas Service Inspection - Residential Passed 8/25/2025 8/25/2025 08/25/2025
Miscellaneous Correction
Resolved
08/25/2025
- Pressure test failed. no pressure on gauge
All Rough Inspection - Residential Failed 8/25/2025 8/25/2025 08/25/2025
Misc
Corrective Action Required
08/19/2025
- Protect water lines in master bedroom/ shower with boca plates not strike plate - Nail off floor joists that are cut between basement stairs and garage wall
Erosion Control Inspection Residential Partial 8/28/2025 08/28/2025
Miscellaneous Correction
Corrective Action Required
08/19/2025
Erosion control in place at time of inspection.
All Rough Inspection - Residential Passed 8/28/2025 8/28/2025 08/28/2025
Misc
Resolved
08/28/2025
- Protect water lines in master bedroom/ shower with boca plates not strike plate - Nail off floor joists that are cut between basement stairs and garage wall
Documents & Images
Date Uploaded File Type Document Name
04/22/2025 highland lot 156 permit application 4-21-25
04/24/2025 Permit Codes Residential Plan Review
04/24/2025 Approved Plans APPROVED PLANS
04/25/2025 Permit Codes Residential Plan Review
04/28/2025 Permit Codes Residential Plan Review
04/28/2025 Plot Plan APPROVED PLOT PLAN
05/05/2025 Permit DS Building Permit
05/05/2025 Receipt Receipt for transaction:2025-002834
05/07/2025 3RD Party Insp Report THIRD PARTY FOOTING INPSECTION
05/08/2025 Letter INSPECTION SUMMARY
05/08/2025 Letter INSPECTION SUMMARY
05/21/2025 Letter INSPECTION SUMMARY
05/21/2025 Letter INSPECTION SUMMARY
06/18/2025 Letter INSPECTION SUMMARY
06/18/2025 Letter INSPECTION SUMMARY
06/18/2025 Letter INSPECTION SUMMARY
06/20/2025 Letter INSPECTION SUMMARY
06/20/2025 Letter INSPECTION SUMMARY
07/08/2025 Letter INSPECTION SUMMARY
07/08/2025 Letter INSPECTION SUMMARY
07/30/2025 Letter INSPECTION SUMMARY
08/04/2025 Letter Stop Work Order
08/05/2025 Letter INSPECTION SUMMARY
08/08/2025 Letter INSPECTION SUMMARY
08/19/2025 Letter INSPECTION SUMMARY
08/19/2025 Letter INSPECTION SUMMARY
08/19/2025 Letter INSPECTION SUMMARY
08/19/2025 Letter INSPECTION SUMMARY
08/25/2025 Letter INSPECTION SUMMARY
08/25/2025 Letter INSPECTION SUMMARY
08/28/2025 Letter INSPECTION SUMMARY
08/28/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home