Permit Application Status

PRRES20251484


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20251484
Building Permit - Residential
Issued
CLAYTON PROPERTIES GROUP INC
NEW SINGLE FAMILY
NEW HOUSE. UNFINISHED BASEMENT. UNCOVERED DECK. ROOF TRUSSES.
04/14/2025
04/18/2025
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
COULTER@SUMMITHOMESKC.COM  
CLAYTON PROPERTIES GROUP INC, Address:120 SE 30TH ST  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331401-Water Tap Fee $3,973.00 $3,973.00 Paid 04/18/2025
8350015-Water Meter Fee $748.03 $748.03 Paid 04/18/2025
8331507-Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 04/18/2025
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 04/18/2025
7232302-Residential License Tax Fee $1,022.72 $1,022.72 Paid 04/18/2025
9110078-Valuation Fee New Single Family $2,139.34 $2,139.34 Paid 04/18/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Driveway Inspection Pending
Plot Plan Inspection Pending
Electrical Service Inspection Pending
Gas Service Inspection - Residential Pending
All Rough Inspection - Residential Pending
Occupancy Inspection - Codes Residential Pending
Erosion Control Inspection Residential Pending
Misc
Corrective Action Required
05/06/2025
- EROSION CONTROL IN PLACE AT TIME OF INSPECTION.
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
05/06/2025
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED.
Footing Inspection - Residential Passed 4/29/2025 04/29/2025
Miscellaneous Correction
Informational
04/29/2025
- THIRD PARTY INSPECTION ON FILE.
Erosion Control Inspection Residential Partial 4/29/2025 04/29/2025
Misc
Corrective Action Required
04/29/2025
- EROSION CONTROL IN PLACE AT TIME OF INSPECTION.
Underslab Plumbing Inspection - Residential Passed 5/5/2025 5/5/2025 05/05/2025
Sewer Service Inspection - R Passed 5/5/2025 5/5/2025 05/05/2025
Erosion Control Inspection Residential Failed 5/6/2025 05/06/2025
Misc
Corrective Action Required
04/29/2025
- EROSION CONTROL IN PLACE AT TIME OF INSPECTION.
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
05/06/2025
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED.
Water Service Inspection - R Passed 5/6/2025 5/6/2025 05/06/2025
Documents & Images
Date Uploaded File Type Document Name
04/14/2025 HM #149 - PERMIT APP
04/17/2025 Approved Plans APPROVED PLANS
04/17/2025 Plot Plan APPROVED PLOT PLAN
04/17/2025 Approved Plans APPROVED TRUSS LAYOUT
04/17/2025 Approved Plans APPROVED TRUSS PACKAGE
04/17/2025 Permit Codes Residential Plan Review
04/18/2025 Permit DS Building Permit
04/18/2025 Receipt Receipt for transaction:2025-002434
04/28/2025 M L Crose 2770 SW 12th St LSMO 3rd Party Footing Inspection Report 4-28-25
04/29/2025 Letter INSPECTION SUMMARY
04/29/2025 Letter INSPECTION SUMMARY
05/05/2025 Letter INSPECTION SUMMARY
05/05/2025 Letter INSPECTION SUMMARY
05/06/2025 Letter INSPECTION SUMMARY
05/06/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home