Summary
PRRES20250347
Building Permit - Residential
Temporary Occupancy
NEW SINGLE FAMILY
NEW HOUSE. FINISHED/UNFINISHED BASEMENT. WALKOUT BASEMENT. UNCOVERED DECK. ROOF TRUSSES.
01/30/2025
02/05/2025
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
COULTER@SUMMITHOMESKC.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Water Tap Fee $3,973.00 $3,973.00 Paid 02/05/2025
Water Meter Fee $748.03 $748.03 Paid 02/05/2025
Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 02/05/2025
Right of Way Permit Fee $85.00 $85.00 Paid 02/05/2025
Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 02/05/2025
Valuation Fee New Single Family $1,343.78 $1,343.78 Paid 02/05/2025
Temporary Occupancy Fee $50.00 $50.00 Paid 07/15/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Driveway Inspection Pending
Misc
Informational
08/20/2025
5-8-25 DP. DW was formed, aggregate compacted, approved to pour. 5-16-25 DW was poured, but can not pass until forms have been removed. 7/16/25 DW can not pass until forms have been removed. Call in for reinspection when forms have been pulled. 8/20/25 Tyler S. Form left in the DW by curb.
Occupancy Inspection - Codes Residential Pending 8/20/2025 8/20/2025
Misc
Corrective Action Required
08/14/2025
No TCO extension letter submitted items below are not corrected. - Driveway and sidewalk inspection pending
Sidewalk Inspection Pending 10/24/2025 10/24/2025
Misc
Informational
10/10/2025
5-8-25 DP. SW was formed, aggregate compacted, cross slopes in compliance. Approved to pour 5-16-25 DP. SW has been poured, but can not pass until curb line is clean and erosion control has been reestablished. 07/16/25 Jamie S, SW needs to be cleaned off for inspection. Call for reinspection once sidewalk is clear. 8/20/25 Tyler S. Crack in the SW, and far left side of the approach, last SW panel is out of compliance. 10-10-25 PS Pre pour for replacement sidewalk panels, forms in place and aggregate compacted, approved to pour
Erosion Control Inspection Residential Failed 3/3/2025 03/03/2025
Misc
Corrective Action Required
03/03/2025
- Erosion control required at perimeter
Footing Inspection - Residential Passed 3/3/2025 03/03/2025
Misc
Informational
03/03/2025
- Footing inspected by third party inspector.
Erosion Control Inspection Residential Failed 3/13/2025 03/13/2025
Misc
Corrective Action Required
03/03/2025
-Provide gravel filter a construction entrance
Underslab Plumbing Inspection - Residential Partial 3/13/2025 3/13/2025 03/13/2025
Misc
Corrective Action Required
03/13/2025
- Plumbing approved -REMOVE WOOD AND DEBIRS BEFORE POURING SLAB DO NOT POUR UNTIL REINSPECTION
Underslab Plumbing Inspection - Residential Passed 3/14/2025 03/14/2025
Misc
Resolved
03/14/2025
- Plumbing approved -REMOVE WOOD AND DEBIRS BEFORE POURING SLAB DO NOT POUR UNTIL REINSPECTION
Sewer Service Inspection - R Passed 3/14/2025 3/14/2025 03/14/2025
Erosion Control Inspection Residential Partial 3/19/2025 03/19/2025
Misc
Resolved
03/19/2025
-Provide gravel filter a construction entrance
Miscellaneous Correction
Corrective Action Required
03/19/2025
_ EROSION CONTROL IN PLACE AT TIME OF INSPECTION.
Water Service Inspection - R Passed 3/19/2025 3/19/2025 03/19/2025
All Rough Inspection - Residential Failed 4/8/2025 4/8/2025 04/08/2025
Misc
Informational
04/08/2025
PORAL FRAME AND FRONT PORCH ONLY BOTH APPROVED
Erosion Control Inspection Residential Failed 4/8/2025 04/08/2025
Miscellaneous Correction
Resolved
04/08/2025
_ EROSION CONTROL IN PLACE AT TIME OF INSPECTION.
Misc
Corrective Action Required
04/08/2025
- Remove loose trash from lot.
All Rough Inspection - Residential Failed 4/21/2025 4/21/2025 04/21/2025
Misc
Informational
04/08/2025
PORAL FRAME AND FRONT PORCH ONLY BOTH APPROVED
Misc
Corrective Action Required
04/21/2025
- Protect wiring within 6’ of attic access - Fire block penetration at top plate bathroom by pantry - Fire block top plate,double wall at primary toilet room - Upload and repair broken trusses to manufacture instructions upload report - Missing nails on truss hanger by main floor slider - Fire block top plate at soffit left of window basement back left side - fire foam gaps at soffit end basement by window across from stairs - Fire block gap from top plate to sheeting basement over and left of man door - Fire block gap at top plate bedroom 2 over window -
Electrical Service Inspection Passed 4/21/2025 4/21/2025 04/21/2025
Gas Service Inspection - Residential Passed 4/21/2025 4/21/2025 04/21/2025
Erosion Control Inspection Residential Partial 4/21/2025 04/21/2025
Misc
Resolved
04/21/2025
- Remove loose trash from lot.
Misc
Corrective Action Required
04/21/2025
Erosion control in place at time of inspection
All Rough Inspection - Residential Passed 4/23/2025 4/23/2025 04/23/2025
Misc
Resolved
04/23/2025
PORAL FRAME AND FRONT PORCH ONLY BOTH APPROVED
Misc
Resolved
04/23/2025
- Protect wiring within 6’ of attic access - Fire block penetration at top plate bathroom by pantry - Fire block top plate,double wall at primary toilet room - Upload and repair broken trusses to manufacture instructions upload report - Missing nails on truss hanger by main floor slider - Fire block top plate at soffit left of window basement back left side - fire foam gaps at soffit end basement by window across from stairs - Fire block gap from top plate to sheeting basement over and left of man door - Fire block gap at top plate bedroom 2 over window -
Driveway Inspection Partial 5/8/2025 5/8/2025 05/08/2025
Misc
Informational
05/08/2025
5-8-25 DP. DW was formed, aggregate compacted, approved to pour.
Sidewalk Inspection Partial 5/8/2025 5/8/2025 05/08/2025
Misc
Informational
05/08/2025
5-8-25 DP. SW was formed, aggregate compacted, cross slopes in compliance. Approved to pour
Driveway Inspection Partial 5/16/2025 5/16/2025 05/16/2025
Misc
Informational
05/08/2025
5-8-25 DP. DW was formed, aggregate compacted, approved to pour. 5-16-25 DW was poured, but can not pass until forms have been removed.
Sidewalk Inspection Partial 5/16/2025 5/16/2025 05/16/2025
Misc
Informational
05/08/2025
5-8-25 DP. SW was formed, aggregate compacted, cross slopes in compliance. Approved to pour 5-16-25 DP. SW has been poured, but can not pass until curb line is clean and erosion control has been reestablished.
Piers/Caissons Inspection - Residential Passed 5/30/2025 5/30/2025 05/30/2025
Plot Plan Inspection Passed 7/10/2025 07/10/2025
Erosion Control Inspection Residential Failed 7/10/2025 07/10/2025
Misc
Resolved
07/10/2025
Erosion control in place at time of inspection
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
07/10/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - TRIM TALL VEGETATION ON LOT - PROTECT FRONT OF LOT
Occupancy Inspection - Codes Residential Failed 7/10/2025 7/10/2025 07/10/2025
Misc
Corrective Action Required
07/10/2025
- Driveway and sidewalk inspection pending - Land sewer trace wire at grade - Sump discharge to be 36” away from foundation Sidewalk - final grading and sod - Seal all exterior penetrations - Provide gutters and downspouts - Provide splash pads at downspouts - Open electrical at deck - Provide deck stairs landing - Receptacle in basement bathroom not working - GFCI protection required for outlets in basement storage area - complete irrigation system Erosion control: Trim tall vegetation on lot
Occupancy Inspection - Codes Residential Ready for Temp CO 7/15/2025 7/15/2025 07/15/2025
Misc
Corrective Action Required
07/10/2025
- Driveway and sidewalk inspection pending - Land sewer trace wire at grade - Sump discharge to be 36” away from foundation Sidewalk - final grading and sod - Seal all exterior penetrations - Provide gutters and downspouts - Provide splash pads at downspouts - complete irrigation system Erosion control: Trim tall vegetation on lot
Erosion Control Inspection Residential Failed 7/15/2025 07/15/2025
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
07/10/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - TRIM TALL VEGETATION ON LOT - PROTECT FRONT OF LOT
Driveway Inspection Partial 7/16/2025 7/16/2025 07/16/2025
Misc
Informational
05/16/2025
5-8-25 DP. DW was formed, aggregate compacted, approved to pour. 5-16-25 DW was poured, but can not pass until forms have been removed. 7/16/25 DW can not pass until forms have been removed. Call in for reinspection when froms have been pulled.
Sidewalk Inspection Partial 7/16/2025 7/16/2025 07/16/2025
Misc
Informational
05/16/2025
5-8-25 DP. SW was formed, aggregate compacted, cross slopes in compliance. Approved to pour 5-16-25 DP. SW has been poured, but can not pass until curb line is clean and erosion control has been reestablished. 07/16/25 Jamie S, SW needs to be cleaned off for inspection. Call for reinspection once sidewalk is clear.
Erosion Control Inspection Residential Failed 7/30/2025 7/30/2025 07/30/2025
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
07/15/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - TRIM TALL VEGETATION ON LOT - PROTECT FRONT OF LOT
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/30/2025
07/30/25 Jamie S, Erosion control needs to be reestablished. Street needs to be cleaned. Construction debris needs to be removed from lot. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Partial 8/4/2025 8/4/2025 08/04/2025
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
07/30/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - TRIM TALL VEGETATION ON LOT - PROTECT FRONT OF LOT
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/30/2025
07/30/25 Jamie S, Erosion control needs to be reestablished. Street needs to be cleaned. Construction debris needs to be removed from lot. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 08/04/25 Jamie S, Erosion Control has been reestablished.
Erosion Control Inspection Residential Failed 8/6/2025 8/6/2025 08/06/2025
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
08/04/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - TRIM TALL VEGETATION ON LOT - PROTECT FRONT OF LOT
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/04/2025
07/30/25 Jamie S, Erosion control needs to be reestablished. Street needs to be cleaned. Construction debris needs to be removed from lot. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 08/04/25 Jamie S, Erosion Control has been reestablished.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/06/2025
8/6/25 Tyler S. SW, curb, and street need debris and dirt cleaned up. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Partial 8/8/2025 8/8/2025 08/08/2025
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
08/06/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - TRIM TALL VEGETATION ON LOT - PROTECT FRONT OF LOT
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/06/2025
07/30/25 Jamie S, Erosion control needs to be reestablished. Street needs to be cleaned. Construction debris needs to be removed from lot. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 08/04/25 Jamie S, Erosion Control has been reestablished.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/06/2025
8/6/25 Tyler S. SW, curb, and street need debris and dirt cleaned up. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS 8-8-25 Dustin A, SW has been cleaned , laying sod today
Occupancy Inspection - Codes Residential Failed 8/14/2025 08/14/2025
Misc
Corrective Action Required
07/15/2025
No TCO extension letter submitted items below are not corrected. - Driveway and sidewalk inspection pending - Land sewer trace wire at grade - Sump discharge to be 36” away from foundation Sidewalk - final grading and sod - Seal all exterior penetrations - Provide gutters and downspouts - Provide splash pads at downspouts - complete irrigation system Erosion control: Trim tall vegetation on lot
Erosion Control Inspection Residential Passed 8/20/2025 08/20/2025
DCM2 ESC DEFICIENT INSTALLATION
Resolved
08/20/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - TRIM TALL VEGETATION ON LOT - PROTECT FRONT OF LOT
DCM3 ESC REQUIRED 2 DAY
Resolved
08/20/2025
07/30/25 Jamie S, Erosion control needs to be reestablished. Street needs to be cleaned. Construction debris needs to be removed from lot. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 08/04/25 Jamie S, Erosion Control has been reestablished.
DCM3 ESC REQUIRED 2 DAY
Resolved
08/20/2025
8/6/25 Tyler S. SW, curb, and street need debris and dirt cleaned up. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS 8-8-25 Dustin A, SW has been cleaned , laying sod today
Driveway Inspection Failed 8/21/2025 8/21/2025 08/20/2025
Misc
Informational
07/16/2025
5-8-25 DP. DW was formed, aggregate compacted, approved to pour. 5-16-25 DW was poured, but can not pass until forms have been removed. 7/16/25 DW can not pass until forms have been removed. Call in for reinspection when forms have been pulled. 8/20/25 Tyler S. Form left in the DW by curb. Crack in the SW, and far left side of the approach, last SW panel is out of compliance.
Driveway Inspection Failed 08/20/2025
Misc
Informational
08/20/2025
5-8-25 DP. DW was formed, aggregate compacted, approved to pour. 5-16-25 DW was poured, but can not pass until forms have been removed. 7/16/25 DW can not pass until forms have been removed. Call in for reinspection when forms have been pulled. 8/20/25 Tyler S. Form left in the DW by curb.
Sidewalk Inspection Failed 8/21/2025 8/21/2025 08/20/2025
Misc
Informational
07/16/2025
5-8-25 DP. SW was formed, aggregate compacted, cross slopes in compliance. Approved to pour 5-16-25 DP. SW has been poured, but can not pass until curb line is clean and erosion control has been reestablished. 07/16/25 Jamie S, SW needs to be cleaned off for inspection. Call for reinspection once sidewalk is clear. 8/20/25 Tyler S. Crack in the SW, and far left side of the approach, last SW panel is out of compliance.
Sidewalk Inspection Failed 08/20/2025
Misc
Informational
08/20/2025
5-8-25 DP. SW was formed, aggregate compacted, cross slopes in compliance. Approved to pour 5-16-25 DP. SW has been poured, but can not pass until curb line is clean and erosion control has been reestablished. 07/16/25 Jamie S, SW needs to be cleaned off for inspection. Call for reinspection once sidewalk is clear. 8/20/25 Tyler S. Crack in the SW, and far left side of the approach, last SW panel is out of compliance.
Sidewalk Inspection Partial 10/10/2025 10/10/2025 10/10/2025
Misc
Informational
08/20/2025
5-8-25 DP. SW was formed, aggregate compacted, cross slopes in compliance. Approved to pour 5-16-25 DP. SW has been poured, but can not pass until curb line is clean and erosion control has been reestablished. 07/16/25 Jamie S, SW needs to be cleaned off for inspection. Call for reinspection once sidewalk is clear. 8/20/25 Tyler S. Crack in the SW, and far left side of the approach, last SW panel is out of compliance. 10-10-25 PS Pre pour for replacement sidewalk panels, forms in place and aggregate compacted, approved to pour
Documents & Images
Date Uploaded File Type Document Name
01/30/2025 HM #200 - PERMIT APP
02/04/2025 Approved Plans APPROVED PLANS
02/04/2025 Plot Plan APPROVED PLOT PLAN
02/04/2025 Approved Plans APPROVED TRUSS PACKAGE
02/04/2025 Approved Plans APPROVED TRUSS LAYOUT
02/04/2025 Permit Codes Residential Plan Review
02/05/2025 Permit DS Building Permit
02/05/2025 Receipt Receipt for transaction:2025-000743
03/02/2025 3RD Party Insp Report THIRD PARTY INSPECTION REPORT
03/03/2025 Letter INSPECTION SUMMARY
03/03/2025 Letter INSPECTION SUMMARY
03/13/2025 Letter INSPECTION SUMMARY
03/13/2025 Letter INSPECTION SUMMARY
03/14/2025 Letter INSPECTION SUMMARY
03/14/2025 Letter INSPECTION SUMMARY
03/19/2025 Letter INSPECTION SUMMARY
03/19/2025 Letter INSPECTION SUMMARY
04/08/2025 Letter INSPECTION SUMMARY
04/08/2025 Letter INSPECTION SUMMARY
04/21/2025 Letter INSPECTION SUMMARY
04/23/2025 TRUSS REPAIR
04/23/2025 Letter INSPECTION SUMMARY
05/08/2025 Letter INSPECTION SUMMARY
05/08/2025 Letter INSPECTION SUMMARY
05/16/2025 Letter INSPECTION SUMMARY
05/16/2025 Letter INSPECTION SUMMARY
05/30/2025 Letter INSPECTION SUMMARY
07/10/2025 Letter INSPECTION SUMMARY
07/10/2025 Letter INSPECTION SUMMARY
07/10/2025 Letter INSPECTION SUMMARY
07/10/2025 Letter INSPECTION SUMMARY
07/10/2025 Letter INSPECTION SUMMARY
07/10/2025 Letter INSPECTION SUMMARY
07/15/2025 Letter INSPECTION SUMMARY
07/15/2025 Letter INSPECTION SUMMARY
07/15/2025 Certificate/License Codes Temporary Certificate of Occupancy
07/15/2025 Receipt Receipt for transaction:2025-005508
07/16/2025 Letter INSPECTION SUMMARY
07/16/2025 Letter INSPECTION SUMMARY
07/30/2025 Letter INSPECTION SUMMARY
08/04/2025 Letter INSPECTION SUMMARY
08/06/2025 Letter INSPECTION SUMMARY
08/08/2025 Letter INSPECTION SUMMARY
08/14/2025 Letter INSPECTION SUMMARY
08/20/2025 Letter INSPECTION SUMMARY
08/20/2025 Letter INSPECTION SUMMARY
08/20/2025 Letter INSPECTION SUMMARY
08/20/2025 Letter INSPECTION SUMMARY
08/20/2025 Letter INSPECTION SUMMARY
10/10/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home