Permit Application Status

PRRES20250073


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20250073
Building Permit - Residential
Issued
NEW SINGLE FAMILY
NEW SINGLE FAMILY HOME - SLAB ON GRADE, COVERED PORCH
01/06/2025
06/25/2025
Locations
Contacts
Avital Homes, LLC, Address:7500 W 151st Street, #23100, Phone:(816) 914-7128  
Doug Jenson, Address:11010 Nora Dodge Dr, Phone:(816) 266-0685  
APEX HEATING & AIR CONDITIONING INC, Address:1202 NW EAGLE RIDGE BLVD, Phone:(816) 228-2739  
RED DOG ELECTRIC SERVICES, Address:PO BOX 1, Phone:(913) 208-4816  
A BRIGHT PLUMBING LLC, Address:201 NE WOODBURY DR, Phone:(816) 867-4540  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $939.10 $939.10 Paid 04/03/2025
Right of Way Permit Fee $85.00 $85.00 Paid 04/03/2025
Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 04/03/2025
Water Tap Fee $3,973.00 $3,973.00 Paid 04/03/2025
Water Meter Fee $748.03 $748.03 Paid 04/03/2025
Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 04/03/2025
Not Ready Inspection Fee $75.00 $75.00 Paid 01/27/2026
Outstanding Fees Amount Paid Owing Date Paid
Temporary Occupancy Fee $50.00 $0.00 $50.00 Not Paid


$50.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Plot Plan Inspection Pending
Erosion Control Inspection Residential Pending
Misc
Corrective Action Required
02/11/2026
Maintain overgrown vegetation being addressed under sub permit.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
02/11/2026
2-9-26 Dustin A, Silt fence needs repaired. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 2-11-26 Dustin A, Corrections have been made
Occupancy Inspection - Codes Residential Pending
Misc
Corrective Action Required
02/13/2026
-final grade -sod -downspouts/splash blocks to extend 36 inches from foundation
Sidewalk Inspection Pending
Misc
Informational
02/20/2026
1-28-26 Dustin A, Part of sidewalk is poured on right side of approach. expansion joint not used around water valve 2-12-26 Dustin A, sw on left side of approach has been formed and compacted slopes are in compliance. Expansion joint panel has been replaced . . Approved to pour 2-20-26 Dustin A, Sw did not have white cure applied per city spec
Erosion Control Inspection Residential Partial 5/13/2025 5/13/2025 05/13/2025
Misc
Corrective Action Required
05/13/2025
Maintain overgrown vegetation, being addressed under sub permit.
Footing Inspection - Residential Failed 5/16/2025 5/16/2025 05/16/2025
Misc
Corrective Action Required
05/16/2025
-Plans call for #4 C shaped ties 24” OC -#3 ties 24” OC INSTALLED completely wrapping footing. “O Shaped”
Footing Inspection - Residential Passed 5/21/2025 5/21/2025 05/21/2025
Misc
Resolved
05/21/2025
-Plans call for #4 C shaped ties 24” OC -#3 ties 24” OC INSTALLED completely wrapping footing. “O Shaped”
Underslab Plumbing Inspection - Residential Passed 5/28/2025 5/28/2025 05/28/2025
All Rough Inspection - Residential Partial 7/8/2025 7/8/2025 07/08/2025
Misc
Corrective Action Required
07/08/2025
Partial inspection only Garage portal frame okay to cover.
Electrical Service Inspection Failed 8/6/2025 8/6/2025 08/06/2025
Misc
Corrective Action Required
08/06/2025
-Ufer ground no connected -service cables not landed at meter -main disconnect not installed/panel wired as sub panel
All Rough Inspection - Residential Failed 8/6/2025 8/6/2025 08/06/2025
Misc
Corrective Action Required
07/08/2025
-missing hold down on truss above garage rear wall -address cut stud at entry closet cut for hvac -connect ufer ground to main point of disconnect -complete and land service cables at meter -main panel currently wired as sub panel -secure service entry cable within 12” of disconnect -address over board wall stud at service cable -provide proper slope for dwv above primary bathroom -missing hold down for truss above primary bedroom
Electrical Service Inspection Not Ready 8/8/2025 8/8/2025 08/08/2025
Misc
Corrective Action Required
08/06/2025
-service cables not landed at meter and panel -address 4 non landed conductor
Sewer Service Inspection - R Passed 8/8/2025 8/8/2025 08/08/2025
Electrical Service Inspection Passed 8/13/2025 8/13/2025 08/13/2025
Misc
Resolved
08/13/2025
-service cables not landed at meter and panel -address 4 non landed conductor
All Rough Inspection - Residential Passed 8/13/2025 8/13/2025 08/13/2025
Misc
Resolved
08/13/2025
-missing hold down on truss above garage rear wall -address cut stud at entry closet -connect ufer ground to main point of disconnect -complete and land service cables at meter -main panel currently wired as sub panel -secure service entry cable within 12” of disconnect -address over board wall stud at service cable -provide proper slope for dwv above primary bathroom -missing hold down for truss above primary bedroom
Water Service Inspection - R Passed 8/18/2025 8/18/2025 08/18/2025
Miscellaneous Inspection Failed 9/9/2025 9/9/2025 09/09/2025
Misc
Corrective Action Required
09/09/2025
-No plans on site to verify gb bracing locations. -ensure all panel edges are nailed to code
Miscellaneous Inspection Passed 9/12/2025 9/12/2025 09/12/2025
Misc
Resolved
09/12/2025
-No plans on site to verify gb bracing locations. -ensure all panel edges are nailed to code
Driveway Inspection Partial 12/30/2025 12/30/2025 12/30/2025
Misc
Corrective Action Required
12/30/2025
12-30-25 Dustin A, Dw has been formed and compacted. Good to pour as long as ground temp is above 32 degrees . Please call to have ground temp checked before pouring.
Driveway Inspection Partial 1/5/2026 1/5/2026 01/05/2026
Misc
Corrective Action Required
12/30/2025
12-30-25 Dustin A, Dw has been formed and compacted. Good to pour as long as ground temp is above 32 degrees . 1-5-26 Dustin A, 12-30-25 Dustin A, Dw has been formed and compacted. Good to pour as long as ground temp is above 32 degrees .
Driveway Inspection Passed 1/14/2026 1/14/2026 01/14/2026
Misc
Corrective Action Required
01/05/2026
12-30-25 Dustin A, Dw has been formed and compacted. Good to pour as long as ground temp is above 32 degrees . 1-5-26 Dustin A, 12-30-25 Dustin A, Dw has been formed and compacted. Good to pour as long as ground temp is above 32 degrees . 1-14-26 Dustin A, dw has been poured yo city specs.
Sidewalk Inspection Failed 01/28/2026
Misc
Informational
01/28/2026
1-28-26 Dustin A, Part of sidewalk is poured on right side of approach. expansion joint not used around water valve
Occupancy Inspection - Codes Residential Failed 2/5/2026 2/5/2026 02/05/2026
Misc
Corrective Action Required
02/05/2026
Inspection denied, erosion control not in compliance Repair and maintain all downed silt fence around lot
Erosion Control Inspection Residential Failed 02/09/2026
Misc
Corrective Action Required
05/13/2025
Maintain overgrown vegetation being addressed under sub permit.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
02/09/2026
2-9-26 Dustin A, Silt fence needs repaired. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Partial 2/11/2026 2/11/2026 02/11/2026
Misc
Corrective Action Required
02/09/2026
Maintain overgrown vegetation being addressed under sub permit.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
02/09/2026
2-9-26 Dustin A, Silt fence needs repaired. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 2-11-26 Dustin A, Corrections have been made
Occupancy Inspection - Codes Residential Failed 2/11/2026 2/11/2026 02/11/2026
Misc
Corrective Action Required
02/05/2026
-final grade -sod -downspouts/splash blocks to extend 36 inches from foundation -missing sidewalks -repair sheet rock in mechanical closet -spark rings at kitchen backsplash where required -A/c Breaker not to exceed max breaker size of unit
Sidewalk Inspection Partial 2/12/2026 2/12/2026 02/12/2026
Misc
Informational
01/28/2026
1-28-26 Dustin A, Part of sidewalk is poured on right side of approach. expansion joint not used around water valve 2-12-26 Dustin A, sw on left side of approach has been formed and compacted slopes are in compliance. Expansion joint panel has been replaced . . Approved to pour
Occupancy Inspection - Codes Residential Ready for Temp CO 2/13/2026 2/13/2026 02/13/2026
Misc
Corrective Action Required
02/11/2026
-final grade -sod -downspouts/splash blocks to extend 36 inches from foundation
Sidewalk Inspection Failed 2/20/2026 2/20/2026 02/20/2026
Misc
Informational
02/12/2026
1-28-26 Dustin A, Part of sidewalk is poured on right side of approach. expansion joint not used around water valve 2-12-26 Dustin A, sw on left side of approach has been formed and compacted slopes are in compliance. Expansion joint panel has been replaced . . Approved to pour 2-20-26 Dustin A, Sw did not have white cure applied per city spec
Documents & Images
Date Uploaded File Type Document Name
01/06/2025 Application Form G Permit Application Signed
01/06/2025 Application Form G Tax application
02/21/2025 Approved Plans Approved Final Grading Plan Lots 1 -12 Reserve at Blackwell
04/03/2025 Receipt Receipt for transaction:2025-002029
04/18/2025 Letter DS Building Permit
05/13/2025 Letter INSPECTION SUMMARY
05/16/2025 Letter INSPECTION SUMMARY
05/20/2025 25-0227_Reunion at Blackwell_Struct_Rev#3 Narrative (Footing Change)
05/20/2025 25-0227_23090 Blackwell_Struct_Rev#3 (Footing Changes)
05/21/2025 Letter INSPECTION SUMMARY
05/21/2025 Letter INSPECTION SUMMARY
05/28/2025 Letter INSPECTION SUMMARY
07/08/2025 Letter INSPECTION SUMMARY
08/06/2025 Letter INSPECTION SUMMARY
08/08/2025 Letter INSPECTION SUMMARY
08/08/2025 Letter INSPECTION SUMMARY
08/08/2025 Letter INSPECTION SUMMARY
08/13/2025 Letter INSPECTION SUMMARY
08/13/2025 Letter INSPECTION SUMMARY
08/18/2025 Letter INSPECTION SUMMARY
08/19/2025 Building G Roof Truss (1)
08/19/2025 Building G truss seals
09/09/2025 Letter INSPECTION SUMMARY
09/11/2025 Building G Roof Truss
09/11/2025 Building G truss seals
09/12/2025 Letter INSPECTION SUMMARY
11/17/2025 Approved Plans Truss repair doc
12/30/2025 Letter INSPECTION SUMMARY
01/05/2026 Letter INSPECTION SUMMARY
01/14/2026 Letter INSPECTION SUMMARY
01/27/2026 Receipt Receipt for transaction:2026-000528
01/28/2026 Letter INSPECTION SUMMARY
01/28/2026 Letter INSPECTION SUMMARY
02/05/2026 Letter INSPECTION SUMMARY
02/06/2026 Engineer Report/Study Stand engineering Structural letter for Reserve buildings
02/09/2026 Letter INSPECTION SUMMARY
02/11/2026 Letter INSPECTION SUMMARY
02/11/2026 Letter INSPECTION SUMMARY
02/12/2026 Letter INSPECTION SUMMARY
02/13/2026 Letter INSPECTION SUMMARY
02/20/2026 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home