Summary
PRRES20250050
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - ROOF TRUSSES - FINISHED AND UNFINISHED BASEMENT - UNCOVERED DECK BILL'S PLUMBING PERFORMED THE PLUMBING WORK ON THIS HOUSE Brandon Kalwei 12/18/2025 3:20 PM
01/03/2025
01/07/2025
08/22/2025
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:10450 Holmes Rd Suite 100, Phone:(816) 246-6700  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
BRUCER@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
BILL'S PLUMBING SERVICE LLC, Address:308 E PARK STREET, Phone:(913) 829-8213  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 01/07/2025
Right of Way Permit Fee $85.00 $85.00 Paid 01/07/2025
Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 01/07/2025
Water Tap Fee $3,973.00 $3,973.00 Paid 01/07/2025
Water Meter Fee $748.03 $748.03 Paid 01/07/2025
Valuation Fee New Single Family $1,398.51 $1,398.51 Paid 01/07/2025
Not Ready Inspection Fee $75.00 $75.00 Paid 06/16/2025
Temporary Occupancy Fee $50.00 $50.00 Paid 06/16/2025
Temporary Occupancy Fee $50.00 $50.00 Paid 07/10/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Residential Failed 1/21/2025 01/21/2025
Misc
Corrective Action Required
01/21/2025
- POST ADDRESS
Footing Inspection - Residential Passed 1/21/2025 01/21/2025
Misc
Corrective Action Required
01/21/2025
- INSPECTED BY THIRD PARTY INSPECTOR.
Water Service Inspection - R Partial 2/5/2025 02/05/2025
Misc
Corrective Action Required
02/05/2025
- Partial Poly 20' out of foundation
Sewer Service Inspection - R Passed 2/5/2025 2/5/2025 02/05/2025
Water Service Inspection - R Passed 2/6/2025 2/6/2025 02/06/2025
Misc
Resolved
02/06/2025
- Partial Poly 20' out of foundation
Erosion Control Inspection Residential Failed 2/10/2025 02/10/2025
Misc
Resolved
02/10/2025
- POST ADDRESS
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
02/10/2025
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED.
Underslab Plumbing Inspection - Residential Passed 2/10/2025 2/10/2025 02/10/2025
All Rough Inspection - Residential Failed 3/17/2025 3/17/2025 03/17/2025
Misc
Informational
03/17/2025
- PORTAL FRAME AND PORCH FRAMMING APPROVED ONLY
Electrical Service Inspection Passed 3/28/2025 3/28/2025 03/28/2025
Gas Service Inspection - Residential Failed 3/28/2025 3/28/2025 03/28/2025
Misc
Corrective Action Required
03/28/2025
- defective gauge, replace and request another inspection
All Rough Inspection - Residential Failed 3/28/2025 3/28/2025 03/28/2025
Misc
Informational
03/17/2025
- PORTAL FRAME AND PORCH FRAMMING APPROVED ONLY
Misc
Corrective Action Required
03/28/2025
Inspection denied, no plans or truss package on sight. Tried calling and texting builder.
All Rough Inspection - Residential Failed 3/31/2025 3/31/2025 03/31/2025
Misc
Informational
03/28/2025
- PORTAL FRAME AND PORCH FRAMMING APPROVED ONLY
Misc
Resolved
03/31/2025
Inspection denied, no plans or truss package on sight. Tried calling and texting builder.
Misc
Corrective Action Required
03/31/2025
- Nail off siding at sill plate - Damage trusses B2 in garage, upload engineer repair and complete - Missing trus hold down devices in bedroom 3 - Double stud pack under girder truss short at entry/ garage wall - Re install LIB garage/ entry wall remove slack and proper angle - Missing joints hangers at header basement near sump - Missing anchor bolt basement sill plate at sump wall - Missing joist hanger nails at bottom of basement stairs - Hanger missing on joist bottom of basement stairs, no bearing - Fire block top plate bedroom 1 exterior wall right of window
All Rough Inspection - Residential Failed 4/2/2025 4/2/2025 04/02/2025
Misc
Informational
03/31/2025
- PORTAL FRAME AND PORCH FRAMMING APPROVED ONLY
Misc
Corrective Action Required
03/31/2025
- Damage trusses B2 in garage, upload engineer repair and complete Ok to insulate
Gas Service Inspection - Residential Passed 4/2/2025 4/2/2025 04/02/2025
Misc
Resolved
04/02/2025
- defective gauge, replace and request another inspection
Driveway Inspection Partial 5/8/2025 5/8/2025 05/08/2025
Misc
Informational
05/08/2025
5-8-25 DP. DW is formed, aggregate compacted, approved to pour.
Sidewalk Inspection Partial 5/8/2025 5/8/2025 05/08/2025
Misc
Informational
05/08/2025
5-8-25 DP. SW was formed, aggregate compacted, cross slopes in compliance. Approved to pour
Driveway Inspection Partial 5/16/2025 5/16/2025 05/16/2025
Misc
Informational
05/08/2025
5-8-25 DP. DW is formed, aggregate compacted, approved to pour. 5-16-25 DP. Can not pass until forms have been removed
Sidewalk Inspection Partial 5/16/2025 5/16/2025 05/16/2025
Misc
Informational
05/08/2025
5-8-25 DP. SW was formed, aggregate compacted, cross slopes in compliance. Approved to pour 5-16-25 DP. Can not pass until forms have been removed, curb line is cleaned and erosion control has been reestablished.
Piers/Caissons Inspection - Residential Passed 5/30/2025 5/30/2025 05/30/2025
Occupancy Inspection - Codes Residential Not Ready 6/9/2025 6/9/2025 06/09/2025
Misc
Corrective Action Required
06/09/2025
-house locked. No entry, no inspection performed. address all below before calling for reinspection -address pending all rough inspection (uncover truss fixes for inspection) -address pending driveway and sidewalk inspections -pay fees
Erosion Control Inspection Residential Failed 6/11/2025 06/11/2025
DCM6 ESC INSP DENIED STREET CLEAN UP
Resolved
06/11/2025
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED.
Misc
Corrective Action Required
06/11/2025
REMOVE TRASH FROM LOT
All Rough Inspection - Residential Failed 6/11/2025 6/11/2025 06/11/2025
Misc
Informational
04/02/2025
- PORTAL FRAME AND PORCH FRAMMING APPROVED ONLY
Misc
Corrective Action Required
04/02/2025
- Damage trusses B2 in garage, upload engineer repair and complete Ok to insulate
Miscellaneous Correction
Corrective Action Required
06/11/2025
PROVIDE LADDER FOR INSPECTION OF TRUSS REPAIR IN GARAGE
Plot Plan Inspection Passed 6/11/2025 06/11/2025
Occupancy Inspection - Codes Residential Failed 6/11/2025 6/11/2025 06/11/2025
Misc
Corrective Action Required
06/09/2025
- perform final grading and sod - Missing deck stairs landing - Seal top of electrical service meter - sump discharge to be 36” away from foundation - Remove trash from lot throughout -address pending all rough inspection (uncover truss fixes for inspection) or provide ladder -address pending driveway and sidewalk inspections -pay fees - provide splash pads at down spouts
Occupancy Inspection - Codes Residential Failed 6/13/2025 6/13/2025 06/13/2025
Misc
Corrective Action Required
06/11/2025
- perform final grading and sod - - Seal top of electrical service meter - sump discharge to be 36” away from foundation - Remove trash from lot throughout -address pending all rough inspection (uncover truss fixes for inspection) or provide ladder -address pending driveway and sidewalk inspections -pay fees - provide splash pads at down spouts
All Rough Inspection - Residential Passed 6/16/2025 6/16/2025 06/16/2025
Misc
Resolved
06/16/2025
- PORTAL FRAME AND PORCH FRAMMING APPROVED ONLY
Misc
Resolved
06/16/2025
- Damage trusses B2 in garage, upload engineer repair and complete Ok to insulate
Miscellaneous Correction
Resolved
06/16/2025
PROVIDE LADDER FOR INSPECTION OF TRUSS REPAIR IN GARAGE
Occupancy Inspection - Codes Residential Ready for Temp CO 6/16/2025 6/16/2025 06/16/2025
Misc
Corrective Action Required
06/13/2025
- perform final grading and sod - sump discharge to be 36” away from foundation -address pending driveway and sidewalk inspections -pay fees - provide splash pads at down spouts - Land sewer trace wire at grade
Erosion Control Inspection Residential Partial 6/16/2025 06/16/2025
Misc
Resolved
06/16/2025
REMOVE TRASH FROM LOT
Miscellaneous Correction
Corrective Action Required
06/16/2025
- Erosion control in place at time of inspection
Occupancy Inspection - Codes Residential Ready for Temp CO 7/10/2025 07/10/2025
Misc
Corrective Action Required
06/16/2025
- perform final grading and sod - sump discharge to be 36” away from foundation -address pending driveway and sidewalk inspections -pay fees - provide splash pads at down spouts - Land sewer trace wire at grade
Miscellaneous Correction
Corrective Action Required
07/10/2025
EXTENDED Shawn Hoffman 07/10/2025 9:23 AM
Erosion Control Inspection Residential Failed 7/10/2025 07/10/2025
Miscellaneous Correction
Resolved
07/10/2025
- Erosion control in place at time of inspection
Misc
Corrective Action Required
07/10/2025
- PROTECT THE FRONT OF LOT - TRIM ALL TALL VEGETATION
Erosion Control Inspection Residential Failed 7/30/2025 7/30/2025 07/30/2025
Misc
Corrective Action Required
07/10/2025
- PROTECT THE FRONT OF LOT - TRIM ALL TALL VEGETATION
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/30/2025
07/30/25 Jamie S, Erosion control needs to be reestablished. Street and downstream storm drain need to be cleaned. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Partial 8/4/2025 8/4/2025 08/04/2025
Misc
Corrective Action Required
07/30/2025
- PROTECT THE FRONT OF LOT - TRIM ALL TALL VEGETATION
DCM3 ESC REQUIRED 2 DAY
Resolved
08/04/2025
07/30/25 Jamie S, Erosion control needs to be reestablished. Street and downstream storm drain need to be cleaned. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 08/04/25 Jamie S, Erosion Control has been reestablished.
Erosion Control Inspection Residential Failed 08/06/2025
Misc
Corrective Action Required
08/04/2025
- PROTECT THE FRONT OF LOT - TRIM ALL TALL VEGETATION
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/06/2025
8/6/25 Tyler S. SW and street and curb line all need dirt and debris cleaned up. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Partial 8/8/2025 8/8/2025 08/08/2025
Misc
Corrective Action Required
08/06/2025
- PROTECT THE FRONT OF LOT - TRIM ALL TALL VEGETATION
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/06/2025
8/6/25 Tyler S. SW and street and curb line all need dirt and debris cleaned up. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.. 8-8-25 Dustin A, SW has been cleaned , laying sod today
Driveway Inspection Failed 8/21/2025 8/21/2025 08/21/2025
Misc
Informational
05/16/2025
5-8-25 DP. DW is formed, aggregate compacted, approved to pour. 5-16-25 DP. Can not pass until forms have been removed 8/21/25 Tyler S. Concrete form on south side of DW needs pulled. Fail.
Sidewalk Inspection Passed 8/21/2025 8/21/2025 08/21/2025
Misc
Informational
05/16/2025
5-8-25 DP. SW was formed, aggregate compacted, cross slopes in compliance. Approved to pour 5-16-25 DP. Can not pass until forms have been removed, curb line is cleaned and erosion control has been reestablished. 8/21/25 Tyler S. SW is in compliance and meets all ADA specs. Pass.
Erosion Control Inspection Residential Passed 8/21/2025 08/21/2025
Misc
Resolved
08/21/2025
- PROTECT THE FRONT OF LOT - TRIM ALL TALL VEGETATION
DCM3 ESC REQUIRED 2 DAY
Resolved
08/21/2025
8/6/25 Tyler S. SW and street and curb line all need dirt and debris cleaned up. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.. 8-8-25 Dustin A, SW has been cleaned , laying sod today
Occupancy Inspection - Codes Residential Failed 8/21/2025 8/21/2025 08/21/2025
Misc
Corrective Action Required
07/10/2025
-address pending driveway and sidewalk inspections 8/21/25 Tyler S. Concrete form on south side of DW needs pulled. Fail.
Miscellaneous Correction
Resolved
08/21/2025
EXTENDED Shawn Hoffman 07/10/2025 9:23 AM
Driveway Inspection Passed 8/21/2025 8/21/2025 08/21/2025
Misc
Informational
08/21/2025
5-8-25 DP. DW is formed, aggregate compacted, approved to pour. 5-16-25 DP. Can not pass until forms have been removed 8/21/25 Tyler S. Concrete form on south side of DW needs pulled. Fail. 8/21/25 Tyler S. DW is in compliance and meets city standards.
Occupancy Inspection - Codes Residential Full C of O 8/22/2025 8/22/2025 08/22/2025
Misc
Resolved
08/22/2025
-address pending driveway and sidewalk inspections 8/21/25 Tyler S. Concrete form on south side of DW needs pulled. Fail.
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home

*PLEASE NOTE - You must be logged in with your registered user account to view any documents related to your permit