Summary
PRRES20250043
Building Permit - Residential
Issued
NEW SINGLE FAMILY
NEW SINGLE FAMILY HOME - COVERED PORCH, UNFINISHED BASEMENT STOP WORK ORDER generated on 02/23/2026 12:00 AM by username 'Dustin Agcopra'. STOP WORK ORDER removed on 03/13/2026 12:00 AM by username 'Dustin Agcopra'.
01/02/2025
06/25/2025
Locations
Contacts
Avital Homes, LLC, Address:7500 W 151st Street, #23100, Phone:(816) 914-7128  
Doug Jenson, Address:11010 Nora Dodge Dr, Phone:(816) 266-0685  
RED DOG ELECTRIC SERVICES, Address:PO BOX 1, Phone:(913) 208-4816  
APEX HEATING & AIR CONDITIONING INC, Address:1202 NW EAGLE RIDGE BLVD, Phone:(816) 228-2739  
A BRIGHT PLUMBING LLC, Address:201 NE WOODBURY DR, Phone:(816) 867-4540  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,204.79 $1,204.79 Paid 04/03/2025
Right of Way Permit Fee $85.00 $85.00 Paid 04/03/2025
Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 04/03/2025
Water Tap Fee $3,973.00 $3,973.00 Paid 04/03/2025
Water Meter Fee $748.03 $748.03 Paid 04/03/2025
Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 04/03/2025
Outstanding Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $112.89 $0.00 $112.89 Not Paid
$1,317.68


$112.89    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Piers/Caissons Inspection - Residential Pending
Electrical Service Inspection Pending
Driveway Inspection Pending
Plot Plan Inspection Pending
Gas Service Inspection - Residential Pending
Occupancy Inspection - Codes Residential Pending
Sidewalk Inspection Pending
Footing Inspection - Residential Pending
Misc
Corrective Action Required
11/05/2025
Plans missing details to perform inspection
All Rough Inspection - Residential Pending
Misc
Informational
02/11/2026
Garage portal frame inspection only
Erosion Control Inspection Residential Pending
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/13/2026
2-20-26 Dustin A, Silt fence is knocked down by contractors. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. (2-23-26) 2-23-26 Dustin A, No steps have been made to correct this. STOP WORK issued, Must call in a erosion inspection once either silt fence is corrected and or a proper construction entrance is installed and curb lines are cleaned , 3-13-26 Dustin A, corrections have been made to resume working
Sidewalk Inspection Pending
Footing Inspection - Residential Failed 11/5/2025 11/5/2025 11/05/2025
Misc
Corrective Action Required
11/05/2025
Plans missing details to perform inspection
Underslab Plumbing Inspection - Residential Passed 12/19/2025 12/19/2025 12/19/2025
Sewer Service Inspection - R Passed 12/29/2025 12/29/2025 12/29/2025
Water Service Inspection - R Partial 12/31/2025 12/31/2025 12/31/2025
Water Service Inspection - R Passed 1/5/2026 1/5/2026 01/05/2026
All Rough Inspection - Residential Partial 2/11/2026 2/11/2026 02/11/2026
Misc
Informational
02/11/2026
Garage portal frame inspection only
Erosion Control Inspection Residential Failed 2/20/2026 2/20/2026 02/20/2026
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
02/20/2026
2-20-26 Dustin A, Silt fence is knocked down by contractors. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. (2-23-26)
Erosion Control Inspection Residential Failed - Stop Work 2/23/2026 2/23/2026 02/23/2026
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
02/20/2026
2-20-26 Dustin A, Silt fence is knocked down by contractors. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. (2-23-26) 2-23-26 Dustin A, No steps have been made to correct this. STOP WORK issued, Must call in a erosion inspection once either silt fence is corrected and or a proper construction entrance is installed and curb lines are cleaned ,
Erosion Control Inspection Residential Partial 3/13/2026 3/13/2026 03/13/2026
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
02/23/2026
2-20-26 Dustin A, Silt fence is knocked down by contractors. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. (2-23-26) 2-23-26 Dustin A, No steps have been made to correct this. STOP WORK issued, Must call in a erosion inspection once either silt fence is corrected and or a proper construction entrance is installed and curb lines are cleaned , 3-13-26 Dustin A, corrections have been made to resume working
Documents & Images
Date Uploaded File Type Document Name
01/02/2025 Application Form J Permit Application Signed
01/02/2025 Application Form J Tax application
02/21/2025 Approved Plans Approved Final Grading Plan Lots 1 -12 Reserve at Blackwell
03/06/2025 Plans 21075_Blackwell Reserve_Rev 2_Bldg J_250305
03/31/2025 Plans 21075_Blackwell Reserve_Bldg J CDs_250312
04/03/2025 Receipt Receipt for transaction:2025-002029
04/03/2025 Approved Plans APPROVED J PLANS
04/03/2025 Permit DS Building Permit
05/20/2025 Permit Codes Residential Plan Review
07/31/2025 Approved Plans APPROVED REVISED FINAL GRADE PLAN FOR LOTS 1 THRU 4
09/22/2025 Approved Plans APPROVED UPDATED PLANS
10/07/2025 Letter Codes 140 Day Letter
11/05/2025 Letter INSPECTION SUMMARY
11/17/2025 Approved Plans Truss repair doc
12/03/2025 Approved Plans Approved - Gyp Board at Stair Stringer Struct Response_Reserves at Blackwell
12/19/2025 Letter INSPECTION SUMMARY
12/29/2025 Letter INSPECTION SUMMARY
12/31/2025 Letter INSPECTION SUMMARY
01/05/2026 Letter INSPECTION SUMMARY
01/09/2026 Approved Plans Approved trusses Lot 1
02/06/2026 Engineer Report/Study Stand engineering Structural letter for Reserve buildings
02/11/2026 Letter INSPECTION SUMMARY
02/20/2026 Letter INSPECTION SUMMARY
02/23/2026 Letter Stop Work Order
03/13/2026 Letter INSPECTION SUMMARY
03/13/2026 Letter Stop Work Order
03/16/2026 Approved Plans Approved truss revisions
04/02/2026 3RD Party Insp Report 1 & 3 Reserve at Blackwell - Field Letter
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home