Permit Application Status

PRRES20246440


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20246440
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - ROOF TRUSSES - UNFINSIHED BASEMENT - UNCOVERED DECK STOP WORK ORDER generated on 08/08/2025 12:00 AM by username 'Jamie Simerly'. STOP WORK ORDER removed on 08/14/2025 12:00 AM by username 'Jamie Simerly'.
12/18/2024
12/20/2024
08/20/2025
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
BRUCER@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 12/20/2024
Right of Way Permit Fee $85.00 $85.00 Paid 12/20/2024
Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 12/20/2024
Water Tap Fee $3,973.00 $3,973.00 Paid 12/20/2024
Water Meter Fee $748.03 $748.03 Paid 12/20/2024
Valuation Fee New Single Family $1,788.64 $1,788.64 Paid 12/20/2024
Not Ready Inspection Fee $75.00 $75.00 Paid 06/16/2025
Temporary Occupancy Fee $50.00 $50.00 Paid 06/16/2025
Temporary Occupancy Fee $50.00 $50.00 Paid 07/10/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 1/21/2025 01/21/2025
R403 FOOTINGS
Informational
01/21/2025
Inspection by third party inspector
Erosion Control Inspection Residential Failed 1/21/2025 01/21/2025
Misc
Corrective Action Required
01/21/2025
-POST ADDRESS
Sewer Service Inspection - R Passed 2/6/2025 2/6/2025 02/06/2025
Water Service Inspection - R Passed 2/7/2025 2/7/2025 02/07/2025
Underslab Plumbing Inspection - Residential Passed 2/11/2025 2/11/2025 02/11/2025
Erosion Control Inspection Residential Partial 2/11/2025 02/11/2025
Misc
Resolved
02/11/2025
-POST ADDRESS
Misc
Corrective Action Required
02/11/2025
- EROSION CONTROL IN PLACE AT TIME OF INSPECTION.
Erosion Control Inspection Residential Partial 3/11/2025 3/11/2025 03/12/2025
Misc
Corrective Action Required
02/11/2025
- EROSION CONTROL IN PLACE AT TIME OF INSPECTION.
Miscellaneous Correction
Corrective Action Required
03/11/2025
3-11-25 DP. Erosion control measures are no longer in place and the street is a mess. This will need to be handled by 3/14/25 or a stop work order will be issued. Thanks.
All Rough Inspection - Residential Failed 3/19/2025 3/19/2025 03/19/2025
Misc
Corrective Action Required
03/19/2025
- PORAL FRAME AND FRONT PORCH FRAMING APPROVED ONLY.
Erosion Control Inspection Residential Partial 3/19/2025 3/19/2025 03/19/2025
Misc
Corrective Action Required
03/11/2025
- EROSION CONTROL IN PLACE AT TIME OF INSPECTION.
Miscellaneous Correction
Resolved
03/19/2025
Electrical Service Inspection Passed 3/31/2025 3/31/2025 03/31/2025
Gas Service Inspection - Residential Passed 3/31/2025 3/31/2025 03/31/2025
All Rough Inspection - Residential Failed 3/31/2025 3/31/2025 03/31/2025
Misc
Resolved
03/31/2025
- PORAL FRAME AND FRONT PORCH FRAMING APPROVED ONLY.
Misc
Corrective Action Required
03/31/2025
- Fire block top of chase in pantry - Fire block end of soffit in pantry - Repair joist hanger great room at I- beam were bolt in the way - Anchor bolts to be in middle of the plate in basement
All Rough Inspection - Residential Passed 4/2/2025 4/2/2025 04/02/2025
Misc
Resolved
04/02/2025
- Fire block top of chase in pantry - Fire block end of soffit in pantry - Repair joist hanger great room at I- beam were bolt in the way - Anchor bolts to be in middle of the plate in basement
Erosion Control Inspection Residential Partial 4/2/2025 04/02/2025
Misc
Corrective Action Required
03/19/2025
- EROSION CONTROL IN PLACE AT TIME OF INSPECTION.
Driveway Inspection Partial 5/8/2025 5/8/2025 05/08/2025
Misc
Informational
05/08/2025
5-8-25 DP. DW was formed, aggregate compacted, approved to pour.
Sidewalk Inspection Partial 5/8/2025 5/8/2025 05/08/2025
Misc
Informational
05/08/2025
5-8-25 DP. SW is formed, aggregate compacted, cross slopes in compliance, approved to pour.
Driveway Inspection Partial 5/16/2025 5/16/2025 05/16/2025
Misc
Informational
05/08/2025
5-8-25 DP. DW was formed, aggregate compacted, approved to pour. 5-16-25 DP. Forms need removed.
Sidewalk Inspection Partial 5/16/2025 5/16/2025 05/16/2025
Misc
Informational
05/08/2025
5-8-25 DP. SW is formed, aggregate compacted, cross slopes in compliance, approved to pour. 5-16-25 DP. Will come back to pass the SW once the curb line is cleaned and erosion control is reestablished.
Piers/Caissons Inspection - Residential Passed 6/4/2025 6/4/2025 06/04/2025
Occupancy Inspection - Codes Residential Failed 6/6/2025 6/6/2025 06/06/2025
Misc
Corrective Action Required
06/06/2025
- final grading and sod - Sump discharge to be 36” away from foundation - Provide splash pads at down spouts - Seal exterior penetration at gas piping - Provide landing for deck stairs - Provide handrail for deck stairs - At stairs to basement the top step is over 7 3/4” rise - Driveway and sidewalk inspections pending
Erosion Control Inspection Residential Failed 6/6/2025 06/06/2025
Misc
Resolved
06/06/2025
- EROSION CONTROL IN PLACE AT TIME OF INSPECTION.
Plot Plan Inspection Passed 6/11/2025 06/11/2025
Erosion Control Inspection Residential Partial 6/11/2025 06/11/2025
Miscellaneous Correction
Corrective Action Required
06/11/2025
EROSION CONTROL IN PLACE AT TIME OF INSPECTION.
Occupancy Inspection - Codes Residential Not Ready 6/11/2025 6/11/2025 06/11/2025
Misc
Corrective Action Required
06/06/2025
- Pay all fees - final grading and sod - Sump discharge to be 36” away from foundation - Provide splash pads at down spouts - Seal exterior penetration at gas piping - Provide landing for deck stairs - Provide handrail for deck stairs - At stairs to basement the top step is over 7 3/4” rise - Driveway and sidewalk inspections pending
Misc
Corrective Action Required
06/11/2025
NOT READY NO CHANGES Shawn Hoffman 06/11/2025 9:45 AM
Occupancy Inspection - Codes Residential Failed 6/13/2025 6/13/2025 06/13/2025
Misc
Corrective Action Required
06/11/2025
- Pay all fees - final grading and sod - Sump discharge to be 36” away from foundation - Provide splash pads at down spouts - Seal exterior penetration at gas piping - Provide handrail for deck stairs - Driveway and sidewalk inspections pending
Misc
Resolved
06/13/2025
NOT READY NO CHANGES Shawn Hoffman 06/11/2025 9:45 AM
Erosion Control Inspection Residential Partial 6/13/2025 06/13/2025
Miscellaneous Correction
Corrective Action Required
06/11/2025
EROSION CONTROL IN PLACE AT TIME OF INSPECTION.
Erosion Control Inspection Residential Partial 6/16/2025 06/16/2025
Miscellaneous Correction
Corrective Action Required
06/13/2025
EROSION CONTROL IN PLACE AT TIME OF INSPECTION.
Occupancy Inspection - Codes Residential Ready for Temp CO 6/16/2025 6/16/2025 06/16/2025
Misc
Corrective Action Required
06/13/2025
- Pay all fees - final grading and sod - Sump discharge to be 36” away from foundation - Provide splash pads at down spouts - Seal exterior penetration at gas piping - Driveway and sidewalk inspections pending
Occupancy Inspection - Codes Residential Ready for Temp CO 7/10/2025 07/10/2025
Misc
Corrective Action Required
06/16/2025
- Pay all fees - final grading and sod - Sump discharge to be 36” away from foundation - Provide splash pads at down spouts - Seal exterior penetration at gas piping - Driveway and sidewalk inspections pending
Miscellaneous Correction
Corrective Action Required
07/10/2025
- EXTENDED Shawn Hoffman 07/10/2025 9:30 AM
Erosion Control Inspection Residential Failed 7/10/2025 07/10/2025
Miscellaneous Correction
Resolved
07/10/2025
EROSION CONTROL IN PLACE AT TIME OF INSPECTION.
Miscellaneous Correction
Corrective Action Required
07/10/2025
- PROTECT FRONT OF LOT - TRIM ALL TALL VEGETATION
Driveway Inspection Partial 7/16/2025 7/16/2025 07/16/2025
Misc
Informational
05/16/2025
5-8-25 DP. DW was formed, aggregate compacted, approved to pour. 5-16-25 DP. Forms need removed. 07/16/25 Jamie S, DW forms are still up. Call in for reinspection once forms have been removed.
Sidewalk Inspection Partial 7/16/2025 7/16/2025 07/16/2025
Misc
Informational
05/16/2025
5-8-25 DP. SW is formed, aggregate compacted, cross slopes in compliance, approved to pour. 5-16-25 DP. Will come back to pass the SW once the curb line is cleaned and erosion control is reestablished. 07/16/25 Jamie S, SW needs to be cleaned off for inspection. Call in for reinspection once sidewalk is cleaned off.
Erosion Control Inspection Residential Failed 8/5/2025 8/5/2025 08/05/2025
Miscellaneous Correction
Corrective Action Required
07/10/2025
- PROTECT FRONT OF LOT - TRIM ALL TALL VEGETATION
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/05/2025
08/05/25 Jamie S, Silt is escaping from under the sod and covering the sidewalk and street causing a safety hazard for residence around mailbox. Erosion control measures and cleanup of public surfaces are required until vegetation is established enough to stop silt for escaping on to public surfaces. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Failed - Stop Work 8/8/2025 8/8/2025 08/08/2025
Miscellaneous Correction
Corrective Action Required
08/05/2025
- PROTECT FRONT OF LOT - TRIM ALL TALL VEGETATION
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/05/2025
08/05/25 Jamie S, Silt is escaping from under the sod and covering the sidewalk and street causing a safety hazard for residence around mailbox. Erosion control measures and cleanup of public surfaces are required until vegetation is established enough to stop silt for escaping on to public surfaces. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 08/08/25 Jamie S, Silt is still present on sidewalk and the around mailbox. No erosion control has been placed to prevent it.
Erosion Control Inspection Residential Failed 8/11/2025 8/11/2025 08/11/2025
Miscellaneous Correction
Corrective Action Required
08/08/2025
- PROTECT FRONT OF LOT - TRIM ALL TALL VEGETATION
DCM3 ESC REQUIRED 2 DAY
Partial Correction
08/11/2025
08/05/25 Jamie S, Silt is escaping from under the sod and covering the sidewalk and street causing a safety hazard for residence around mailbox. Erosion control measures and cleanup of public surfaces are required until vegetation is established enough to stop silt for escaping on to public surfaces. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 08/08/25 Jamie S, Silt is still present on sidewalk and the around mailbox. No erosion control has been placed to prevent it. 08/11/25 Jamie S, Silt is still washing onto sidewalk and around the mailbox. Continued cleanup of public surfaces is required until vegetation is established enough to stop silt from escaping onto public surfaces.
Erosion Control Inspection Residential Partial 8/14/2025 8/14/2025 08/14/2025
Miscellaneous Correction
Corrective Action Required
08/11/2025
- PROTECT FRONT OF LOT - TRIM ALL TALL VEGETATION
DCM3 ESC REQUIRED 2 DAY
Resolved
08/14/2025
08/05/25 Jamie S, Silt is escaping from under the sod and covering the sidewalk and street causing a safety hazard for residence around mailbox. Erosion control measures and cleanup of public surfaces are required until vegetation is established enough to stop silt for escaping on to public surfaces. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 08/08/25 Jamie S, Silt is still present on sidewalk and the around mailbox. No erosion control has been placed to prevent it. 08/11/25 Jamie S, Silt is still washing onto sidewalk and around the mailbox. Continued cleanup of public surfaces is required until vegetation is established enough to stop silt from escaping onto public surfaces. 08/14/25 Jamie S, Silt has been cleaned up off of public surfaces.
Erosion Control Inspection Residential Passed 8/20/2025 08/20/2025
Miscellaneous Correction
Resolved
08/20/2025
- PROTECT FRONT OF LOT - TRIM ALL TALL VEGETATION
Driveway Inspection Passed 08/20/2025
Misc
Informational
07/16/2025
5-8-25 DP. DW was formed, aggregate compacted, approved to pour. 5-16-25 DP. Forms need removed. 07/16/25 Jamie S, DW forms are still up. Call in for reinspection once forms have been removed. 8/20/25 Tyler S. DW meets all ADA specs and is in compliance. Pass.
Sidewalk Inspection Passed 08/20/2025
Misc
Informational
07/16/2025
5-8-25 DP. SW is formed, aggregate compacted, cross slopes in compliance, approved to pour. 5-16-25 DP. Will come back to pass the SW once the curb line is cleaned and erosion control is reestablished. 07/16/25 Jamie S, SW needs to be cleaned off for inspection. Call in for reinspection once sidewalk is cleaned off. 8/20/25 Tyler S. SW is in compliance and meets all ADA specs. Passed.
Occupancy Inspection - Codes Residential Full C of O 8/20/2025 8/20/2025 08/20/2025
Misc
Resolved
08/20/2025
- Driveway and sidewalk inspections pending
Miscellaneous Correction
Resolved
08/20/2025
- EXTENDED Shawn Hoffman 07/10/2025 9:30 AM
Documents & Images
Date Uploaded File Type Document Name
12/18/2024 HM #140 - ENGINEERED PLANS
12/18/2024 HM #140 - PLOT PLAN
12/18/2024 HM #140 - TRUSS DETAILS
12/18/2024 HM #140 - TRUSS LAYOUT
12/20/2024 HM #140 - PERMIT APP
12/20/2024 Approved Plans APPROVED PLANS
12/20/2024 Plot Plan APPROVED PLOT PLAN
12/20/2024 Approved Plans APPROVED TRUSS LAYOUT
12/20/2024 Approved Plans APPROVED TRUSS PACKAGE
12/20/2024 Permit Codes Residential Plan Review
12/20/2024 Permit DS Building Permit
12/20/2024 Receipt Receipt for transaction:2024-009629
01/20/2025 3RD Party Insp Report THIRD PARTY FOOTING INSPECTION
01/21/2025 Letter INSPECTION SUMMARY
01/21/2025 Letter INSPECTION SUMMARY
02/06/2025 Letter INSPECTION SUMMARY
02/07/2025 Letter INSPECTION SUMMARY
02/11/2025 Letter INSPECTION SUMMARY
02/11/2025 Letter INSPECTION SUMMARY
03/11/2025 Letter INSPECTION SUMMARY
03/19/2025 Letter INSPECTION SUMMARY
03/19/2025 Letter INSPECTION SUMMARY
03/31/2025 Letter INSPECTION SUMMARY
03/31/2025 Letter INSPECTION SUMMARY
03/31/2025 Letter INSPECTION SUMMARY
03/31/2025 Letter INSPECTION SUMMARY
03/31/2025 Letter INSPECTION SUMMARY
04/02/2025 Letter INSPECTION SUMMARY
04/02/2025 Letter INSPECTION SUMMARY
04/04/2025 Engineer Report/Study ENGINEER DRILLED FLOOR JOIST LETTER
05/08/2025 Letter INSPECTION SUMMARY
05/08/2025 Letter INSPECTION SUMMARY
05/16/2025 Letter INSPECTION SUMMARY
05/16/2025 Letter INSPECTION SUMMARY
06/04/2025 Letter INSPECTION SUMMARY
06/06/2025 Letter INSPECTION SUMMARY
06/06/2025 Letter INSPECTION SUMMARY
06/11/2025 Letter INSPECTION SUMMARY
06/11/2025 Letter INSPECTION SUMMARY
06/11/2025 Letter INSPECTION SUMMARY
06/13/2025 Letter INSPECTION SUMMARY
06/13/2025 Letter INSPECTION SUMMARY
06/16/2025 Letter INSPECTION SUMMARY
06/16/2025 Certificate/License Codes Temporary Certificate of Occupancy
06/16/2025 Receipt Receipt for transaction:2025-004544
06/16/2025 Letter INSPECTION SUMMARY
07/09/2025 Application Form TCO ExtensioN
07/10/2025 Letter INSPECTION SUMMARY
07/10/2025 Letter INSPECTION SUMMARY
07/10/2025 Certificate/License Codes Temporary Certificate of Occupancy
07/10/2025 Receipt Receipt for transaction:2025-005385
07/16/2025 Letter INSPECTION SUMMARY
07/16/2025 Letter INSPECTION SUMMARY
08/05/2025 Letter INSPECTION SUMMARY
08/08/2025 Letter Stop Work Order
08/11/2025 Letter INSPECTION SUMMARY
08/14/2025 Letter INSPECTION SUMMARY
08/20/2025 Letter INSPECTION SUMMARY
08/20/2025 Letter INSPECTION SUMMARY
08/20/2025 Letter INSPECTION SUMMARY
08/20/2025 Letter INSPECTION SUMMARY
08/20/2025 Letter Codes Final Certificate of Occupancy
08/20/2025 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home