Summary
PRRES20246187
Building Permit - Residential
Temporary Occupancy
NEW SINGLE FAMILY
NEW HOUSE - ROOF TRUSSES - UNCOVERED DECK - FINISHED AND UNFINISHED BASEMENT - STOP WORK ORDER generated on 01/02/2025 12:00 AM by username 'Shawn Hoffman'. STOP WORK ORDER removed on 01/21/2025 12:00 AM by username 'Shawn Hoffman'.
11/27/2024
12/03/2024
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
BRUCER@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 12/03/2024
Right of Way Permit Fee $85.00 $85.00 Paid 12/03/2024
Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 12/03/2024
Water Tap Fee $3,973.00 $3,973.00 Paid 12/03/2024
Water Meter Fee $748.03 $748.03 Paid 12/03/2024
Valuation Fee New Single Family $2,081.08 $2,081.08 Paid 12/03/2024
Sidewalk Deposit $3,750.00 $3,750.00 Paid 05/28/2025
Not Ready Inspection Fee $75.00 $75.00 Paid 05/28/2025
Temporary Occupancy Fee $50.00 $50.00 Paid 05/28/2025
Temporary Occupancy Fee $50.00 $50.00 Paid 06/30/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Residential Pending
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
06/27/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - No protection at fron of lot.
Occupancy Inspection - Codes Residential Pending
Misc
Corrective Action Required
06/30/2025
- Final grading and sod - Land sewer trace wire - Provide splash pads at down spouts - Sump discharge to be 36” away from foundation
Misc
Corrective Action Required
06/30/2025
requesting extention Shawn Hoffman 06/30/2025 12:35 PM
Erosion Control Inspection Residential Failed 12/20/2024 12/20/2024
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
12/20/2024
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. - Post address -Protect street
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
01/02/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Footing Inspection - Residential Passed 12/20/2024 12/20/2024
Misc
Corrective Action Required
12/20/2024
Third party inspection
Erosion Control Inspection Residential Failed - Stop Work 1/2/2025 01/02/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
12/20/2024
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. - Post address -Protect street
Erosion Control Inspection Residential Partial 1/21/2025 1/21/2025 01/21/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
01/21/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. - Post address -Protect street
Misc
Corrective Action Required
01/21/2025
Erosion cotrol in place at time of inspection
Erosion Control Inspection Residential Partial 1/22/2025 01/22/2025
Misc
Corrective Action Required
01/21/2025
Erosion cotrol in place at time of inspection
Water Service Inspection - R Partial 1/22/2025 01/22/2025
Misc
Corrective Action Required
01/22/2025
- PARTIAL, POLY 30' OUT OF FOUNDATION
Sewer Service Inspection - R Passed 1/22/2025 1/22/2025 01/22/2025
Underslab Plumbing Inspection - Residential Passed 1/23/2025 1/23/2025 01/23/2025
Erosion Control Inspection Residential Partial 1/23/2025 01/23/2025
Misc
Corrective Action Required
01/22/2025
Erosion cotrol in place at time of inspection
Water Service Inspection - R Passed 1/23/2025 1/23/2025 01/23/2025
Misc
Resolved
01/23/2025
- PARTIAL, POLY 30' OUT OF FOUNDATION
All Rough Inspection - Residential Failed 2/25/2025 2/25/2025 02/25/2025
Miscellaneous Correction
Informational
02/25/2025
Exterior garage PFH sheathing and front porch truss tie downs passed and are okay to cover This is a partial pass only
All Rough Inspection - Residential Failed 3/10/2025 3/10/2025 03/10/2025
Miscellaneous Correction
Informational
02/25/2025
Exterior garage PFH sheathing and front porch truss tie downs passed and are okay to cover This is a partial pass only
Misc
Corrective Action Required
03/10/2025
- In pantry, fire block soffit at HVAC chase and garage wall - Floor joist hangers missing nails in great room - Minimum of 3 studs on exterior corners, basement South corner - No gauge on Gas line for inspection
Erosion Control Inspection Residential Failed 3/10/2025 03/10/2025
Misc
Resolved
03/10/2025
Erosion cotrol in place at time of inspection
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
03/10/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. - No pretection in back of lot.
Electrical Service Inspection Passed 3/10/2025 3/10/2025 03/10/2025
Gas Service Inspection - Residential Failed 3/10/2025 3/10/2025 03/10/2025
Misc
Corrective Action Required
03/10/2025
- No gauge or pressure test.
All Rough Inspection - Residential Passed 3/12/2025 3/12/2025 03/12/2025
Miscellaneous Correction
Resolved
03/12/2025
Exterior garage PFH sheathing and front porch truss tie downs passed and are okay to cover This is a partial pass only
Misc
Resolved
03/12/2025
- In pantry, fire block soffit at HVAC chase and garage wall - Floor joist hangers missing nails in great room - Minimum of 3 studs on exterior corners, basement South corner - No gauge on Gas line for inspection
Gas Service Inspection - Residential Passed 3/12/2025 3/12/2025 03/12/2025
Misc
Resolved
03/12/2025
- No gauge or pressure test.
Erosion Control Inspection Residential Failed 3/12/2025 03/12/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
03/10/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. - No pretection in back of lot.
Driveway Inspection Partial 4/24/2025 4/24/2025 04/24/2025
Misc
Informational
04/24/2025
4-24-25 DP. DW was formed, aggregate compacted, approved to pour
Sidewalk Inspection Partial 4/24/2025 4/24/2025 04/24/2025
Misc
Informational
04/24/2025
4-24-25 DP. SW on the right side facing house is formed, cross slopes in compliance, approved to pour. SW on the left side facing house is not formed up yet.
Erosion Control Inspection Residential Failed 5/15/2025 05/15/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
03/12/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. - Protect front of lot. - No pretection in back of lot.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
05/15/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Piers/Caissons Inspection - Residential Passed 5/21/2025 05/21/2025
Erosion Control Inspection Residential Partial 5/22/2025 05/22/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
05/22/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. - Protect front of lot. - No pretection in back of lot.
DCM3 ESC REQUIRED 2 DAY
Resolved
05/22/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Misc
Corrective Action Required
05/22/2025
- Erosion contrl in place at time of inspection.
Occupancy Inspection - Codes Residential Not Ready 5/22/2025 5/22/2025 05/22/2025
Misc
Corrective Action Required
05/22/2025
INSPECTION DENIDE NO ADDRESS POSTED
Occupancy Inspection - Codes Residential Failed 5/27/2025 5/27/2025 05/27/2025
Misc
Resolved
05/27/2025
INSPECTION DENIDE NO ADDRESS POSTED
Misc
Corrective Action Required
05/27/2025
- pending sidewalk and driveway inspections - Fire block closet under stairs basement in stud bays at side of stringers and landing - Cut off UFER or have above 6’8” - Uncover water meter for inspection - Final grading and sod - Remove spoils pile - Land sewer trace wire - Provide splash pads at down spouts - Sump discharge to be 36” away from foundation - No sidewalk installed at front of house
Erosion Control Inspection Residential Failed 5/27/2025 05/27/2025
Misc
Resolved
05/27/2025
- Erosion contrl in place at time of inspection.
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
05/27/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - No protection at spoils pile or back of lot.
Plot Plan Inspection Failed 5/27/2025 05/27/2025
Misc
Resolved
05/27/2025
- Remove spoils pile - Complete final grading and sod - Uncover water meter for inspection - Install sidwalk
Occupancy Inspection - Codes Residential Ready for Temp CO 5/28/2025 05/28/2025
Misc
Corrective Action Required
05/27/2025
- pending sidewalk and driveway inspections - Uncover water meter for inspection - Final grading and sod - Remove spoils pile - Land sewer trace wire - Provide splash pads at down spouts - Sump discharge to be 36” away from foundation - No sidewalk installed at front of house
Sidewalk Inspection Partial 5/30/2025 5/30/2025 05/30/2025
Misc
Informational
04/24/2025
4-24-25 DP. SW on the right side facing house is formed, cross slopes in compliance, approved to pour. SW on the left side facing house is not formed up yet. 5-30-25 DP. SW on east side of DW was formed, aggregate compacted, cross slopes in compliance, approved to pour.
Sidewalk Inspection Passed 6/6/2025 6/6/2025 06/06/2025
Misc
Informational
05/30/2025
4-24-25 DP. SW on the right side facing house is formed, cross slopes in compliance, approved to pour. SW on the left side facing house is not formed up yet. 5-30-25 DP. SW on east side of DW was formed, aggregate compacted, cross slopes in compliance, approved to pour. 6-6-25 DP. All SW has been poured, forms removed, cross slopes in compliance. Passed
Driveway Inspection Passed 6/6/2025 6/6/2025 06/06/2025
Misc
Informational
04/24/2025
4-24-25 DP. DW was formed, aggregate compacted, approved to pour 6-6-25 DP. DW was poured, forms have been removed, cross slopes in compliance. PASSED
Plot Plan Inspection Passed 6/27/2025 06/27/2025
Erosion Control Inspection Residential Failed 6/27/2025 06/27/2025
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
05/27/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - No protection at fron of lot.
Occupancy Inspection - Codes Residential Ready for Temp CO 6/30/2025 06/30/2025
Misc
Corrective Action Required
05/28/2025
- Final grading and sod - Land sewer trace wire - Provide splash pads at down spouts - Sump discharge to be 36” away from foundation
Misc
Corrective Action Required
06/30/2025
requesting extention Shawn Hoffman 06/30/2025 12:35 PM
Documents & Images
Date Uploaded File Type Document Name
11/27/2024 Application Form HM #182 - PERMIT APP
12/03/2024 Approved Plans APPROVED PLANS
12/03/2024 Plot Plan APPROVED PLOT PLAN
12/03/2024 Approved Plans APPROVED TRUSS LAYOUT
12/03/2024 Approved Plans APPROVED TRUSS PACKAGE
12/03/2024 Permit Codes Residential Plan Review
12/03/2024 Permit DS Building Permit
12/03/2024 Receipt Receipt for transaction:2024-009269
12/20/2024 2765 SW 11th St LSMO Footing Inspection 12-19-24
12/20/2024 Letter INSPECTION SUMMARY
12/20/2024 Letter INSPECTION SUMMARY
01/02/2025 Letter Stop Work Order
01/21/2025 Letter INSPECTION SUMMARY
01/22/2025 Letter INSPECTION SUMMARY
01/22/2025 Letter INSPECTION SUMMARY
01/22/2025 Letter INSPECTION SUMMARY
01/23/2025 Letter INSPECTION SUMMARY
01/23/2025 Letter INSPECTION SUMMARY
01/23/2025 Letter INSPECTION SUMMARY
02/25/2025 Letter INSPECTION SUMMARY
03/05/2025 HM #182 - PFH Strap Letter- Stamped
03/05/2025 182 Highland Meadows field issue- Connections- Stamped
03/10/2025 Letter INSPECTION SUMMARY
03/10/2025 Letter INSPECTION SUMMARY
03/10/2025 Letter INSPECTION SUMMARY
03/10/2025 Letter INSPECTION SUMMARY
03/12/2025 Letter INSPECTION SUMMARY
03/12/2025 Letter INSPECTION SUMMARY
03/12/2025 Letter INSPECTION SUMMARY
04/24/2025 Letter INSPECTION SUMMARY
04/24/2025 Letter INSPECTION SUMMARY
05/15/2025 Letter INSPECTION SUMMARY
05/21/2025 Letter INSPECTION SUMMARY
05/22/2025 Letter INSPECTION SUMMARY
05/22/2025 Letter INSPECTION SUMMARY
05/27/2025 Letter INSPECTION SUMMARY
05/27/2025 Letter INSPECTION SUMMARY
05/27/2025 Letter INSPECTION SUMMARY
05/28/2025 Receipt Receipt for transaction:2025-003907
05/28/2025 Certificate/License Codes Temporary Certificate of Occupancy
05/28/2025 Receipt Receipt for transaction:2025-003932
05/28/2025 Letter INSPECTION SUMMARY
05/30/2025 Letter INSPECTION SUMMARY
06/06/2025 Letter INSPECTION SUMMARY
06/06/2025 Letter INSPECTION SUMMARY
06/27/2025 Letter INSPECTION SUMMARY
06/27/2025 Letter INSPECTION SUMMARY
06/30/2025 Letter INSPECTION SUMMARY
06/30/2025 Certificate/License Codes Temporary Certificate of Occupancy
06/30/2025 Receipt Receipt for transaction:2025-005040
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home