NEW SINGLE FAMILY
NEW HOUSE. UNFINISHED BASEMENT. WALKOUT BASEMENT. ROOF TRUSSES. BILL'S PLUMBING PERFORMED THE PLUMBING WORK ON THIS HOUSE Brandon Kalwei 12/18/2025 3:20 PM
11/04/2024
11/07/2024
08/29/2025
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:10450 Holmes Rd Suite 100, Phone:(816) 246-6700  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
BILL'S PLUMBING SERVICE LLC, Address:308 E PARK STREET, Phone:(913) 829-8213  
BLAKE@SUMMITHOMESKC.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Water Tap Fee $3,973.00 $3,973.00 Paid 11/07/2024
Water Meter Fee $748.03 $748.03 Paid 11/07/2024
Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 11/07/2024
Right of Way Permit Fee $85.00 $85.00 Paid 11/07/2024
Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 11/07/2024
Valuation Fee New Single Family $2,139.34 $2,139.34 Paid 11/07/2024
Not Ready Inspection Fee $75.00 $75.00 Paid 05/15/2025
Not Ready Inspection Fee $75.00 $75.00 Paid 05/15/2025
Temporary Occupancy Fee $50.00 $50.00 Paid 05/15/2025
Temporary Occupancy Fee $50.00 $50.00 Paid 06/06/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Piers/Caissons Inspection - Residential Partial 12/5/2024 12/05/2024
Misc
Informational
12/04/2024
PIER PADS INSPECTED BY THIRD PARTY
Footing Inspection - Residential Passed 12/5/2024 12/05/2024
Misc
Corrective Action Required
12/05/2024
Third party inspection on file
Underslab Plumbing Inspection - Residential Passed 12/23/2024 12/23/2024 12/23/2024
Sewer Service Inspection - R Passed 1/3/2025 01/03/2025
Water Service Inspection - R Partial 1/3/2025 01/03/2025
Misc
Corrective Action Required
01/03/2025
- Partial, poly out of foundation 20 foot
Water Service Inspection - R Passed 1/16/2025 1/16/2025 01/16/2025
Misc
Resolved
01/16/2025
- Partial, poly out of foundation 20 foot
All Rough Inspection - Residential Failed 2/12/2025 2/12/2025 02/12/2025
Misc
Corrective Action Required
02/12/2025
PORTAL FRAME INSPECTION - Missing LUS24 hangers on porch trusses - CSPF at dinning room approved - PFH at garage approved
Erosion Control Inspection Residential Partial 2/12/2025 02/12/2025
Misc
Corrective Action Required
02/12/2025
Erosion control in place at time of inspection.
All Rough Inspection - Residential Failed 2/28/2025 2/28/2025 02/28/2025
Misc
Corrective Action Required
02/12/2025
PORTAL FRAME INSPECTION - Missing LUS24 hangers on porch trusses - CSPF at dinning room approved - PFH at garage approved
Misc
Corrective Action Required
02/28/2025
INSPECTION DENIED, PROVIDE COMPLETE SET OF CITY STAMPED PLANS ON SITE FOR INSPECTION. (INCLUDING TRUSS PLANS)
Gas Service Inspection - Residential Passed 2/28/2025 2/28/2025 02/28/2025
Electrical Service Inspection Passed 2/28/2025 2/28/2025 02/28/2025
Erosion Control Inspection Residential Failed 2/28/2025 02/28/2025
Misc
Resolved
02/28/2025
Erosion control in place at time of inspection.
Misc
Corrective Action Required
02/28/2025
ENSURE EROSION CONTROL IS RE-ESTABLISED BEFORE RE-INSECTION.
All Rough Inspection - Residential Failed 3/4/2025 3/4/2025 03/04/2025
Misc
Resolved
03/04/2025
PORTAL FRAME INSPECTION - Missing LUS24 hangers on porch trusses - CSPF at dinning room approved - PFH at garage approved
Misc
Resolved
03/04/2025
INSPECTION DENIED, PROVIDE COMPLETE SET OF CITY STAMPED PLANS ON SITE FOR INSPECTION. (INCLUDING TRUSS PLANS)
Misc
Corrective Action Required
03/04/2025
- Complete truss repair per manufacturer,
All Rough Inspection - Residential Not Ready 3/6/2025 3/6/2025 03/06/2025
Misc
Corrective Action Required
03/04/2025
- Complete truss repair per manufacturer,
Misc
Corrective Action Required
03/06/2025
- Shawn Hoffman 03/06/2025 8:19 AM 9NOT DONE0
All Rough Inspection - Residential Passed 3/7/2025 3/7/2025 03/07/2025
Misc
Resolved
03/07/2025
- Complete truss repair per manufacturer,
Misc
Resolved
03/07/2025
- Shawn Hoffman 03/06/2025 8:19 AM 9NOT DONE0
Driveway Inspection Partial 4/24/2025 4/24/2025 04/24/2025
Misc
Informational
04/24/2025
4-24-25 DP. DW was formed, aggregate compacted, approved to pour
Sidewalk Inspection Partial 4/24/2025 4/24/2025 04/24/2025
Misc
Informational
04/24/2025
4-24-25 DP. SW was formed, aggregate compacted, there is a small wet spot on the south side, so the crew is putting a header and going to pour what is good.
Piers/Caissons Inspection - Residential Passed 5/7/2025 5/7/2025 05/07/2025
Misc
Informational
12/05/2024
PIER PADS INSPECTED BY THIRD PARTY
Misc
Informational
05/07/2025
Piers already in place, A 6” thick cap added to bring above grade
Plot Plan Inspection Passed 5/8/2025 05/08/2025
Erosion Control Inspection Residential Partial 5/8/2025 05/08/2025
Misc
Resolved
05/08/2025
ENSURE EROSION CONTROL IS RE-ESTABLISED BEFORE RE-INSECTION.
Misc
Corrective Action Required
05/08/2025
Erosion control in place
Occupancy Inspection - Codes Residential Not Ready 5/8/2025 5/8/2025 05/08/2025
Misc
Corrective Action Required
05/08/2025
INSPECTION DENIDE - DECK HALF BUILT - MISSING SIDEWALK PANELS
Sidewalk Inspection Partial 5/8/2025 05/08/2025
Misc
Informational
04/24/2025
4-24-25 DP. SW was formed, aggregate compacted, there is a small wet spot on the south side, so the crew is putting a header and going to pour what is good. 5-8-25 DP. The rest of the SW is ready to pour.
Erosion Control Inspection Residential Partial 5/12/2025 05/12/2025
Misc
Corrective Action Required
05/08/2025
Erosion control in place
Occupancy Inspection - Codes Residential Failed 5/12/2025 5/12/2025 05/12/2025
Misc
Resolved
05/12/2025
INSPECTION DENIDE - DECK HALF BUILT - MISSING SIDEWALK PANELS
Misc
Corrective Action Required
05/12/2025
- Sidewalk and driveway inspection pending - Provide splash pads - Pay all fees - Final grading and sod - Land sewer trace wire at grade Provide splash - Provide landing at bottom of deck stairs - Sump discharge to be 36” away from foundation
Occupancy Inspection - Codes Residential Ready for Temp CO 5/14/2025 5/14/2025 05/14/2025
Misc
Corrective Action Required
05/12/2025
- Sidewalk and driveway inspection pending - Provide splash pads - Pay all fees - Final grading and sod - Land sewer trace wire at grade Provide splash - Sump discharge to be 36” away from foundation
Sidewalk Inspection Partial 5/16/2025 5/16/2025 05/15/2025
Misc
Informational
05/08/2025
4-24-25 DP. SW was formed, aggregate compacted, there is a small wet spot on the south side, so the crew is putting a header and going to pour what is good. 5-8-25 DP. The rest of the SW is ready to pour. 5-15-25 DP. SW is poured, cross slopes are in compliance but can not pass until forms are removed.
Driveway Inspection Passed 5/16/2025 5/16/2025 05/16/2025
Misc
Informational
04/24/2025
4-24-25 DP. DW was formed, aggregate compacted, approved to pour 5-16-25 DP. DW is poured, cross slopes in compliance. Passed
Sidewalk Inspection Partial 5/16/2025 5/16/2025 05/16/2025
Misc
Informational
05/15/2025
4-24-25 DP. SW was formed, aggregate compacted, there is a small wet spot on the south side, so the crew is putting a header and going to pour what is good. 5-8-25 DP. The rest of the SW is ready to pour. 5-15-25 DP. SW is poured, cross slopes are in compliance but can not pass until forms are removed. 5-16-25 DP. SW has been poured, forms have been removed. Can not pass Sidewalk until SW is cleaned off, curb line is clean and erosion control is put back in place.
Occupancy Inspection - Codes Residential Ready for Temp CO 6/6/2025 6/6/2025 06/06/2025
Misc
Corrective Action Required
05/14/2025
- Sidewalk and driveway inspection pending - Provide splash pads - Pay all fees - Final grading and sod - Land sewer trace wire at grade Provide splash - Sump discharge to be 36” away from foundation
Misc
Informational
06/06/2025
Extension approved Shawn Hoffman 06/06/2025 8:20 AM pay fee
Sidewalk Inspection Passed 7/16/2025 7/16/2025 07/16/2025
Misc
Informational
05/16/2025
4-24-25 DP. SW was formed, aggregate compacted, there is a small wet spot on the south side, so the crew is putting a header and going to pour what is good. 5-8-25 DP. The rest of the SW is ready to pour. 5-15-25 DP. SW is poured, cross slopes are in compliance but can not pass until forms are removed. 5-16-25 DP. SW has been poured, forms have been removed. Can not pass Sidewalk until SW is cleaned off, curb line is clean and erosion control is put back in place. 07/16/25 Jamie S, SW is in compliance with city standards.
Erosion Control Inspection Residential Failed 7/30/2025 7/30/2025 07/30/2025
Misc
Corrective Action Required
05/12/2025
Erosion control in place
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/30/2025
07/30/25 Jamie S, Erosion control needs to be reestablished. Storm drain need to be cleaned. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Partial 8/4/2025 8/4/2025 08/04/2025
Misc
Corrective Action Required
07/30/2025
Erosion control in place
DCM3 ESC REQUIRED 2 DAY
Resolved
08/04/2025
07/30/25 Jamie S, Erosion control needs to be reestablished. Storm drain need to be cleaned. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 08/04/25 Jamie S, Erosion Control has been reestablished.
Erosion Control Inspection Residential Failed 8/6/2025 8/6/2025 08/06/2025
Misc
Corrective Action Required
08/04/2025
Erosion control in place
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/06/2025
8/6/25 Tyler S. SW has dirt and debris on it. Curb line and street need to be cleaned.EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Partial 8/8/2025 8/8/2025 08/08/2025
Misc
Corrective Action Required
08/06/2025
Erosion control in place
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/06/2025
8/6/25 Tyler S. SW has dirt and debris on it. Curb line and street need to be cleaned.EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 8-8-25 Dustin A, SW has been cleaned as well as street, Laying sod today
Erosion Control Inspection Residential Passed 8/21/2025 08/21/2025
Misc
Resolved
08/21/2025
Erosion control in place
DCM3 ESC REQUIRED 2 DAY
Resolved
08/21/2025
8/6/25 Tyler S. SW has dirt and debris on it. Curb line and street need to be cleaned.EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 8-8-25 Dustin A, SW has been cleaned as well as street, Laying sod today
Occupancy Inspection - Codes Residential Failed 8/21/2025 8/21/2025 08/21/2025
Misc
Corrective Action Required
06/06/2025
- Provide splash pads - Pay all fees ( irrigation permit) - Land sewer trace wire at grade Provide splash - Sump discharge to be 36” away from foundation
Misc
Resolved
08/21/2025
Extension approved Shawn Hoffman 06/06/2025 8:20 AM pay fee
Occupancy Inspection - Codes Residential Failed 8/22/2025 8/22/2025 08/22/2025
Misc
Corrective Action Required
08/21/2025
- Pay all fees ( irrigation permit)
Occupancy Inspection - Codes Residential Full C of O 8/29/2025 8/29/2025 08/29/2025
Misc
Resolved
08/29/2025
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home

*PLEASE NOTE - You must be logged in with your registered user account to view any documents related to your permit