Permit Application Status

PRRES20245318


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20245318
Building Permit - Residential
Temporary Occupancy
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - ROOF TRUSSES
10/08/2024
10/11/2024
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
BRUCER@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 10/11/2024
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 10/11/2024
7232302-Residential License Tax Fee $1,022.72 $1,022.72 Paid 10/11/2024
8331401-Water Tap Fee $3,973.00 $3,973.00 Paid 10/11/2024
8350015-Water Meter Fee $748.03 $748.03 Paid 10/11/2024
9110078-Valuation Fee New Single Family $1,733.45 $1,733.45 Paid 10/11/2024
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 04/02/2025
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 05/02/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sidewalk Inspection Pending
Misc
Informational
03/25/2025
2-28-25 DP. PARTIAL SIDEWALK FORMED. the Sidewalk west of the DW was formed, aggregate compacted, approved to pour. 3-25-25 DP. SW on east side of DW was never called in for a pre pour inspection. However, on west side, there is a tripping hazard where SW meets up to existing.
Plot Plan Inspection Pending
Misc
Corrective Action Required
03/27/2025
- CORRECT GRADING AND PROVIDE A AS GRADED PLOT PLAN
Erosion Control Inspection Residential Pending
Misc
Corrective Action Required
03/27/2025
Erosion control in compliance
Occupancy Inspection - Codes Residential Pending
Misc
Corrective Action Required
05/02/2025
- provide gutters and downspouts - - Final grading and sod - Land sewer trace wire to grade - Sump discharge to be 36” from foundation - Seal top of A/C disconnect Label - Provide proper drainage of grade at basement window well behind single bay garage - Pending sidewalk inspection
Footing Inspection - Residential Passed 11/14/2024 11/14/2024
Misc
Corrective Action Required
11/14/2024
INSPECTION PERFORMED BY THIRD PARTY
Water Service Inspection - R Passed 11/22/2024 11/22/2024 11/22/2024
Sewer Service Inspection - R Passed 11/25/2024 11/25/2024 11/25/2024
Erosion Control Inspection Residential Partial 11/25/2024 11/25/2024
Misc
Corrective Action Required
11/25/2024
Erosion control in compliance
Erosion Control Inspection Residential Failed 11/26/2024 11/26/2024 11/26/2024
Misc
Corrective Action Required
11/25/2024
Erosion control in compliance
Miscellaneous Correction
Corrective Action Required
11/26/2024
11-26-24 DP. Silt fence and waddles installed are in working order and appreciated. We need to add a gutter buddy at the storm inlet in font of this property, ASAP. We have rain coming tomorrow. Also, the concrete wash outs are over flowing and need replaced with fresh wash out areas. If you need further info on details for installing a gutter buddy please reach out to 816-969-1219. Thanks.
Erosion Control Inspection Residential Partial 12/3/2024 12/03/2024
Misc
Corrective Action Required
11/26/2024
Erosion control in compliance
Miscellaneous Correction
Resolved
12/03/2024
11-26-24 DP. Silt fence and waddles installed are in working order and appreciated. We need to add a gutter buddy at the storm inlet in font of this property, ASAP. We have rain coming tomorrow. Also, the concrete wash outs are over flowing and need replaced with fresh wash out areas. If you need further info on details for installing a gutter buddy please reach out to 816-969-1219. Thanks.
Underslab Plumbing Inspection - Residential Passed 12/3/2024 12/3/2024 12/03/2024
All Rough Inspection - Residential Failed 1/2/2025 1/2/2025 01/02/2025
Misc
Corrective Action Required
01/02/2025
- Covered porch approved - Portal frame, 2 rows 3" O.C. required on studs up to header
Erosion Control Inspection Residential Partial 1/2/2025 01/02/2025
Misc
Corrective Action Required
12/03/2024
Erosion control in compliance
All Rough Inspection - Residential Failed 1/28/2025 1/28/2025 01/28/2025
Misc
Corrective Action Required
01/02/2025
- Covered porch approved - Portal frame, Approved
Misc
Corrective Action Required
01/28/2025
- Add hanger on joist in kitchen - Strap top plate were over bored for DWV in dining/ great room - Security block front door - Provide roof boots on DWV - Nail off triple girder truss in front bedroom
Gas Service Inspection - Residential Passed 1/28/2025 1/28/2025 01/28/2025
Electrical Service Inspection Passed 1/28/2025 1/28/2025 01/28/2025
Erosion Control Inspection Residential Partial 1/28/2025 01/28/2025
Misc
Corrective Action Required
01/02/2025
Erosion control in compliance
All Rough Inspection - Residential Failed 1/30/2025 1/30/2025 01/30/2025
Misc
Resolved
01/30/2025
- Covered porch approved - Portal frame, Approved
Misc
Corrective Action Required
01/28/2025
- Strap top plate were over bored for DWV in dining/ great room OK TO INSULATE
All Rough Inspection - Residential Passed 1/31/2025 1/31/2025 01/31/2025
Misc
Resolved
01/31/2025
Driveway Inspection Partial 2/25/2025 2/25/2025 02/25/2025
Misc
Informational
02/25/2025
2-25-25 DP. Crew had dw formed, aggregate compacted. Told contractor to keep cross slope though out approach with sidewalk not formed up yet. Approved to pour.
Sidewalk Inspection Partial 2/28/2025 2/28/2025 02/28/2025
Misc
Informational
02/28/2025
2-28-25 DP. PARTIAL SIDEWALK FORMED. the Sidewalk west of the DW was formed, aggregate compacted, approved to pour.
Driveway Inspection Passed 3/25/2025 3/25/2025 03/25/2025
Misc
Informational
02/25/2025
2-25-25 DP. Crew had dw formed, aggregate compacted. Told contractor to keep cross slope though out approach with sidewalk not formed up yet. Approved to pour. 3-25-25 DP. DW was poured, forms removed and cross slopes are in compliance. Passed
Sidewalk Inspection Failed 3/25/2025 3/25/2025 03/25/2025
Misc
Informational
02/28/2025
2-28-25 DP. PARTIAL SIDEWALK FORMED. the Sidewalk west of the DW was formed, aggregate compacted, approved to pour. 3-25-25 DP. SW on east side of DW was never called in for a pre pour inspection. However, on west side, there is a tripping hazard where SW meets up to existing.
Plot Plan Inspection Failed 3/27/2025 03/27/2025
Misc
Corrective Action Required
03/27/2025
- CORRECT GRADING AND PROVIDE A AS GRADED PLOT PLAN
Occupancy Inspection - Codes Residential Failed 3/27/2025 3/27/2025 03/27/2025
Misc
Corrective Action Required
03/27/2025
- provide gutters and downspouts - Remove toilet from sidewalk - Provide GCFI protection for dishwasher - Bottom rise of basement stairs over 7 3/4” inside height - Provide security screws on all exterior doors - Final grading and sod - Land sewer trace wire to grade - Sump discharge to be 36” from foundation - Seal top of A/C disconnect Label - Provide proper drainage of grade at basement window well behind single bay garage - Pending sidewalk inspection
Erosion Control Inspection Residential Partial 3/27/2025 03/27/2025
Misc
Corrective Action Required
01/28/2025
Erosion control in compliance
Occupancy Inspection - Codes Residential Failed 3/31/2025 3/31/2025 03/31/2025
Misc
Corrective Action Required
03/27/2025
- provide gutters and downspouts - Provide GCFI protection for dishwasher - - Final grading and sod - Land sewer trace wire to grade - Sump discharge to be 36” from foundation - Seal top of A/C disconnect Label - Provide proper drainage of grade at basement window well behind single bay garage - Pending sidewalk inspection
Occupancy Inspection - Codes Residential Ready for Temp CO 4/1/2025 4/1/2025 04/01/2025
Misc
Corrective Action Required
03/31/2025
- provide gutters and downspouts - - Final grading and sod - Land sewer trace wire to grade - Sump discharge to be 36” from foundation - Seal top of A/C disconnect Label - Provide proper drainage of grade at basement window well behind single bay garage - Pending sidewalk inspection
Occupancy Inspection - Codes Residential Ready for Temp CO 5/2/2025 05/02/2025
Misc
Corrective Action Required
04/01/2025
- provide gutters and downspouts - - Final grading and sod - Land sewer trace wire to grade - Sump discharge to be 36” from foundation - Seal top of A/C disconnect Label - Provide proper drainage of grade at basement window well behind single bay garage - Pending sidewalk inspection
Documents & Images
Date Uploaded File Type Document Name
10/08/2024 Application Form HM #209 - PERMIT APP
10/11/2024 Permit Codes Residential Plan Review
10/11/2024 Approved Plans APPROVED PLANS
10/11/2024 Plot Plan APPROVED PLOT PLAN
10/11/2024 Approved Plans APPROVED TRUSS LAYOUT
10/11/2024 Approved Plans APPROVED TRUSS PACKAGE
10/11/2024 Permit DS Building Permit
10/11/2024 Receipt Receipt for transaction:2024-008270
11/14/2024 M L Crose 2750 SW 11th Terr LSMO Footing Inspection Report 11-12-24
11/14/2024 Letter INSPECTION SUMMARY
11/22/2024 Letter INSPECTION SUMMARY
11/25/2024 Letter INSPECTION SUMMARY
11/25/2024 Letter INSPECTION SUMMARY
11/26/2024 Letter INSPECTION SUMMARY
12/03/2024 Letter INSPECTION SUMMARY
12/03/2024 Letter INSPECTION SUMMARY
01/02/2025 Letter INSPECTION SUMMARY
01/02/2025 Letter INSPECTION SUMMARY
01/07/2025 Approved Plans APPROVED TRUSS PACKAGE
01/28/2025 Letter INSPECTION SUMMARY
01/28/2025 Letter INSPECTION SUMMARY
01/28/2025 Letter INSPECTION SUMMARY
01/28/2025 Letter INSPECTION SUMMARY
01/28/2025 Engineer Report/Study ENGINEER BEAM SWITCH LETTER
01/30/2025 Letter INSPECTION SUMMARY
01/31/2025 Letter INSPECTION SUMMARY
02/25/2025 Letter INSPECTION SUMMARY
02/28/2025 Letter INSPECTION SUMMARY
03/25/2025 Letter INSPECTION SUMMARY
03/25/2025 Letter INSPECTION SUMMARY
03/27/2025 Letter INSPECTION SUMMARY
03/27/2025 Letter INSPECTION SUMMARY
03/27/2025 Letter INSPECTION SUMMARY
03/31/2025 Letter INSPECTION SUMMARY
04/01/2025 Letter INSPECTION SUMMARY
04/02/2025 Certificate/License Codes Temporary Certificate of Occupancy
04/02/2025 Receipt Receipt for transaction:2025-001960
04/23/2025 Application Form TCO EXTENSION
05/02/2025 Letter INSPECTION SUMMARY
05/02/2025 Certificate/License Codes Temporary Certificate of Occupancy
05/02/2025 Receipt Receipt for transaction:2025-002785
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home