Summary
PRRES20244370
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - ROOF TRUSSES
08/19/2024
08/29/2024
02/17/2025
05/05/2025
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
BRUCER@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 08/29/2024
Right of Way Permit Fee $85.00 $85.00 Paid 08/29/2024
Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 08/29/2024
Water Tap Fee $3,973.00 $3,973.00 Paid 08/29/2024
Water Meter Fee $748.03 $748.03 Paid 08/29/2024
Valuation Fee New Single Family $1,784.38 $1,784.38 Paid 08/29/2024
Not Ready Inspection Fee $75.00 $75.00 Paid 03/26/2025
Temporary Occupancy Fee $50.00 $50.00 Paid 03/27/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Residential Failed 10/14/2024 10/14/2024
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
10/14/2024
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED.
Sewer Service Inspection - R Passed 10/14/2024 10/14/2024 10/14/2024
Footing Inspection - Residential Failed 10/14/2024 10/14/2024
Misc
Corrective Action Required
10/14/2024
Third party inspector uploaded wrong document
Water Service Inspection - R Passed 10/15/2024 10/15/2024 10/15/2024
Footing Inspection - Residential Passed 10/16/2024 10/16/2024
Misc
Corrective Action Required
10/14/2024
Inspection by third party inspector
Underslab Plumbing Inspection - Residential Passed 10/23/2024 10/23/2024 10/23/2024
Erosion Control Inspection Residential Partial 10/23/2024 10/23/2024
DCM6 ESC INSP DENIED STREET CLEAN UP
Resolved
10/23/2024
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED.
Misc
Corrective Action Required
10/23/2024
- Erosion control in compliance at time of inspection.
Erosion Control Inspection Residential Failed 11/1/2024 11/01/2024
Misc
Resolved
11/01/2024
- Erosion control in compliance at time of inspection.
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
11/01/2024
STREET CLEAN UP REQUIRED IMMEDIATELY.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
11/01/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Partial 11/13/2024 11/13/2024
DCM6 ESC INSP DENIED STREET CLEAN UP
Resolved
11/13/2024
STREET CLEAN UP REQUIRED IMMEDIATELY.
DCM3 ESC REQUIRED 2 DAY
Resolved
11/13/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Misc
Corrective Action Required
11/13/2024
OK AT TIME OF INSPECTION
All Rough Inspection - Residential Failed 12/23/2024 12/23/2024 12/23/2024
Misc
Corrective Action Required
12/23/2024
- Straps at portal frame is to extend below the header no less than 12” - Fire block top of chase at back of garage - Fire block 1 1/2” gap at top in soffit garage/ foyer wall - Rework attic access in soffit at double door garage to make useable - LVL over pantry short, is to have triple stud pack( nail off stud pack) - Land electrical at kitchen - Fire block penetrations top and bottom at foyer - Sub floor at primary bedroom closet not full span - Tighten hold down at stairs to foundation wall - Complete bracing on trusses - Nail siding at sill plate at egress well
Electrical Service Inspection Passed 12/23/2024 12/23/2024 12/23/2024
Gas Service Inspection - Residential Passed 12/23/2024 12/23/2024 12/23/2024
Erosion Control Inspection Residential Partial 12/23/2024 12/23/2024
Misc
Corrective Action Required
11/13/2024
OK AT TIME OF INSPECTION
All Rough Inspection - Residential Passed 12/30/2024 12/30/2024 12/30/2024
Misc
Resolved
12/30/2024
- Straps at portal frame is to extend below the header no less than 12” - Fire block top of chase at back of garage - Fire block 1 1/2” gap at top in soffit garage/ foyer wall - Rework attic access in soffit at double door garage to make useable - LVL over pantry short, is to have triple stud pack( nail off stud pack) - Land electrical at kitchen - Fire block penetrations top and bottom at foyer - Sub floor at primary bedroom closet not full span - Tighten hold down at stairs to foundation wall - Complete bracing on trusses - Nail siding at sill plate at egress well
Erosion Control Inspection Residential Partial 12/30/2024 12/30/2024
Misc
Corrective Action Required
12/23/2024
OK AT TIME OF INSPECTION
Driveway Inspection Partial 2/28/2025 2/28/2025 02/28/2025
Misc
Informational
02/28/2025
2-28-25 DP. DW was formed, aggregate compacted, told to keep cross slopes in compliance throughout the approach for the width of the sw. Approved to pour.
Sidewalk Inspection Partial 2/28/2025 2/28/2025 02/28/2025
Misc
Informational
02/28/2025
2-28-25 DP. PARTIAL SW INSPECTION. SW on the East side of the DW approach was formed, aggregate compacted while I was onsite, cross slopes were in compliance. Approved to pour.
Erosion Control Inspection Residential Failed 3/6/2025 03/06/2025
Misc
Resolved
03/06/2025
OK AT TIME OF INSPECTION
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
03/06/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Occupancy Inspection - Codes Residential Failed 3/5/2025 3/6/2025 03/06/2025
Misc
Corrective Action Required
03/06/2025
INSPECTION DENIDE, EROSION CONTROL NOT IN COMPLIENCE. NOT READY
Erosion Control Inspection Residential Partial 3/11/2025 03/11/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
03/11/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Misc
Corrective Action Required
03/11/2025
- Erosion control in place at time of inspection.
Plot Plan Inspection Passed 3/11/2025 03/11/2025
Occupancy Inspection - Codes Residential Failed 3/11/2025 3/11/2025 03/11/2025
Misc
Resolved
03/11/2025
INSPECTION DENIDE, EROSION CONTROL NOT IN COMPLIENCE. NOT READY
Misc
Corrective Action Required
03/11/2025
- Pull forms and call in inspection on driveway - Complete sidewalk - Lower water valves to grade - Final grading and sod - Install sidewalk and have inspections done - Driveway inspection pending - Provide splash pads - Sump discharge to be 36” away from foundation - No exit access from back sliding door - water meter pit lid to be at grade with meter 14-18" below lid with at least 2" of gravel in bottem
Occupancy Inspection - Codes Residential Not Ready 3/13/2025 3/13/2025 03/13/2025
Misc
Corrective Action Required
03/13/2025
- Pull forms and call in inspection on driveway - Complete sidewalk - Lower water valves to grade - Final grading and sod - Install sidewalk and have inspections done - Driveway inspection pending - Provide splash pads - Sump discharge to be 36” away from foundation - No exit access from back sliding door - water meter pit lid to be at grade with meter 14-18" below lid with at least 2" of gravel in bottem
Misc
Corrective Action Required
03/13/2025
NO CHANGE NOT READY
Sidewalk Inspection Partial 3/18/2025 03/18/2025
Misc
Informational
02/28/2025
2-28-25 DP. PARTIAL SW INSPECTION. SW on the East side of the DW approach was formed, aggregate compacted while I was onsite, cross slopes were in compliance. Approved to pour. 3-18-25 DP. SW between 1042 and 1046 was formed, aggregate compacted, cross slopes in compliance but conditions can change. There is a valve risers that is high and right on the edge of the SW. The bottom of the top hat will be in the SW so contractor is cutting the riser down to grade to avoid further hassle. When coming to final, make sure valve was lowered. Approved to pour.
Driveway Inspection Passed 3/25/2025 3/25/2025 03/25/2025
Misc
Informational
02/28/2025
2-28-25 DP. DW was formed, aggregate compacted, told to keep cross slopes in compliance throughout the approach for the width of the sw. Approved to pour. 3-25-25 DP. DW was poured, forms removed. Cross slopes in compliance. Passed
Sidewalk Inspection Failed 3/25/2025 3/25/2025 03/25/2025
Misc
Informational
03/18/2025
2-28-25 DP. PARTIAL SW INSPECTION. SW on the East side of the DW approach was formed, aggregate compacted while I was onsite, cross slopes were in compliance. Approved to pour. 3-18-25 DP. SW between 1042 and 1046 was formed, aggregate compacted, cross slopes in compliance but conditions can change. There is a valve risers that is high and right on the edge of the SW. The bottom of the top hat will be in the SW so contractor is cutting the riser down to grade to avoid further hassle. When coming to final, make sure valve was lowered. Approved to pour. 3-25-25 DP. SW has been poured, forms have been removed. They panel on the east side of the property that meets up to the ADA ramp has a trip hazard. That single panel needs to be removed and the trip hazard needs to be fixed.
Erosion Control Inspection Residential Passed 3/25/2025 03/25/2025
Misc
Corrective Action Required
03/11/2025
- Erosion control in place at time of inspection.
Occupancy Inspection - Codes Residential Failed 3/25/2025 3/25/2025 03/25/2025
Misc
Corrective Action Required
03/13/2025
- Obtain an irrigation permit - Pay all outstanding fees - Call in inspection for driveway and sidewalk - Lower water valves to grade - Final grading and sod - Driveway inspection pending - Provide splash pads - Sump discharge to be 36” away from foundation - Land sewer trace wire at grade - water meter pit lid to be at grade with meter 14-18" below lid with at least 2" of gravel in bottem
Misc
Resolved
03/25/2025
NO CHANGE NOT READY
Occupancy Inspection - Codes Residential Ready for Temp CO 3/26/2025 3/26/2025 03/26/2025
Misc
Corrective Action Required
03/25/2025
- Obtain an irrigation permit - Pay all outstanding fees - Call in inspection for driveway and sidewalk - Lower water valves to grade - Final grading and sod - Driveway inspection pending - Provide splash pads - Sump discharge to be 36” away from foundation - Land sewer trace wire at grade - water meter pit lid to be at grade with meter 14-18" below lid with at least 2" of gravel in bottem
Sidewalk Inspection Partial 3/27/2025 3/27/2025 03/27/2025
Misc
Informational
03/25/2025
2-28-25 DP. PARTIAL SW INSPECTION. SW on the East side of the DW approach was formed, aggregate compacted while I was onsite, cross slopes were in compliance. Approved to pour. 3-18-25 DP. SW between 1042 and 1046 was formed, aggregate compacted, cross slopes in compliance but conditions can change. There is a valve risers that is high and right on the edge of the SW. The bottom of the top hat will be in the SW so contractor is cutting the riser down to grade to avoid further hassle. When coming to final, make sure valve was lowered. Approved to pour. 3-25-25 DP. SW has been poured, forms have been removed. They panel on the east side of the property that meets up to the ADA ramp has a trip hazard. That single panel needs to be removed and the trip hazard needs to be fixed.
Sidewalk Inspection Failed 4/25/2025 4/25/2025 04/25/2025
Misc
Informational
03/27/2025
2-28-25 DP. PARTIAL SW INSPECTION. SW on the East side of the DW approach was formed, aggregate compacted while I was onsite, cross slopes were in compliance. Approved to pour. 3-18-25 DP. SW between 1042 and 1046 was formed, aggregate compacted, cross slopes in compliance but conditions can change. There is a valve risers that is high and right on the edge of the SW. The bottom of the top hat will be in the SW so contractor is cutting the riser down to grade to avoid further hassle. When coming to final, make sure valve was lowered. Approved to pour. 3-25-25 DP. SW has been poured, forms have been removed. They panel on the east side of the property that meets up to the ADA ramp has a trip hazard. That single panel needs to be removed and the trip hazard needs to be fixed. 4-25-25 DP. Trip hazard still isn't fixed
Occupancy Inspection - Codes Residential Failed 4/29/2025 4/30/2025 04/30/2025
Misc
Corrective Action Required
03/26/2025
- Sidewalk inspection Pending
Sidewalk Inspection Passed 4/30/2025 4/30/2025 04/30/2025
Misc
Informational
04/25/2025
2-28-25 DP. PARTIAL SW INSPECTION. SW on the East side of the DW approach was formed, aggregate compacted while I was onsite, cross slopes were in compliance. Approved to pour. 3-18-25 DP. SW between 1042 and 1046 was formed, aggregate compacted, cross slopes in compliance but conditions can change. There is a valve risers that is high and right on the edge of the SW. The bottom of the top hat will be in the SW so contractor is cutting the riser down to grade to avoid further hassle. When coming to final, make sure valve was lowered. Approved to pour. 3-25-25 DP. SW has been poured, forms have been removed. They panel on the east side of the property that meets up to the ADA ramp has a trip hazard. That single panel needs to be removed and the trip hazard needs to be fixed. 4-25-25 DP. Trip hazard still isn't fixed 4-30 Trip hazard is fixed. Passed
Occupancy Inspection - Codes Residential Full C of O 5/5/2025 5/5/2025 05/05/2025
Misc
Resolved
05/05/2025
- Sidewalk inspection Pending
Documents & Images
Date Uploaded File Type Document Name
08/19/2024 Application Form HM #192 - PERMIT APP
08/21/2024 Permit Codes Residential Plan Review
08/21/2024 Approved Plans APPROVED PLANS
08/21/2024 Approved Plans APPROVED TRUSS LAYOUT
08/21/2024 Approved Plans APPROVED TRUSS PACKAGE
08/29/2024 Permit Codes Residential Plan Review
08/29/2024 Plot Plan APPROVED PLOT PLAN
08/29/2024 Permit DS Building Permit
08/29/2024 Receipt Receipt for transaction:2024-007327
08/29/2024 Approved Plans APPROVED TRUSS PACKAGE
09/09/2024 Approved Plans approved revised truss layout
10/05/2024 M L Crose 1042 SW Fiord Dr LSMO Highland Meadows Lot 192 LSMO 3rd Party Footing Inspection Report 10-4-24
10/14/2024 Letter INSPECTION SUMMARY
10/14/2024 Letter INSPECTION SUMMARY
10/14/2024 Letter INSPECTION SUMMARY
10/15/2024 M L Crose 1042 SW Fiord Dr LSMO Highland Meadows Lot 192 LSMO 3rd Party Footing Inspection Report Revised 10-15-24
10/15/2024 Letter INSPECTION SUMMARY
10/16/2024 Letter INSPECTION SUMMARY
10/23/2024 Letter INSPECTION SUMMARY
10/23/2024 Letter INSPECTION SUMMARY
11/01/2024 Letter INSPECTION SUMMARY
11/13/2024 Letter INSPECTION SUMMARY
12/23/2024 Letter INSPECTION SUMMARY
12/23/2024 Letter INSPECTION SUMMARY
12/23/2024 Letter INSPECTION SUMMARY
12/23/2024 Letter INSPECTION SUMMARY
12/30/2024 Letter INSPECTION SUMMARY
12/30/2024 Letter INSPECTION SUMMARY
02/28/2025 Letter INSPECTION SUMMARY
02/28/2025 Letter INSPECTION SUMMARY
03/06/2025 Letter INSPECTION SUMMARY
03/06/2025 Letter INSPECTION SUMMARY
03/11/2025 Letter INSPECTION SUMMARY
03/11/2025 Letter INSPECTION SUMMARY
03/11/2025 Letter INSPECTION SUMMARY
03/13/2025 Letter INSPECTION SUMMARY
03/18/2025 Letter INSPECTION SUMMARY
03/25/2025 Letter INSPECTION SUMMARY
03/25/2025 Letter INSPECTION SUMMARY
03/25/2025 Letter INSPECTION SUMMARY
03/26/2025 Receipt Receipt for transaction:2025-001799
03/26/2025 Letter INSPECTION SUMMARY
03/26/2025 Letter INSPECTION SUMMARY
03/27/2025 Certificate/License Codes Temporary Certificate of Occupancy
03/27/2025 Receipt Receipt for transaction:2025-001842
03/27/2025 Letter INSPECTION SUMMARY
04/25/2025 Letter INSPECTION SUMMARY
04/30/2025 Letter INSPECTION SUMMARY
04/30/2025 Letter INSPECTION SUMMARY
05/05/2025 Letter Codes Final Certificate of Occupancy
05/05/2025 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home