Permit Application Status

PRRES20234497


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20234497
Building Permit - Residential
Certificate of Occupancy
SAB CONSTRUCTION LLC
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - COVERED DECK STOP WORK ORDER generated on 06/03/2024 12:00 AM by username 'Dustin Agcopra'. ADDED 935 SQ. FT. OF BASEMENT FINISH Brandon Kalwei 07/16/2024 4:11 PM STOP WORK ORDER removed on 07/31/2024 12:00 AM by username 'Dustin Agcopra'.
09/08/2023
09/14/2023
10/04/2024
Locations
Contacts
SAB CONSTRUCTION LLC, Address:200 NW COMMERCE CT  
SAB CONSTRUCTION LLC, Address:200 NW COMMERCE CT  
Joseph Matthew Schartz, Address:PO Box 942, Phone:(816) 524-3855  
JOE@SABHOMES.COM  
MIKE BRYANT HEATING & COOLING , Address:1711 E 123RD , Phone:(913) 441-7807  
TEAGUE ELECTRIC CONSTRUCTION INC, Address:12425 W 92ND ST, Phone:(913) 529-4600  
GARRISON PLUMBING, Address:15430 S MAHAFFIE ST STE 102, Phone:(913) 768-1311  
Talby Twiford, Address:200 NW Commerce CT  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sanitary Sewer Development Fee $2,159.00 $2,159.00 Paid 09/14/2023
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 09/14/2023
7232302-Residential License Tax Fee $1,022.72 $1,022.72 Paid 09/14/2023
8331401-Water Tap Fee $3,760.00 $3,760.00 Paid 09/14/2023
8350015-Water Meter Fee $680.46 $680.46 Paid 09/14/2023
9110078-Valuation Fee New Single Family $1,739.18 $1,739.18 Paid 09/14/2023
9110078-Additional Permit Fee $185.88 $185.88 Paid 07/17/2024
9110080-3rd and Subsequent Inspection Fee (Per Hour) $75.00 $75.00 Paid 09/05/2024
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 09/11/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 9/27/2023 9/27/2023 09/27/2023
Underslab Plumbing Inspection - Residential Failed 10/10/2023 10/10/2023 10/10/2023
Misc
Corrective Action Required
10/10/2023
Inspection denied -no address posted -erosion control, not in compliance
Erosion Control Inspection Residential Failed 10/10/2023 10/10/2023 10/10/2023
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
10/10/2023
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/10/2023
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -maintain downed and missing silt fence -clean street -maintain gravel filter
Sewer Service Inspection - R Passed 10/12/2023 10/12/2023 10/12/2023
Water Service Inspection - R Partial 10/12/2023 10/12/2023
Water Service Inspection - R Passed 10/13/2023 (1:15) 10/13/2023 10/13/2023
Underslab Plumbing Inspection - Residential Passed 10/20/2023 10/20/2023 10/20/2023
Misc
Resolved
10/20/2023
Inspection denied -no address posted -erosion control, not in compliance
Piers/Caissons Inspection - Residential Passed 11/9/2023 (11:15) 11/9/2023 11/09/2023
All Rough Inspection - Residential Failed 1/2/2024 1/2/2024 01/02/2024
Misc
Corrective Action Required
01/02/2024
-Garage portal frame nailing okay to cover -covered front porch, framing, already covered. Unable to inspect
Erosion Control Inspection Residential Failed 1/2/2024 1/2/2024 01/02/2024
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
01/02/2024
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Resolved
01/02/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -maintain downed and missing silt fence -clean street -maintain gravel filter
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
01/02/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Repair erosion control at front of lot Clean trash and debris from lot
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
01/02/2024
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Erosion Control Inspection Residential Failed 2/6/2024 02/06/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
01/02/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Repair erosion control at front of lot Clean trash and debris from lot Maintain lot access
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
02/06/2024
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
All Rough Inspection - Residential Failed 3/27/2024 3/27/2024 03/27/2024
Misc
Resolved
03/27/2024
-Garage portal frame nailing okay to cover -covered front porch, framing, already covered. Unable to inspect
MISC
Corrective Action Required
03/27/2024
-annchor bolt to be in the middle 1/3 of sill plate -plumb bath vents throughout -fireblock kitchen/garage wall to celing space -fire block dead space left and right of fireplace to ceiling space
All Rough Inspection - Residential Passed 4/1/2024 4/1/2024 04/01/2024
MISC
Resolved
04/01/2024
-annchor bolt to be in the middle 1/3 of sill plate -plumb bath vents throughout -fireblock kitchen/garage wall to celing space -fire block dead space left and right of fireplace to ceiling space
Electrical Service Inspection Passed 4/1/2024 4/1/2024 04/01/2024
Gas Service Inspection - Residential Passed 4/1/2024 4/1/2024 04/01/2024
Driveway Inspection Partial 5/23/2024 5/23/2024 05/23/2024
Misc
Informational
05/23/2024
5-23-24 Dustin A, DW has been formed and compacted to city specs. Approved to pour
Driveway Inspection Passed 5/30/2024 5/30/2024 05/29/2024
Misc
Informational
05/23/2024
5-23-24 Dustin A, DW has been formed and compacted to city specs. Approved to pour 5-29-24 Dustin A, DW was poured to city specs. Passed
Erosion Control Inspection Residential Partial 5/29/2024 05/29/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
02/06/2024
5-29-24 Dustin A, EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Repair erosion control at front of lot
Erosion Control Inspection Residential Failed - Stop Work 6/3/2024 6/3/2024 06/03/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
05/29/2024
5-29-24 Dustin A, EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Repair erosion control at front of lot 6-3-24 Dustin A, Erosion control has not be fixed
Erosion Control Inspection Residential Partial 7/31/2024 07/31/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
06/03/2024
5-29-24 Dustin A, EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Repair erosion control at front of lot 6-3-24 Dustin A, Erosion control has not be fixed 7-31-24 Dustin A, ESC has been fixed
All Rough Inspection - Residential Failed 8/1/2024 08/01/2024
Misc
Corrective Action Required
08/01/2024
-fireblock 1/2 bath hall wall to furr down ceiling space. -fireblock beam ends in basement -seal penetrations in n vertical to horizontal fireblocking
All Rough Inspection - Residential Failed 8/5/2024 8/5/2024 08/05/2024
Misc
Corrective Action Required
08/01/2024
-seal penetrations in n vertical to horizontal fireblocking Remove all insulation to check
All Rough Inspection - Residential Passed 8/6/2024 8/6/2024 08/06/2024
Misc
Resolved
08/06/2024
-seal penetrations in n vertical to horizontal fireblocking Remove all insulation to check
Occupancy Inspection - Codes Residential Failed 8/30/2024 08/30/2024
Misc
Corrective Action Required
08/30/2024
-pay all fees -provide as graded plot plan -sod splash blocks and sump pump discharge to extend 36” from foundation -label all non gfci outlets in unfinished space -spark ring at outlet above fire place -remove dust covers from smoke detectors
Occupancy Inspection - Codes Residential Failed 9/11/2024 9/11/2024 09/11/2024
Misc
Corrective Action Required
08/30/2024
-provide as graded plot plan
Occupancy Inspection - Codes Residential Ready for Temp CO 9/11/2024 9/11/2024 09/11/2024
Misc
Corrective Action Required
09/11/2024
-provide as graded plot plan
Plot Plan Inspection Passed 10/4/2024 10/04/2024
Erosion Control Inspection Residential Passed 10/04/2024
DCM3 ESC REQUIRED 2 DAY
Resolved
10/04/2024
5-29-24 Dustin A, EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Repair erosion control at front of lot 6-3-24 Dustin A, Erosion control has not be fixed 7-31-24 Dustin A, ESC has been fixed
Occupancy Inspection - Codes Residential Full C of O 10/4/2024 10/4/2024 10/04/2024
Misc
Resolved
10/04/2024
-provide as graded plot plan
Documents & Images
Date Uploaded File Type Document Name
09/08/2023 HFR098 - Air Combustion Calc
09/08/2023 HFR098 - Excise Tax Application
09/08/2023 HFR098 - Final Plot Plan 9_8_23
09/08/2023 HFR098 - Permit Application
09/08/2023 HFR098 - Final Engineered Plans 9_8_23
09/14/2023 Approved Plans approved plans
09/14/2023 Plot Plan approved plot plan
09/14/2023 Permit Codes Residential Plan Review
09/14/2023 Permit DS Building Permit
09/14/2023 Receipt Receipt for transaction:2023-007050
09/26/2023 M L Crose 2107 SW Harvest Moon Ln LSMO Footing Inspection Report 9-26-23
10/10/2023 Letter INSPECTION SUMMARY
10/10/2023 Letter INSPECTION SUMMARY
10/10/2023 Letter INSPECTION SUMMARY
10/12/2023 Letter INSPECTION SUMMARY
10/12/2023 Letter INSPECTION SUMMARY
10/13/2023 Letter INSPECTION SUMMARY
10/20/2023 Letter INSPECTION SUMMARY
11/09/2023 Letter INSPECTION SUMMARY
01/02/2024 Letter INSPECTION SUMMARY
01/02/2024 Letter INSPECTION SUMMARY
02/06/2024 Letter INSPECTION SUMMARY
05/23/2024 Letter INSPECTION SUMMARY
05/29/2024 Letter INSPECTION SUMMARY
05/29/2024 Letter INSPECTION SUMMARY
06/03/2024 Letter Stop Work Order
06/03/2024 Letter Stop Work Order
07/15/2024 Application Form Permit Application
07/16/2024 Approved Plans APPROVED BASEMENT FINISH
07/17/2024 Receipt Receipt for transaction:2024-005882
07/31/2024 Letter INSPECTION SUMMARY
08/01/2024 Letter INSPECTION SUMMARY
08/01/2024 Letter INSPECTION SUMMARY
08/01/2024 Letter INSPECTION SUMMARY
08/01/2024 Letter INSPECTION SUMMARY
08/01/2024 Letter INSPECTION SUMMARY
08/05/2024 Letter INSPECTION SUMMARY
08/06/2024 Letter INSPECTION SUMMARY
08/30/2024 Letter INSPECTION SUMMARY
09/05/2024 Receipt Receipt for transaction:2024-007497
09/11/2024 Letter INSPECTION SUMMARY
09/11/2024 Letter INSPECTION SUMMARY
09/11/2024 Certificate/License Codes Temporary Certificate of Occupancy
09/11/2024 Receipt Receipt for transaction:2024-007622
10/03/2024 Plot Plan approved as graded plot plan
10/04/2024 Letter INSPECTION SUMMARY
10/04/2024 Letter Field Certificate of Occupancy
10/04/2024 Letter Codes Final Certificate of Occupancy
10/04/2024 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home