Summary
PRRES20233746
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE. WALKOUT BASEMENT. FINISHED/UNFINISHED BASEMENT. ENGINEERED FLOOR SYSTEM - DEFERRED. COVERED DECK. 400 AMP. STOP WORK ORDER generated on 02/02/2024 12:00 AM by username 'Shawn Hoffman'. STOP WORK ORDER removed on 02/05/2024 12:00 AM by username 'Shawn Hoffman'.
08/02/2023
09/13/2023
02/12/2024
11/22/2024
Locations
Contacts
Matt Faulkner, Address:400 SW Longview BLVD, Unit:210  
APEX HEATING & AIR CONDITIONING INC, Address:1202 NW EAGLE RIDGE BLVD, Phone:(816) 228-2739  
HATHEWAY ELECTRIC LLC, Address:3125 SW PRYOR RD, Phone:(660) 232-2419  
R & R PLUMBING INC, Address:2001 GASLIGHT DR, Phone:(816) 772-5431  
MFAULKNER@GALECOMMUNITIES.COM  
GALE HOMES II INC, Address:400 SW LONGVIEW BLVD, Unit 109, Phone:(816) 761-9292  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Water Tap Fee $3,760.00 $3,760.00 Paid 09/13/2023
Water Meter Fee $680.46 $680.46 Paid 09/13/2023
Sanitary Sewer Development Fee $2,159.00 $2,159.00 Paid 09/13/2023
Right of Way Permit Fee $85.00 $85.00 Paid 09/13/2023
Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 09/13/2023
Valuation Fee New Single Family $2,548.28 $2,548.28 Paid 09/13/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Failed 1/31/2024 1/31/2024 01/31/2024
Misc
Corrective Action Required
01/31/2024
Inspection denied -No erosion control -no plans on site -water in footing
Water Service Inspection - R Partial 2/2/2024 2/2/2024 02/02/2024
Misc
Informational
02/02/2024
Pex out of foundation ok to cover
Sewer Service Inspection - R Passed 2/2/2024 02/02/2024
Erosion Control Inspection Residential Failed 2/2/2024 02/02/2024
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
02/02/2024
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Footing Inspection - Residential Failed - Stop Work 2/2/2024 02/02/2024
Misc
Corrective Action Required
01/31/2024
Inspection denied -No erosion control -no plans on site -water in footing
Footing Inspection - Residential Passed 2/14/2024 02/05/2024
Misc
Resolved
02/05/2024
Inspection denied -No erosion control -no plans on site -water in footing
Resolved
02/14/2024
Misc
Informational
02/14/2024
- FOOTING INSPECTED BY THIRD PARTY
Erosion Control Inspection Residential Partial 2/14/2024 02/14/2024
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
02/14/2024
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Misc
Corrective Action Required
02/14/2024
- OK AT TIME OF INSPECTION
Retaining Wall Inspection Passed 3/12/2024 03/12/2024
Misc
Informational
03/12/2024
INSPECTED BY APEX CLAYTON J. HESS
Underslab Plumbing Inspection - Residential Passed 3/20/2024 3/20/2024 03/20/2024
Erosion Control Inspection Residential Failed 4/16/2024 04/16/2024
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
02/14/2024
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED. -POST ADDRESS - PROTECT FRONT OF LOT.
Water Service Inspection - R Passed 5/20/2024 5/20/2024 05/20/2024
Misc
Resolved
05/20/2024
Pex out of foundation ok to cover
Erosion Control Inspection Residential Failed 6/3/2024 06/03/2024
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
04/16/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - PROTECT FRONT OF LOT.
Erosion Control Inspection Residential Failed 7/8/2024 07/08/2024
DCM2 ESC DEFICIENT INSTALLATION
Resolved
07/08/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - PROTECT FRONT OF LOT.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/08/2024
STREET CLEAN UP REQUIRED IMMEDIATELY, EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM6 ESC INSP DENIED STREET CLEAN UP
Resolved
07/08/2024
Erosion Control Inspection Residential Passed 7/10/2024 07/10/2024
DCM3 ESC REQUIRED 2 DAY
Resolved
07/10/2024
STREET CLEAN UP REQUIRED IMMEDIATELY, EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Misc
Corrective Action Required
07/10/2024
- OK AT TIME OF INSPECTION
All Rough Inspection - Residential Failed 7/10/2024 7/10/2024 07/10/2024
Misc
Corrective Action Required
07/10/2024
193 sw winter Fb= Fire blocking and draft stop - Fb top plate HVAC chase in garage - LIB missing at kitchen wall - Land electrical in box at master bedroom - Electrical outlet required at entry near stairs railing ( at Finnish)
Electrical Service Inspection Passed 7/10/2024 7/10/2024 07/10/2024
Gas Service Inspection - Residential Passed 7/10/2024 7/10/2024 07/10/2024
All Rough Inspection - Residential Passed 7/22/2024 7/22/2024 07/22/2024
Misc
Resolved
07/22/2024
193 sw winter Fb= Fire blocking and draft stop - Fb top plate HVAC chase in garage - LIB missing at kitchen wall - Land electrical in box at master bedroom - Electrical outlet required at entry near stairs railing ( at Finnish)
Erosion Control Inspection Residential Partial 7/22/2024 07/22/2024
Misc
Corrective Action Required
07/22/2024
- OK AT TIME OF INSPECTION.
Driveway Inspection Partial 8/14/2024 08/14/2024
Misc
Informational
08/14/2024
8-14-24 DP. Dw was formed, aggregate compacted. Approved to pour
Driveway Inspection Passed 11/19/2024 11/19/2024 11/19/2024
Misc
Informational
08/14/2024
8-14-24 DP. Dw was formed, aggregate compacted. Approved to pour 11-19-24 DP. DW was poured, forms removed. Passed
Erosion Control Inspection Residential Passed 11/19/2024 11/19/2024
Misc
Resolved
11/19/2024
- OK AT TIME OF INSPECTION.
Plot Plan Inspection Passed 11/19/2024 11/19/2024
Occupancy Inspection - Codes Residential Failed 11/19/2024 11/19/2024 11/19/2024
Misc
Corrective Action Required
11/19/2024
- missing screws in garage man door ( provide security screws) - Missing outlet and switch covers in kitchen - Missing screws at deck man door ( security screws) - Missing joists hanger deck stairs top landing - Provide blocking over beam at deck cantilever - Locate and uncover water meter, check height and bring pit to grade
Occupancy Inspection - Codes Residential Full C of O 11/22/2024 11/22/2024 11/22/2024
Misc
Resolved
11/22/2024
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home