Permit Application Status

PRRES20233000


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20233000
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE. FINISHED/UNFINISHED BASEMENT. WALKOUT BASEMENT. COVERED DECK. ROOF TRUSSES.
06/22/2023
06/26/2023
03/19/2024
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
Jennifer Rosenblum, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
TYLER@SUMMITHOMESKC.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Water Tap Fee $3,730.00 $3,730.00 Paid 06/26/2023
Water Meter Fee $550.50 $550.50 Paid 06/26/2023
Sanitary Sewer Development Fee $1,384.00 $1,384.00 Paid 06/26/2023
Right of Way Permit Fee $85.00 $85.00 Paid 06/26/2023
Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 06/26/2023
Valuation Fee New Single Family $1,415.55 $1,415.55 Paid 06/26/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 7/19/2023 07/19/2023
Underslab Plumbing Inspection - Residential Passed 8/2/2023 8/2/2023 08/02/2023
Sewer Service Inspection - R Passed 8/2/2023 08/02/2023
Water Service Inspection - R Passed 8/2/2023 (10:45) 8/2/2023 08/02/2023
Electrical Service Inspection Passed 11/7/2023 11/7/2023 11/07/2023
Gas Service Inspection - Residential Passed 11/7/2023 11/7/2023 11/07/2023
All Rough Inspection - Residential Failed 11/7/2023 11/7/2023 11/07/2023
Misc
Corrective Action Required
11/07/2023
-Missing nails at portal frame strap inside garage left side of large door -Missing nails at all CSPF strapping throughout -Nail double truss together in garage -Missing bocca plate at DWV in garage -Insufficient nails at exterior corner 2x4's throughout -Protect DWV in bedroom number 2 at base -Insufficient 2x6's at exterior corners add one more -Missing fire blocking above fridge area -Secure bottom of steel post in basement -Nail double truss together in bedroom number 2 -Missing hurricane straps in bedroom 2 -Nail protection for NM cable throughout (where nailed too close to the edge of the 2x4
All Rough Inspection - Residential Passed 11/10/2023 11/10/2023 11/10/2023
Misc
Resolved
11/10/2023
-Missing nails at all CSPF strapping throughout - -Insufficient nails at exterior corner 2x4's throughout -Protect DWV in bedroom number 2 at base -Insufficient 2x6's at exterior corners add one more -Secure bottom
Driveway Inspection Partial 12/8/2023 12/8/2023 12/08/2023
Misc
Informational
12/08/2023
12-8-23 DP. Crew had DW formed, aggregate compacted. Told them to watch the radar for possible rain. Approved to pour.
Sidewalk Inspection Partial 12/8/2023 12/8/2023 12/08/2023
Misc
Informational
12/08/2023
12-8-23 DP. Crew had SW formed, aggregate compacted and cross slopes were in compliance but conditions can change. Watch the weather. Approved to pour.
Occupancy Inspection - Codes Residential Failed 1/25/2024 1/25/2024 01/25/2024
Misc
Corrective Action Required
01/25/2024
- posted address shall be contrasting in color - Pending driveway and sidewalk inspection - Per security ordinance, light fixtures lower than 8’ must not have accessible bulbs @ garage sides. - Provide splash pads - Sump discharge to be 36” from foundation - Fire stop gaps at garage doors at ceiling - Garage entry door must self close and latch - Shear off set screw at main water spigot back flow preventer - Re establish Erosion Control at lot until sod is down - Provide (2) 1/2” through bolts on each post to beam connections -
Plot Plan Inspection Passed 1/25/2024 01/25/2024
Erosion Control Inspection Residential Failed 1/25/2024 01/25/2024
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
01/25/2024
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Driveway Inspection Passed 1/25/2024 1/25/2024 01/25/2024
Misc
Informational
12/08/2023
12-8-23 DP. Crew had DW formed, aggregate compacted. Told them to watch the radar for possible rain. Approved to pour. 1-25-24 DP. DW was poured, cross slopes in compliance. Passed.
Sidewalk Inspection Passed 1/25/2024 1/25/2024 01/25/2024
Misc
Informational
12/08/2023
12-8-23 DP. Crew had SW formed, aggregate compacted and cross slopes were in compliance but conditions can change. Watch the weather. Approved to pour. 1-25-24 DP. Crew poured SW, cross slopes in compliance. Passed.
Erosion Control Inspection Residential Failed 2/7/2024 02/07/2024
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
01/25/2024
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Sidewalk Inspection Partial 02/29/2024
Misc
Corrective Action Required
02/29/2024
2-29-24 Dustin A, SW on left of dw a panel been removed. As well as the aggregate. Will need another pre pour inspection before they pour
Sidewalk Inspection Failed 3/7/2024 3/7/2024 03/07/2024
Misc
Corrective Action Required
02/29/2024
2-29-24 Dustin A, SW on left of dw a panel been removed. As well as the aggregate. Will need another pre pour inspection before they pour 3-7-24 Dustin A, panel that was cut out was laid back in. That panel will need to be removed and new one will need to be poured with a new pre pour inspection before they pour
Sidewalk Inspection Passed 3/14/2024 3/14/2024 03/15/2024
Misc
Corrective Action Required
03/07/2024
2-29-24 Dustin A, SW on left of dw a panel been removed. As well as the aggregate. Will need another pre pour inspection before they pour 3-7-24 Dustin A, panel that was cut out was laid back in. That panel will need to be removed and new one will need to be poured with a new pre pour inspection before they pour 3-14-24 Dustin A, Replacement panel formed, Approved to pour 3-15-24 BR Sidewalk is constructed to LS specifications.
Erosion Control Inspection Residential Passed 3/18/2024 03/18/2024
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
03/18/2024
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Occupancy Inspection - Codes Residential Failed 3/18/2024 3/18/2024 03/18/2024
Misc
Corrective Action Required
01/25/2024
- Pending sidewalk inspection
Sidewalk Inspection Passed 3/19/2024 3/19/2024 03/19/2024
Misc
Informational
03/19/2024
3-19-24 Dustin A, Replaced SW is poured to city specs. Passed
Sidewalk Inspection Passed 3/21/2024 3/21/2024 03/19/2024
Misc
Corrective Action Required
03/14/2024
2-29-24 Dustin A, SW on left of dw a panel been removed. As well as the aggregate. Will need another pre pour inspection before they pour 3-7-24 Dustin A, panel that was cut out was laid back in. That panel will need to be removed and new one will need to be poured with a new pre pour inspection before they pour 3-14-24 Dustin A, Replacement panel formed, Approved to pour 3-1--24 Dustin A, SW poured to city specs. Passed
Occupancy Inspection - Codes Residential Full C of O 3/19/2024 3/19/2024 03/19/2024
Misc
Resolved
03/19/2024
Documents & Images
Date Uploaded File Type Document Name
06/22/2023 HM #183 - PERMIT APP
06/26/2023 Plot Plan APPROVED PLOT PLAN
06/26/2023 Approved Plans APPROVED PLANS
06/26/2023 Approved Plans APPROVED TRUSS PACKAGE
06/26/2023 Approved Plans APPROVED TRUSS LAYOUT
06/26/2023 Permit Codes Residential Plan Review
06/26/2023 Permit DS Building Permit
06/26/2023 Receipt Receipt for transaction:2023-004858
07/19/2023 Letter INSPECTION SUMMARY
08/02/2023 Letter INSPECTION SUMMARY
08/02/2023 Letter INSPECTION SUMMARY
08/02/2023 Letter INSPECTION SUMMARY
11/07/2023 Letter INSPECTION SUMMARY
11/07/2023 Letter INSPECTION SUMMARY
11/07/2023 Letter INSPECTION SUMMARY
11/10/2023 Letter INSPECTION SUMMARY
12/08/2023 Letter INSPECTION SUMMARY
12/08/2023 Letter INSPECTION SUMMARY
01/25/2024 Letter INSPECTION SUMMARY
01/25/2024 Letter INSPECTION SUMMARY
01/25/2024 Letter INSPECTION SUMMARY
01/25/2024 Letter INSPECTION SUMMARY
01/25/2024 Letter INSPECTION SUMMARY
02/07/2024 Letter INSPECTION SUMMARY
02/29/2024 Letter INSPECTION SUMMARY
02/29/2024 Letter INSPECTION SUMMARY
03/07/2024 Letter INSPECTION SUMMARY
03/14/2024 Letter INSPECTION SUMMARY
03/15/2024 Letter INSPECTION SUMMARY
03/18/2024 Letter INSPECTION SUMMARY
03/18/2024 Letter INSPECTION SUMMARY
03/19/2024 Letter INSPECTION SUMMARY
03/19/2024 Letter INSPECTION SUMMARY
03/19/2024 Letter Codes Final Certificate of Occupancy
03/19/2024 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home