Permit Application Status

PRRES20232318


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20232318
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE. FINISHED/UNFINISHED BASEMENT. ROOF TRUSSES.
05/23/2023
06/01/2023
11/26/2023
10/25/2023
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
Jennifer Rosenblum, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
TYLER@SUMMITHOMESKC.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 06/01/2023
7232302-Residential License Tax Fee $1,022.72 $1,022.72 Paid 06/01/2023
8331401-Water Tap Fee $3,730.00 $3,730.00 Paid 06/01/2023
8350015-Water Meter Fee $550.50 $550.50 Paid 06/01/2023
8331507-Sanitary Sewer Development Fee $1,384.00 $1,384.00 Paid 06/01/2023
9110078-Valuation Fee New Single Family $2,098.07 $2,098.07 Paid 06/01/2023
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 10/24/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 6/5/2023 (11:30) 6/5/2023 06/05/2023
Sewer Service Inspection - R Passed 6/13/2023 (1:45) 6/13/2023 06/13/2023
Water Service Inspection - R Partial 6/13/2023 06/13/2023
Misc
Informational
06/13/2023
- partial, pex from founation out.
Water Service Inspection - R Passed 6/14/2023 (9:30) 6/14/2023 06/14/2023
Misc
Resolved
06/14/2023
Underslab Plumbing Inspection - Residential Passed 6/14/2023 6/14/2023 06/14/2023
Erosion Control Inspection Residential Failed 7/21/2023 07/21/2023
Misc
Corrective Action Required
07/21/2023
- Repair silt fence - Clean both storm inlets
Erosion Control Inspection Residential Failed 7/31/2023 07/31/2023
Misc
Corrective Action Required
07/21/2023
- Repair silt fence by porta toilet - remove mud from street
Electrical Service Inspection Passed 7/31/2023 7/31/2023 07/31/2023
Gas Service Inspection - Residential Passed 7/31/2023 7/31/2023 07/31/2023
All Rough Inspection - Residential Failed 7/31/2023 7/31/2023 07/31/2023
Misc
Corrective Action Required
07/31/2023
- Fire block top plate of double wall at single garage bay block vertical to horizontal - Fb penetration at top plate front door - Strap top plate ( short over lap of top plate at bedroom 3 closet - Fire block gaps in bedroom 2 at ceiling height change panels
All Rough Inspection - Residential Passed 8/2/2023 8/2/2023 08/02/2023
Misc
Resolved
08/02/2023
- Fire block top plate of double wall at single garage bay block vertical to horizontal - Fb penetration at top plate front door - Strap top plate ( short over lap of top plate at bedroom 3 closet - Fire block gaps in bedroom 2 at ceiling height change panels
Plot Plan Inspection Passed 10/17/2023 10/17/2023
Erosion Control Inspection Residential Failed 10/17/2023 10/17/2023
Misc
Corrective Action Required
07/31/2023
- Clean out storm inlets - provide erosion control until sod is down
Occupancy Inspection - Codes Residential Ready for Temp CO 10/17/2023 10/17/2023 10/17/2023
Misc
Corrective Action Required
10/17/2023
- Seal top of meter can - Provide splash pads - Seal top of A/C disconnect - Provide sod
Occupancy Inspection - Codes Residential Failed 10/24/2023 10/24/2023 10/24/2023
Misc
Partial Correction
10/24/2023
-Pay fees
Erosion Control Inspection Residential Passed 10/25/2023 10/25/2023
Misc
Resolved
10/25/2023
- Clean out storm inlets - provide erosion control until sod is down
Occupancy Inspection - Codes Residential Full C of O 10/25/2023 10/25/2023 10/25/2023
Misc
Resolved
10/25/2023
-Pay fees
Documents & Images
Date Uploaded File Type Document Name
05/23/2023 HM #139 - PERMIT APP
05/25/2023 Permit Codes Residential Plan Review
05/25/2023 Plot Plan APPROVED PLOT PLAN
05/30/2023 Approved Plans APPROVED TRUSS LAYOUT
05/30/2023 Permit Codes Residential Plan Review
05/31/2023 Approved Plans APPROVED TRUSS PACKAGE
05/31/2023 Permit Codes Residential Plan Review
06/01/2023 Permit DS Building Permit
06/01/2023 Receipt Receipt for transaction:2023-003845
06/05/2023 Letter INSPECTION SUMMARY
06/13/2023 Letter INSPECTION SUMMARY
06/13/2023 Letter INSPECTION SUMMARY
06/14/2023 Letter INSPECTION SUMMARY
06/14/2023 Letter INSPECTION SUMMARY
06/15/2023 Approved Plans APPROVED PLANS
07/21/2023 Letter INSPECTION SUMMARY
07/31/2023 Letter INSPECTION SUMMARY
07/31/2023 Letter INSPECTION SUMMARY
07/31/2023 Letter INSPECTION SUMMARY
07/31/2023 Letter INSPECTION SUMMARY
08/02/2023 Letter INSPECTION SUMMARY
08/11/2023 Letter INSPECTION SUMMARY
08/11/2023 Letter INSPECTION SUMMARY
08/11/2023 Letter INSPECTION SUMMARY
10/17/2023 Letter INSPECTION SUMMARY
10/17/2023 Letter INSPECTION SUMMARY
10/17/2023 Letter INSPECTION SUMMARY
10/17/2023 Letter INSPECTION SUMMARY
10/17/2023 Letter INSPECTION SUMMARY
10/17/2023 Letter INSPECTION SUMMARY
10/24/2023 Letter INSPECTION SUMMARY
10/24/2023 Certificate/License Codes Temporary Certificate of Occupancy
10/24/2023 Receipt Receipt for transaction:2023-008008
10/25/2023 Letter Codes Final Certificate of Occupancy
10/25/2023 Letter Field Certificate of Occupancy
10/25/2023 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home