Summary
PRRES20222015
Building Permit - Residential
Certificate of Occupancy
KEVIN HIGDON CONSTRUCTION LLC
NEW SINGLE FAMILY
NEW HOUSE - PARTIAL FINISHED BASEMENT - COVERED PATIO ENGINEERED DRAWINGS FOR RETAINING WALL NEEDED PRIOR TO OCCUPANCY KHANH NGUYEN 06/03/2024 9:23 AM **Permit shows finished basement, but basement is not finished. A separate basement finish permit will have to be obtained if the basement is finished
05/11/2022
05/12/2022
06/03/2024
Locations
Contacts
KEVIN HIGDON CONSTRUCTION, LLC, Address:P O BOX 847, Phone:(816) 524-9797  
KEVIN HIGDON CONSTRUCTION LLC, Address:PO BOX 847, Phone:(816) 524-9797  
kevin higdon, Address:po box 847  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
INTERSTATE CONSTRUCTION SERVICES, Address:1450 SE BROADWAY DR, Phone:(816) 524-9797  
MILLER PLUMBING CO, Address:PO BOX 393 , Phone:(913) 851-1333  
DOUG@HIGDONBUILDERS.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,168.05 $1,168.05 Paid 05/12/2022
Right of Way Permit Fee $85.00 $85.00 Paid 05/12/2022
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 05/12/2022
8331506-EFHB Maybrook, Full $553.93 $553.93 Paid 05/12/2022
8331507-Sewer Connection Fee $390.00 $390.00 Paid 05/12/2022
Water Tap Fee $3,655.00 $3,655.00 Paid 05/12/2022
Water Meter Fee $479.24 $479.24 Paid 05/12/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Residential Failed 5/16/2023 05/16/2023
DCM5 ESC INSP DENIED
Corrective Action Required
05/16/2023
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION. **INSPECTION DENIED. EROSION CONTROL SHALL BE INSTALLED ALONG THE STREET PER CITY REQUIREMENT WITHIN 2 BUSINESS DAYS. STREET CLEANUP SHALL BE PERFORMED IMMEDIATELY.
Underslab Plumbing Inspection - Residential Failed 5/16/2023 5/16/2023 05/16/2023
Misc
Corrective Action Required
05/16/2023
**INSPECTION DENIED. EROSION CONTROL SHALL BE INSTALLED ALONG THE STREET PER CITY REQUIREMENT WITHIN 2 BUSINESS DAYS. STREET CLEANUP SHALL BE PERFORMED IMMEDIATELY.
Sewer Service Inspection - R Passed 5/25/2023 05/25/2023
Water Service Inspection - R Passed 5/26/2023 (9:30) 5/26/2023 05/26/2023
Underslab Plumbing Inspection - Residential Passed 6/6/2023 6/5/2023 06/05/2023
Misc
Resolved
06/05/2023
**INSPECTION DENIED. EROSION CONTROL SHALL BE INSTALLED ALONG THE STREET PER CITY REQUIREMENT WITHIN 2 BUSINESS DAYS. STREET CLEANUP SHALL BE PERFORMED IMMEDIATELY.
Driveway Inspection Partial 6/8/2023 06/08/2023
Misc
Informational
06/08/2023
6-8-23 NS Site visited the foundation has been poured and that is it. will schedule out for a couple months.
Piers/Caissons Inspection - Residential Passed 8/24/2023 (10:00) 8/24/2023 08/24/2023
Misc
Informational
08/24/2023
Piers less than 36” deep but on solid rock
All Rough Inspection - Residential Failed 10/9/2023 10/9/2023 10/09/2023
Misc
Corrective Action Required
10/09/2023
No access to house
Electrical Service Inspection Failed 10/9/2023 10/9/2023 10/09/2023
Misc
Corrective Action Required
10/09/2023
No access to house
Gas Service Inspection - Residential Failed 10/9/2023 10/09/2023
Misc
Corrective Action Required
10/09/2023
No access to house
Electrical Service Inspection Failed 10/12/2023 10/12/2023 10/12/2023
Misc
Corrective Action Required
10/09/2023
-Locate and ground service to ufer
Gas Service Inspection - Residential Failed 10/12/2023 10/12/2023 10/12/2023
Misc
Corrective Action Required
10/09/2023
-Complete connection of gas line to fireplace and retest
All Rough Inspection - Residential Failed 10/12/2023 10/12/2023 10/12/2023
Misc
Corrective Action Required
10/09/2023
-Nail siding to sill plates @6” oc -Tighten sill plate down anchor nut in garage; anchor sill plate within 12” of breaks -Garage PFH wall tension straps must extend to wall top plates -Wall top plates not lapped min 24” at garage/closet wall intersection -Securely fasten NM under floor in garage -Provide (7)2x4 support for garage I beam per plan -Provide roof purlins spaces at interval no more than 4 ft -Provide collar ties near ridge @ max 4 ft interval -Complete bath fan installation and light above master bathroom ; complete installation of all bath fans -Provide hanger support at connection of the master bedroom ceiling beam to the triple 2x12 beam -Fb fireplace space from roof; Fb laundry wall from roof at top -Complete framing at fireplace and secure fireplace to framing -Provide (3)2x4 support for the 14” LVL beam near fireplace -Provide full support under roof strut to slide door header -Provide 3-10d face nails at rafter-ceiling joist connections -Nail corner studs w/ 16d@12” oc or equivalent nailing -Complete electrical at kitchen wall -Provide ladder in basement. Check all anchoring -Install floor joist hangers at stair (north basement stair wall) -Double every other joists per plan -Expose the I beam below kitchen and foyer wall -Move struts above mud and closet to bearing wall above I beam **DO NOT INSULATE
Electrical Service Inspection Passed 10/23/2023 10/23/2023 10/23/2023
Misc
Resolved
10/23/2023
-Locate and ground service to ufer
All Rough Inspection - Residential Failed 10/23/2023 10/23/2023 10/23/2023
Misc
Corrective Action Required
10/12/2023
-Garage PFH wall tension straps must extend to wall top plates **please get longer straps. Strap must extend from 2 ft below header to wall top plates -Wall top plates not lapped min 24” at garage/closet wall intersection -Securely fasten NM under floor in garage -Provide (7)2x4 support for garage I beam per plan **Re-secure wiring per code -Provide roof purlins spaces at interval no more than 4 ft -Provide hanger support at connection of the master bedroom ceiling beam to the triple 2x12 beam -Fb fireplace space from roof; Fb laundry wall from roof at top **at fireplace space, use 3/4” sheathing and Fb excessive gap; at laundry wall, install blockings at top plate to close the openings -Complete framing at fireplace and secure fireplace to framing **Fasten fireplace to framing -Move struts above mud and closet to bearing wall above I beam **the plan shows that the roof purlin support bear on the LBW above the I beam in the basement. Support roof per plan **OK TO INSULATE
Driveway Inspection Partial 10/23/2023 10/23/2023 10/23/2023
Misc
Informational
06/08/2023
6-8-23 NS Site visited the foundation has been poured and that is it. will schedule out for a couple months. 10-23-23 Site visited for a pre pour inspection and the driveway meets city standards and I will come back in a month to check if the forms have been pulled.
Erosion Control Inspection Residential Failed 10/27/2023 10/27/2023
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
10/27/2023
CLEAN MUD AND GRAVEL OFF THE STREET. RESTORE EROSION CONTROL ALONG THE STREET NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
Gas Service Inspection - Residential Passed 10/27/2023 10/27/2023
Misc
Resolved
10/27/2023
-Complete connection of gas line to fireplace and retest
All Rough Inspection - Residential Failed 10/27/2023 10/27/2023 10/27/2023
Misc
Corrective Action Required
10/23/2023
-Wall top plates not lapped min 24” at garage/closet wall intersection **have engineer address the unlapped top plates (both plates are cut) at intersection of the master closet wall and garage exterior wall. At least strap the plates across the intersection to tie adjacent wall top plates together and nail studs at intersection together
Footing Inspection - Residential Passed 03/29/2024
Informational
03/29/2024
FOOTING APPROVED BY ENGINEER
All Rough Inspection - Residential Passed 5/14/2024 5/14/2024 05/14/2024
Misc
Resolved
05/14/2024
-Wall top plates not lapped min 24” at garage/closet wall intersection **have engineer address the unlapped top plates (both plates are cut) at intersection of the master closet wall and garage exterior wall. At least strap the plates across the intersection to tie adjacent wall top plates together and nail studs at intersection together
Erosion Control Inspection Residential Passed 05/14/2024
DCM2 ESC DEFICIENT INSTALLATION
Resolved
05/14/2024
CLEAN MUD AND GRAVEL OFF THE STREET. RESTORE EROSION CONTROL ALONG THE STREET NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
Occupancy Inspection - Codes Residential Failed 5/14/2024 5/14/2024 05/14/2024
Misc
Corrective Action Required
05/14/2024
-Obtain lawn irrigation permit and submit backflow valve test report to city -Driveway not approved on record -Allrough deficiencies was not addressed. The deficiency was the unlapped top plates at intersection at the garage exterior wall and the master closet/garage wall. **Wall top plates not lapped min 24” at garage/closet wall intersection **have engineer address the unlapped top plates (both plates are cut) at intersection of the master closet wall and garage exterior wall. At least strap the plates across the intersection to tie adjacent wall top plates together and nail studs at intersection together** -Seal exterior wall penetration at receptacle near AC -Install cover for receptacle near AC -Front stair landing shall be min 36” deep in direction of travel -Provide tamper-resistant receptacle throughout house -Adjust garage door to fully self-close -Support furnace exhaust piping at interval every 5 ft or less -Provide breaker lock for oven, cooktop, and kitchen hood -Label or identify all dedicated non-gfci receptacles in garage and basement -Remove paper facing from insilation in basement **Permit shows finished basement, but basement is not finished at this time
Occupancy Inspection - Codes Residential Full C of O 6/3/2024 6/3/2024 06/03/2024
Misc
Resolved
06/03/2024
-Driveway not approved on record
Driveway Inspection Passed 06/03/2024
Misc
Informational
10/23/2023
6-8-23 NS Site visited the foundation has been poured and that is it. will schedule out for a couple months. 10-23-23 Site visited for a pre pour inspection and the driveway meets city standards and I will come back in a month to check if the forms have been pulled. 6-3-24 NS Site visited and it appears that driveway meets city standards. Passed
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home

*PLEASE NOTE - You must be logged in with your registered user account to view any documents related to your permit