Permit Application Status

PRRES20221619


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20221619
Building Permit - Residential
Final Completion
FRANK ALEXANDER J & LISA M
ALTERATION SINGLE FAMILY
ROOF MOUNTED SOLAR - 7.6 KW
04/20/2022
05/12/2022
07/11/2022
Locations
Contacts
Titan Solar Power MO, Inc., Address:525 W Baseline Rd  
mopermitting@titansolarpower.com, Address:mopermitting@titansolarpower.com  
FRANK ALEXANDER J & LISA M, Address:1900 SW MERRYMAN DR  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Department Solar Review Approved 05/09/2022 05/10/2022
Jim Eden
Residential Plan Review Approved 05/09/2022 05/05/2022
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Add/Alter Single Family $106.13 $106.13 Paid 05/12/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Electrical Service Inspection Passed 7/11/2022 7/11/2022 07/11/2022
Final Electrical Inspection - Residential Passed 07/11/2022
Final Inspection - Residential Passed 7/11/2022 7/11/2022 07/11/2022
Documents & Images
Date Uploaded File Type Document Name
04/20/2022 Application Form Photovoltaic System Permit Application Frank
05/05/2022 Plans Plans and Spec Sheets - 1900 SW Merryman Dr
05/11/2022 Approved Plans approved - Plans and Spec Sheets - 1900 SW Merryman Dr
05/12/2022 Permit DS Building Permit
05/12/2022 Receipt Receipt for transaction:2022-003377
06/01/2022 Letter Fire Building Plan Review
07/11/2022 Letter INSPECTION SUMMARY
07/11/2022 Letter INSPECTION SUMMARY
07/11/2022 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home