Summary
PRRES20220917
Building Permit - Residential
Certificate of Occupancy
CLAYTON PROPERTIES GROUP INC
NEW SINGLE FAMILY
NEW HOUSE. UNFINISHED BASEMENT. ROOF TRUSSES.
03/11/2022
03/16/2022
09/10/2022
06/08/2023
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
CLAYTON PROPERTIES GROUP INC, Address:120 SE 30TH ST  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
TAYLOR@CLOVERANDHIVE.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sewer Connection Fee $420.00 $420.00 Paid 03/16/2022
8331401-Water Tap Fee $3,655.00 $3,655.00 Paid 03/16/2022
8350015-Water Meter Fee $479.24 $479.24 Paid 03/16/2022
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 03/16/2022
7232302-Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 03/16/2022
9110078-Valuation Fee New Single Family $953.77 $953.77 Paid 03/16/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 4/18/2022 4/18/2022 04/18/2022
Misc
Corrective Action Required
04/18/2022
APPROVED PER DAVID P AINSWORTH 4/15/22
Underslab Plumbing Inspection - Residential Passed 5/19/2022 5/19/2022 05/19/2022
Erosion Control Inspection Residential Failed 5/19/2022 5/19/2022 05/19/2022
Misc
Corrective Action Required
05/19/2022
MAINTAIN GRAVEL FILTER ON DRIVE
Sewer Service Inspection - R Passed 6/6/2022 (10:45) 6/6/2022 06/06/2022
Water Service Inspection - R Passed 6/14/2022 06/14/2022
All Rough Inspection - Residential Passed 4/5/2023 4/5/2023 04/05/2023
Misc
Informational
04/05/2023
CSPF and portal passed
All Rough Inspection - Residential Failed 4/18/2023 04/18/2023
Electrical Service Inspection Passed 4/18/2023 4/18/2023 04/18/2023
Gas Service Inspection - Residential Passed 4/18/2023 4/18/2023 04/18/2023
All Rough Inspection - Residential Failed 4/18/2023 4/18/2023 04/18/2023
Miscellaneous Correction
Corrective Action Required
04/18/2023
-need fire blocking in the chase ceiling in the garage -fire blocking in the cavity A/C wall by garage entry bathroom is broken and missing -fire block 1/2 bathroom wall off the garage in fur down -fire block kitchen wall/duct chase at the end of the fur down -master bathroom vanity by 2 inch PVC vent pipe needs to be strapped at the top plate -metal conduit for sump pump needs a plastic bushing on top at electrical wire
All Rough Inspection - Residential Passed 4/20/2023 4/20/2023 04/20/2023
Miscellaneous Correction
Resolved
04/20/2023
-need fire blocking in the chase ceiling in the garage -fire blocking in the cavity A/C wall by garage entry bathroom is broken and missing -fire block 1/2 bathroom wall off the garage in fur down -fire block kitchen wall/duct chase at the end of the fur down -master bathroom vanity by 2 inch PVC vent pipe needs to be strapped at the top plate -metal conduit for sump pump needs a plastic bushing on top at electrical wire
Driveway Inspection Partial 4/24/2023 4/24/2023 04/24/2023
Misc
Informational
04/24/2023
4-24-23 PS pre pour, froms are in place and aggregate has been compacted, ok to pour
Sidewalk Inspection Partial 4/24/2023 4/24/2023 04/24/2023
Misc
Informational
04/24/2023
4-24-23 PS pre pour, forms are in place and aggregate has been compacted, ok to pour
Driveway Inspection Passed 5/1/2023 5/1/2023 05/01/2023
Misc
Informational
04/24/2023
4-24-23 PS pre pour, froms are in place and aggregate has been compacted, ok to pour 5-1-23 PS Driveway meets LS and ADA specifications
Sidewalk Inspection Passed 5/1/2023 5/1/2023 05/01/2023
Misc
Informational
04/24/2023
4-24-23 PS pre pour, forms are in place and aggregate has been compacted, ok to pour 5-1-23 PS Sidewalk meets LS and ADA specifications
Occupancy Inspection - Codes Residential Failed 6/6/2023 6/6/2023 06/06/2023
Miscellaneous Correction
Corrective Action Required
06/06/2023
- Dishwasher does not have a water hammer device installed - Dishwasher is not GFCI protected - Kitchen backsplash plate cover is not secured - Washer does not have a water hammer device installed - Self closing garage door hinge needs to be adjusted - Interior above garage overhead door vertical board needs to be sealed at the ceiling - Hot water tank whip needs to be secured better - Exterior gas line needs to be sealed - A/C whip needs to be attached to the exterior wall - Sump pump discharge needs to be sealed at the siding
Erosion Control Inspection Residential Passed 6/8/2023 06/08/2023
Misc
Resolved
06/08/2023
MAINTAIN GRAVEL FILTER ON DRIVE
Plot Plan Inspection Passed 6/8/2023 06/08/2023
Occupancy Inspection - Codes Residential Full C of O 6/8/2023 6/8/2023 06/08/2023
Miscellaneous Correction
Resolved
06/08/2023
Documents & Images
Date Uploaded File Type Document Name
03/14/2022 Plot Plan APPROVED PLOT PLAN
03/14/2022 Permit Codes Residential Plan Review
03/15/2022 CB #144 - Lees Summit Permit App
03/15/2022 Approved Plans APPROVED TRUSS LAYOUT
03/15/2022 Approved Plans APPROVED TRUSS PACKAGE
03/15/2022 Approved Plans APPROVED DRAWINGS
03/15/2022 Permit Codes Residential Plan Review
03/16/2022 Permit DS Building Permit
03/16/2022 Receipt Receipt for transaction:2022-001447
04/17/2022 M L Crose 3533 SE Corbin Dr LSMO Cobey Creek Lot 144 Clayton Permit 2022-0917 Footing Inspection Report 4-15-22
04/18/2022 Letter INSPECTION SUMMARY
05/19/2022 Letter INSPECTION SUMMARY
05/19/2022 Letter INSPECTION SUMMARY
06/06/2022 Letter INSPECTION SUMMARY
06/14/2022 Letter INSPECTION SUMMARY
04/04/2023 CB 144 Perrmit Extension Request Form
04/05/2023 Letter INSPECTION SUMMARY
04/18/2023 Letter INSPECTION SUMMARY
04/18/2023 Letter INSPECTION SUMMARY
04/18/2023 Letter INSPECTION SUMMARY
04/18/2023 Letter INSPECTION SUMMARY
04/20/2023 Letter INSPECTION SUMMARY
04/24/2023 Letter INSPECTION SUMMARY
04/24/2023 Letter INSPECTION SUMMARY
05/01/2023 Letter INSPECTION SUMMARY
05/01/2023 Letter INSPECTION SUMMARY
06/06/2023 Letter INSPECTION SUMMARY
06/08/2023 Letter INSPECTION SUMMARY
06/08/2023 Letter INSPECTION SUMMARY
06/08/2023 Letter Field Certificate of Occupancy
06/08/2023 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home