Summary
PRRES20215212
Building Permit - Residential
Certificate of Occupancy
KEVIN HIGDON CONSTRUCTION LLC
NEW 3 OR 4 FAMILY
NEW FOUR PLEX - UNFINISHED BASEMENT - UNCOVERED DECK TILE ROOF
10/05/2021
10/08/2021
04/04/2022
05/03/2024
Locations
Contacts
KEVIN HIGDON CONSTRUCTION, LLC, Address:P O BOX 847, Phone:(816) 524-9797  
KEVIN HIGDON CONSTRUCTION LLC, Address:PO BOX 847, Phone:(816) 524-9797  
kevin higdon, Address:po box 847  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
INTERSTATE ELECTRICAL CONSTRUCTION, Address:3710 ROBINSON PIKE RD, Phone:(816) 761-0200  
MILLER PLUMBING CO, Address:PO BOX 393 , Phone:(913) 851-1333  
DOUG@HIGDONBUILDERS.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for New 3 or 4 Family $4,717.09 $4,717.09 Paid 10/08/2021
Right of Way Permit Fee $85.00 $85.00 Paid 10/08/2021
Residential Excise Tax Fee $4,308.48 $4,308.48 Paid 10/08/2021
8331507-Sewer Connection Fee $1,320.00 $1,320.00 Paid 10/08/2021
Water Tap Fee $14,620.00 $14,620.00 Paid 10/08/2021
Water Meter Fee $1,916.96 $1,916.96 Paid 10/08/2021
8331506-EFHB Maybrook, Full $1,874.84 $1,874.84 Paid 10/08/2021
Temporary Occupancy Fee $50.00 $50.00 Paid 10/05/2023
Temporary Occupancy Fee $50.00 $50.00 Paid 01/12/2024
Temporary Occupancy Fee $50.00 $50.00 Paid 03/29/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 11/18/2021 (1:30) 11/18/2021 11/18/2021
Erosion Control Inspection Residential Failed 3/4/2022 03/04/2022
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
03/04/2022
DEFICIENT EROSION CONTROL INSTALLATION ALONG THE STREET. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
Underslab Plumbing Inspection - Residential Passed 3/4/2022 3/4/2022 03/04/2022
Underslab Electrical Inspection - Residential Passed 3/4/2022 03/04/2022
Sewer Service Inspection - R Partial 3/22/2022 (9:15) 3/22/2022 03/22/2022
Misc
Corrective Action Required
03/22/2022
SEWER FOR UNIT 4015-OK
Sewer Service Inspection - R Partial 3/22/2022 (11:00) 3/22/2022 03/22/2022
Misc
Corrective Action Required
03/22/2022
SEWER FOR UNIT 4015, 4017-OK
Sewer Service Inspection - R Partial 3/25/2022 03/25/2022
Misc
Corrective Action Required
03/22/2022
SEWER FOR UNIT 4015, 4017-OK *SEWER TO INSERTED WYE AT SEWER MAIN IS OK. INSERTED WYE FITTING MUST BE APPROVED BY ROW
Sewer Service Inspection - R Passed 3/25/2022 (1:00) 3/25/2022 03/25/2022
Misc
Resolved
03/25/2022
SEWER FOR UNIT 4013, 4015, 4017-OK *SEWER TO INSERTED WYE AT SEWER MAIN IS OK. INSERTED WYE FITTING OK BY ADAM
Sewer Service Inspection - R Passed 03/29/2022
Misc
Informational
03/29/2022
3-29-22 AN contractor installed a new wye and stub on the sewer main because the lot originally was a 3 plex and they changed it to a 4 plex
Water Service Inspection - R Passed 3/29/2022 03/29/2022
Rated Assembly Inspection Failed 10/17/2022 10/17/2022 10/17/2022
Miscellaneous Correction
Corrective Action Required
10/17/2022
-ADDRESS 5/8" ROCK BEING USED, PLANS SHOW 1" TYPE X SHAFT ASSEMBLY -ADDRESS PENETRATIONS AND DAMAGED ROCK
Erosion Control Inspection Residential Failed 10/17/2022
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
03/04/2022
10-17-22 -DEFICIENT EROSION CONTROL INSTALLATION ALONG THE STREET. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -CLEAN DEBRIS FROM STREETS AND STORM INLETS
Rated Assembly Inspection Failed 10/17/2022
Miscellaneous Correction
Corrective Action Required
10/17/2022
-ADDRESS 5/8" ROCK BEING USED, PLANS SHOW 1" TYPE X SHAFT ASSEMBLY -ADDRESS PENETRATIONS AND DAMAGED ROCK **ADDRESS FAILED EROSION CONTROL BEFORE ANY FURTHER INSPECTION
Electrical Service Inspection Passed 12/6/2022 12/6/2022 12/06/2022
Gas Service Inspection - Residential Failed 12/6/2022 12/6/2022 12/06/2022
Misc
Corrective Action Required
12/06/2022
4011-Complete gas piping and retest All other units OK
All Rough Inspection - Residential Failed 12/6/2022 12/6/2022 12/06/2022
Misc
Corrective Action Required
12/06/2022
**Provide firewall UL listing **Provide truss plan on site **Provide approved plan on site 4011: -Provide fire separation of garage attic from adjacent unit; separation from adjacent unit -Protect wiring within six ft of attic access -Strap garage/bathroom bearing wall top plate where bored more than 50% -Install stud shoe at laundry/closet wall where stud is bored more than 60% -Fb laundry/stair wall at ceiling level -Tie down support header outside front bedroom against uplift -Protect wiring at bottom wall plate underneath window adjacent to deck door -Windows in living room less than 18” above floor and more than 9 square feet shall be safety tempered glass windows -Fire caulk all penetrations of firewall membrane -Plumbing cannot be inside 2-hr firewall -Connect duct to master bathroom fan -Provide vent for future basement bathroom -Connect csst gas line to rigid gas piping and retest 4013: -Protect wiring at firewall I beam support stud -Plumbing cannot be inside 2-hr firewall (both floors) -Windows in living room less than 18” above floor and more than 9 square feet shall be safety tempered glass windows -Joist above living room bored hole exceeding 1/3 joist depth -Strap exterior wall top plates bore more than 50% adjacent to fireplace -Support DVW above living room at max 4 ft interval -Strap garage/dwelling bearing wall top plate where bored more than 50% -Fb wall at laundry/stair at ceiling level -Close gap at roof deck sheathing within 4 ft of firewall -Tie down trusses to rear bedroom exterior wall (above windows) -Strap rear bathroom exterior wall top plates where bored more than 50% -Support dryer duct in attic -Fire caulk all penetrations of firewall membrane -Provide a joist directly underneath pantry/bathroom corner -Bored holes cannot be within 2” of bottom of joists (above furnace area and future basement bathroom) 4015: -Plumbing cannot be inside 2-hr firewall (both floors) -Windows in living room less than 18” above floor and more than 9 square feet shall be safety tempered glass windows -Joist above living room bored hole exceeding 1/3 joist depths -Strap exterior wall top plates bore more than 50% adjacent to fireplace -Support plumbing at maximum 4 ft interval above kitchen I beam; slope 2” DVW min 1/4” per ft -Install stud shoe for kitchen non-bearing wall stud bored more than 60% -Strap garage/dwelling bearing wall top plate where bored more than 50% -Bored holes cannot be within 2” of bottom of joists (1st fl bathroom) -Provide min 1” clearance from combustible around b-vent in chase -Anchor garage wall sill plate within middle 1/3 of plate -Fb wall behind bathtub from roof -Strap rear bathroom exterior wall top plates lapped less than 24” and where bored more than 50% -Fire caulk all penetrations of firewall membrane -Provide a joist directly underneath pantry/bathroom corner 4017: -Provide fire separation of garage attic from adjacent unit -Protect wiring within six ft of attic access -Strap garage/bathroom bearing wall top plate where bored more than 50% -Fire caulk all penetrations of firewall membrane -Protect wiring at bottom wall plate underneath window adjacent to deck door -Plumbing cannot be inside 2-hr firewall -Install stud shoe at laundry/closet wall where stud is bored more than 60% -Remove construction debris from attic (above master closet) -Bored hole cannot be within 2” of bottom of joists (below master bathroom) -Provide vent for future basement bathroom **DO NOT INSULATE
Rated Assembly Inspection Failed 1/24/2023 1/24/2023 01/24/2023
Miscellaneous Correction
Corrective Action Required
10/17/2022
**ADDRESS FAILED EROSION CONTROL BEFORE ANY FURTHER INSPECTION **ATTIC FIREWALL INSPECTION ONLY** **Provide architect address for compliance with R302.2.2 and R302.2.3 with the current firewall design. Submit revised plan to city for approval 4011: -Provide 2-hr attic firewall separation between garage and 4013 -Provide 2 layers of fire rock at wood block at garage attic FW -Patch holes in attic FW with 2 layers 4013: -Attic FW above foyer must extend all the way to roof deck. -Close excessive gap at ridge -Provide 2 layers of fire rock at wood block above stair -Patch holes in attic FW with 2 layers -Wrap exposed truss at FW with 2 layers -Fire caulk FW membrane penetration by attic access framing 4015: -Attic FW above foyer must extend all the way to roof deck. -Close excessive gap at ridge -Provide 2 layers of fire rock at wood block above stair -Patch holes in attic FW with 2 layers -Wrap exposed truss at FW with 2 layers -Fire caulk FW membrane penetration by attic access framing 4017: -Provide 2-hr attic firewall separation between garage and 4015 -Fire caulk FW membrane penetration above garage -Provide 2 layers of fire rock at wood block at garage attic FW -Patch holes in attic FW with 2 layers
Gas Service Inspection - Residential Passed 1/24/2023 1/24/2023 01/24/2023
Misc
Resolved
01/24/2023
4011-Complete gas piping and retest All other units OK
All Rough Inspection - Residential Failed 1/30/2023 1/30/2023 01/30/2023
Misc
Corrective Action Required
12/06/2022
**Provide firewall UL listing **Provide truss plan on site **Provide approved plan on site Addenum per plan: -Install support studs for truss girder per A-2 -1 hr soffit per plan 4011: -Provide fire separation of garage attic from adjacent unit; separation from adjacent unit **See rated assembly inspection -Fb laundry/stair wall at ceiling level -Tie down support header outside front bedroom against uplift -Windows in living room less than 18” above floor and more than 9 square feet shall be safety tempered glass windows **Glazing shall meet the requirement of R308.3.1, either class II of CPSC 16 CFR 1201 or class A of ANSI Z97.1 -Fire caulk all penetrations of firewall membrane -Plumbing cannot be inside 2-hr firewall **Fb holes in wall plates; close holes in attic firewall with 2 layers of fire rock -Connect csst gas line to rigid gas piping and retest **Pump air test pressure to min 10 psi 4013: -Plumbing cannot be inside 2-hr firewall (both floors) **Close hole in attic firewall with 2 layers of fire rock. Also see rated assembly inspection -Windows in living room less than 18” above floor and more than 9 square feet shall be safety tempered glass windows **Glazing shall meet the requirement of R308.3.1, either class II of CPSC 16 CFR 1201 or class A of ANSI Z97.1 -Fb wall at laundry/stair at ceiling level -Close gap at roof deck sheathing within 4 ft of firewall -Strap rear bathroom exterior wall top plates where bored more than 50% **install BOCA plate -Reinstall firewall studs at laundry rm -Fire caulk all penetrations of firewall membrane **See rated assembly inspection -Bored holes cannot be within 2” of bottom of joists (future basement bathroom) **Not done. See the PVC 4015: -Plumbing cannot be inside 2-hr firewall (both floors)**Close holes in attic firewall with 2 layers of fire rock -Windows in living room less than 18” above floor and more than 9 square feet shall be safety tempered glass windows **Glazing shall meet the requirement of R308.3.1, either class II of CPSC 16 CFR 1201 or class A of ANSI Z97.1 -Joist above living room bored hole exceeding 1/3 joist depths **Not repaired per engineer letter; reinstall support for DVW at interval no more than 4 ft -Strap exterior wall top plates bore more than 50% adjacent to fireplace **Fb wall plate penetration; Provide extra 2” of protection at top&bottom wall plates -Provide min 1” clearance from combustible around b-vent in chase **Cut out wood for min 1” clearance from b-vent -Fire caulk all penetrations of firewall membrane **Also see rated assembly inspection -Reinstall firewall studs at laundry rm 4017: -Provide fire separation of garage attic from adjacent unit **See rated assembly inspection -Strap garage/bathroom bearing wall top plate where bored more than 50% **Nail strap holes. Min 4 nails each side of hole -Fire caulk all penetrations of firewall membrane -Plumbing cannot be inside 2-hr firewall **Fb holes in wall plates; close holes in attic firewall with 2 layers of fire rock **OK TO INSULATE
Rated Assembly Inspection Failed 2/8/2023 2/8/2023 02/08/2023
Miscellaneous Correction
Corrective Action Required
01/24/2023
**ATTIC FIREWALL INSPECTION ONLY** 4011: -Fire caulk FW membrane penetration above garage 4013: -Attic FW above foyer must extend all the way to roof deck. -Close excessive gap at ridge -Wrap exposed truss at FW with 2 layers -Fire caulk FW membrane penetration by attic access framing 4015: -Attic FW above foyer must extend all the way to roof deck. -Close excessive gap at ridge -Wrap exposed truss at FW with 2 layers -Fire caulk FW membrane penetration by attic access framing 4017: -Fire caulk FW membrane penetration above garage
All Rough Inspection - Residential Failed 2/8/2023 2/8/2023 02/08/2023
Misc
Corrective Action Required
01/30/2023
**Provide firewall UL listing **Install 6 support studs for truss girder at bathroom per A-2 -1 hr soffit per plan 4011: -Windows in living room less than 18” above floor and more than 9 square feet shall be safety tempered glass windows **Glazing shall meet the requirement of R308.3.1, either class II of CPSC 16 CFR 1201 or class A of ANSI Z97.1 -Tie down support header outside front bedroom against uplift -Fire caulk all penetrations of firewall membrane -Connect csst gas line to rigid gas piping and retest **Pump air test pressure to min 10 psi 4013: -Windows in living room less than 18” above floor and more than 9 square feet shall be safety tempered glass windows **Glazing shall meet the requirement of R308.3.1, either class II of CPSC 16 CFR 1201 or class A of ANSI Z97.1 -Fire caulk all penetrations of firewall membrane **See rated assembly inspection 4015: -Windows in living room less than 18” above floor and more than 9 square feet shall be safety tempered glass windows **Glazing shall meet the requirement of R308.3.1, either class II of CPSC 16 CFR 1201 or class A of ANSI Z97.1 -Provide min 1” clearance from combustible around b-vent in chase **Cut out wood for min 1” clearance from b-vent -Fire caulk all penetrations of firewall membrane **Also see rated assembly inspection 4017: -Strap garage/bathroom bearing wall top plate where bored more than 50% **Nail strap holes. Min 4 nails each side of hole -Fire caulk all penetrations of firewall membrane
All Rough Inspection - Residential Failed 3/2/2023 3/2/2023 03/02/2023
Misc
Corrective Action Required
02/08/2023
4011: -Windows in living room less than 18” above floor and more than 9 square feet shall be safety tempered glass windows **Glazing shall meet the requirement of R308.3.1, either class II of CPSC 16 CFR 1201 or class A of ANSI Z97.1 4013: -Windows in living room less than 18” above floor and more than 9 square feet shall be safety tempered glass windows **Glazing shall meet the requirement of R308.3.1, either class II of CPSC 16 CFR 1201 or class A of ANSI Z97.1 -Install 6 support studs for truss girder at bathroom per A-2 4015: -Windows in living room less than 18” above floor and more than 9 square feet shall be safety tempered glass windows **Glazing shall meet the requirement of R308.3.1, either class II of CPSC 16 CFR 1201 or class A of ANSI Z97.1 -Install 6 support studs for truss girder at bathroom per A-2 4017:: -Windows in living room less than 18” above floor and more than 9 square feet shall be safety tempered glass windows **Glazing shall meet the requirement of R308.3.1, either class II of CPSC 16 CFR 1201 or class A of ANSI Z97.1
Rated Assembly Inspection Partial 3/2/2023 3/2/2023 03/02/2023
Miscellaneous Correction
Corrective Action Required
02/08/2023
-Attic firewall-OK
Rated Assembly Inspection Failed 3/7/2023 3/7/2023 03/07/2023
Miscellaneous Correction
Corrective Action Required
03/02/2023
-Attic firewall-OK -Dwelling firewall- Unit 4011 and 4017 only: Provide UL design for wall. Screw bottom edge to wall plate
All Rough Inspection - Residential Partial 3/16/2023 03/16/2023
Misc
Corrective Action Required
03/02/2023
All units: -Windows in living room less than 18” above floor and more than 9 square feet shall be safety tempered glass windows **Glazing shall meet the requirement of R308.3.1, either class II of CPSC 16 CFR 1201 or class A of ANSI Z97.1 **The submited evaluation report for the film summarized that the film applied to the glass only meet the Class 1 of CPSC and class A of ANSI standards
Rated Assembly Inspection Partial 3/16/2023 3/16/2023 03/16/2023
Miscellaneous Correction
Corrective Action Required
03/07/2023
-Attic firewall-OK -Dwelling firewall-1st layer OK
Driveway Inspection Partial 3/23/2023 3/23/2023 03/23/2023
Misc
Informational
03/23/2023
3-23-23 NS Site visited it appears that driveway and sidewalk meet city standards for pre-pour inspection. I will come back in a week and check the ADA once driveway and sidewalk have been poured.
Sidewalk Inspection Partial 3/23/2023 3/23/2023 03/23/2023
Misc
Informational
03/23/2023
3-23-23 NS Site visited it appears that driveway and sidewalk meet city standards for pre-pour inspection. I will come back in a week and check the ADA once driveway and sidewalk have been poured.
Driveway Inspection Partial 3/30/2023 3/30/2023 03/23/2023
Misc
Informational
03/23/2023
3-23-23 NS Site visited it appears that driveway and sidewalk meet city standards for pre-pour inspection. I will come back in a week and check the ADA once driveway and sidewalk have been poured.
Rated Assembly Inspection Failed 3/27/2023 3/27/2023 03/27/2023
Miscellaneous Correction
Corrective Action Required
03/16/2023
-Attic firewall-OK -Dwelling firewall-1st layer OK **For firewall between unit 4013&4015: Nail GB in laundry; need 2 layers at showers **Provide 2 layers at stairs (4013&4015)
Sidewalk Inspection Partial 3/30/2023 4/5/2023 04/06/2023
Misc
Informational
03/23/2023
3-23-23 NS Site visited it appears that driveway and sidewalk meet city standards for pre-pour inspection. I will come back in a week and check the ADA once driveway and sidewalk have been poured.
Driveway Inspection Passed 3/23/2023 4/10/2023 04/10/2023
Misc
Informational
03/23/2023
3-23-23 NS Site visited it appears that driveway and sidewalk meet city standards for pre-pour inspection. I will come back in a week and check the ADA once driveway and sidewalk have been poured. 4-10-23 NS Site visited and it appears Sidewalk passed city standards and ADA.
Sidewalk Inspection Passed 4/20/2023 4/25/2023 04/25/2023
Misc
Informational
04/06/2023
3-23-23 NS Site visited it appears that driveway and sidewalk meet city standards for pre-pour inspection. I will come back in a week and check the ADA once driveway and sidewalk have been poured. 4-25-23 NS Site visited and the Sidewalk that was out has been replaced. and it meets ADA. passed
Piers/Caissons Inspection - Residential Partial 6/5/2023 (9:15) 6/5/2023 06/05/2023
Misc
Corrective Action Required
06/05/2023
FIX AND REROUTE DAMAGED GAS LINE AT UNIT 4011 DECK PIER HOLE. OK TO POUR ALL OTHER PIER HOLES
Plot Plan Inspection Failed 8/31/2023 08/31/2023
Misc
Corrective Action Required
08/31/2023
-Grading must slope away from building -Provide min 6” clearance from window trim to grade
Occupancy Inspection - Codes Residential Failed 8/31/2023 8/31/2023 08/31/2023
Misc
Corrective Action Required
08/31/2023
-Missing railing to basement -Seal exterior wall penetration at sump pump discharge pipe -Address holes in fire rated assembly basement north side -Downspout not connected to extension tube at the front of the house
Misc
Informational
08/31/2023
-Khan to review engineering letter regarding window film 8/31/23 AF
Piers/Caissons Inspection - Residential Passed 09/27/2023
Misc
Resolved
09/27/2023
FIX AND REROUTE DAMAGED GAS LINE AT UNIT 4011 DECK PIER HOLE. OK TO POUR ALL OTHER PIER HOLES
Erosion Control Inspection Residential Passed 09/27/2023
DCM2 ESC DEFICIENT INSTALLATION
Resolved
09/27/2023
10-17-22 -DEFICIENT EROSION CONTROL INSTALLATION ALONG THE STREET. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -CLEAN DEBRIS FROM STREETS AND STORM INLETS
Occupancy Inspection - Codes Residential Failed 9/27/2023 9/27/2023 09/27/2023
Misc
Corrective Action Required
08/31/2023
UNIT 4017 only: -Provide two 1/2” through bolts at each deck beam-post connection -Windows in living room less than 18” above floor and more than 9 square feet shall be safety tempered glass windows **Glazing shall meet the requirement of R308.3.1, either class II of CPSC 16 CFR 1201 or class A of ANSI Z97.1 **The submited evaluation report for the film summarized that the film applied to the glass only meet the Class 1 of CPSC 16 CFR 1201 and class B of ANSI Z97.1 standards
Occupancy Inspection - Codes Residential Ready for Temp CO 10/5/2023 10/05/2023
Misc
Corrective Action Required
09/27/2023
UNIT 4017 only: -Provide two 1/2” through bolts at each deck beam-post connection -Windows in living room less than 18” above floor and more than 9 square feet shall be safety tempered glass windows **Glazing shall meet the requirement of R308.3.1, either class II of CPSC 16 CFR 1201 or class A of ANSI Z97.1 **The submited evaluation report for the film summarized that the film applied to the glass only meet the Class 1 of CPSC 16 CFR 1201 and class B of ANSI Z97.1 standards **TCO approved for unit 4017
Occupancy Inspection - Codes Residential Failed 1/9/2024 1/9/2024 01/09/2024
Misc
Corrective Action Required
10/05/2023
UNIT 4017 only: -Provide two 1/2” through bolts at each deck beam-post connection UNIT 4011: -Exterior not inspected at this time -Install a missing long screw at deck door jamb brace -Bond gas piping -Protect penetration of firewall -Verify the screw/nailing pattern of firewall **TCO approved for unit 4017
Occupancy Inspection - Codes Residential Failed 1/11/2024 1/11/2024 01/11/2024
Misc
Corrective Action Required
01/09/2024
UNIT 4017 only: -Provide two 1/2” through bolts at each deck beam-post connection UNIT 4011: -Exterior not inspected at this time -Verify the screw/nailing pattern of firewall **TCO approved for units 4017
Occupancy Inspection - Codes Residential Ready for Temp CO 1/12/2024 1/12/2024 01/12/2024
Misc
Corrective Action Required
01/11/2024
UNIT 4017 only: -Provide two 1/2” through bolts at each deck beam-post connection UNIT 4011: -Exterior not inspected at this time **TCO approved for units 4011 and 4017
Rated Assembly Inspection Passed 2/13/2024 2/13/2024 02/13/2024
Miscellaneous Correction
Resolved
02/13/2024
-Attic firewall-OK -Dwelling firewall-1st layer OK **For firewall between unit 4013&4015: Nail GB in laundry; need 2 layers at showers **Provide 2 layers at stairs (4013&4015)
All Rough Inspection - Residential Passed 1/8/2024 02/13/2024
Misc
Resolved
02/13/2024
All units: -Windows in living room less than 18” above floor and more than 9 square feet shall be safety tempered glass windows **Glazing shall meet the requirement of R308.3.1, either class II of CPSC 16 CFR 1201 or class A of ANSI Z97.1 **The submited evaluation report for the film summarized that the film applied to the glass only meet the Class 1 of CPSC and class A of ANSI standards
Occupancy Inspection - Codes Residential Failed 2/13/2024 02/13/2024
Misc
Corrective Action Required
01/12/2024
UNIT 4017 only: -Provide two 1/2” through bolts at each deck beam-post connection; nail all deck joist hangers UNIT 4013: -Lawn irrigation permit required -Label all electrical service disconnect breakers -Grading at rear shall slope away from building -Clearance to basement egress window trim shall be min 6” -Provide two 1/2” through bolts at each deck-post connection -Seal around receptacle below deck -Reinforce deck guardrail middle post -Support csst gas line every 48” -Provide min 1.5” clearance from handrail to obstructions -Provide a receptacle within 3 ft of the master bathroom sink supplied by the required 20-amp bathroom sink circuit UNIT 4011: -Exterior not inspected at this time **TCO approved for units 4011 and 4017
Occupancy Inspection - Codes Residential Failed 3/26/2024 3/26/2024 03/26/2024
Misc
Corrective Action Required
02/13/2024
**Clean off all construction-related debris from rear of lot UNIT 4017 only: -Provide two 1/2” through bolts at each deck beam-post connection; nail all deck joist hangers UNIT 4015: -Install rear flood light -Support upper ends of deck stair stringers to header joist -Screw deck ledger every 14” minimum -Deck receptacle not gfci-protected -Install anti-tipping device for kitchen range -Support half bathroom receptacle yoke -Provide 2-hour fire separation above electrical panel and at I beam pockets UNIT 4013: -Label all electrical service disconnect breakers -Grading at rear shall slope away from building -Clearance to basement egress window trim shall be min 6” -Provide two 1/2” through bolts at each deck-post connection -Seal around receptacle below deck -Reinforce deck guardrail middle post -Support csst gas line every 48” -Provide min 1.5” clearance from handrail to obstructions -Provide a receptacle within 3 ft of the master bathroom sink supplied by the required 20-amp bathroom sink circuit UNIT 4011: -Provide two 1/2” through bolts at each deck beam-post connection; nail all deck joist hangers **TCO approved for units 4011 and 4017 only
Occupancy Inspection - Codes Residential Ready for Temp CO 3/29/2024 3/29/2024 03/29/2024
Misc
Corrective Action Required
03/26/2024
**Clean off all construction-related debris from rear of lot UNIT 4017 only: -Provide two 1/2” through bolts at each deck beam-post connection; provide galvanized bolts/nut/washer; nail all deck joist hangers UNIT 4015-OK UNIT 4013: -Label all electrical service disconnect breakers -Grading at rear shall slope away from building -Clearance to basement egress window trim shall be min 6” -Provide two 1/2” through bolts at each deck-post connection -Seal around receptacle below deck -Reinforce deck guardrail middle post -Support csst gas line every 48” -Provide min 1.5” clearance from handrail to obstructions -Provide a receptacle within 3 ft of the master bathroom sink supplied by the required 20-amp bathroom sink circuit UNIT 4011: -Provide two 1/2” through bolts at each deck beam-post connection; provide galvanized bolts/nut/washer; nail all deck joist hangers **TCO approved for units 4011, 4015, and 4017 only
Plot Plan Inspection Passed 05/02/2024
Misc
Resolved
05/02/2024
-Grading must slope away from building -Provide min 6” clearance from window trim to grade
Occupancy Inspection - Codes Residential Failed 5/2/2024 5/2/2024 05/02/2024
Misc
Corrective Action Required
03/29/2024
UNIT 4017-Lower water meter to grade level UNIT 4011 to 4015-OK
Occupancy Inspection - Codes Residential Full C of O 5/3/2024 05/03/2024
Misc
Resolved
05/03/2024
UNIT 4017-Lower water meter to grade level UNIT 4011 to 4015-OK
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home