Summary
PRRES20214943
Building Permit - Residential
Certificate of Occupancy
KEVIN HIGDON CONSTRUCTION LLC
NEW SINGLE FAMILY
NEW HOUSE. FINISHED WALKOUT BASEMENT. COVERED DECK.
09/21/2021
09/28/2021
02/28/2024
Locations
Contacts
KEVIN HIGDON CONSTRUCTION, LLC, Address:P O BOX 847, Phone:(816) 524-9797  
KEVIN@HIGDONBUILDERS.COM  
KEVIN HIGDON CONSTRUCTION LLC, Address:PO BOX 847, Phone:(816) 524-9797  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
INTERSTATE CONSTRUCTION SERVICES, Address:1450 SE BROADWAY DR, Phone:(816) 524-9797  
MILLER PLUMBING CO, Address:PO BOX 393 , Phone:(913) 851-1333  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,189.86 $1,189.86 Paid 09/28/2021
8331401-Water Tap Fee $3,655.00 $3,655.00 Paid 09/28/2021
8350015-Water Meter Fee $479.24 $479.24 Paid 09/28/2021
8331504-EFHB Middle Big Creek, Full $636.12 $636.12 Paid 09/28/2021
8331507-Sewer Connection Fee $570.00 $570.00 Paid 09/28/2021
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 09/28/2021
7232302-Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 09/28/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 07/27/2022
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 07/28/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Partial 10/21/2021 (1:30) 10/21/2021 10/21/2021
Misc
Corrective Action Required
10/21/2021
UPLOAD ENGINEER REPORT TO PERMIT THAT WAS ON SITE AT INSPECTION CONCERNING SOIL CONDITIONS
Sewer Service Inspection - R Passed 11/30/2021 (8:00) 11/30/2021 11/30/2021
Water Service Inspection - R Partial 11/30/2021 11/30/2021 11/30/2021
Underslab Plumbing Inspection - Residential Passed 12/1/2021 12/1/2021 12/01/2021
Water Service Inspection - R Passed 12/1/2021 (1:00) 12/1/2021 12/01/2021
All Rough Inspection - Residential Failed 4/7/2022 4/7/2022 04/07/2022
Misc
Corrective Action Required
04/07/2022
**REPAIR EROSION CONTROL ALONG THE STREET AND PROPERTY LINE -Nail/staple ZIP board to sill plates per code -Garage PFH wall anchor must be located within middle 1/3 of sill plate -Provide full support for front porch roof beam at garage and bedroom 2 walls -Support top of valley and hip rafter at ridge (above garage) -Fb plate opening at mud/closet wall; Fb triangular wall spaces at master shower from roof -Engineer to address rafter connections to wall per chapter 8 IRC 802.11 -Support ridge above deck -Strap rear dining CSPF wall header and nail siding to header and rim band per A/4 detail -Provide wall receptacle spacing per code. FYI: the non-sliding panel of the slide door is considered a wall space where receptacle spacing requirement is applicable -Support valley rafter at upper end above kitchen island -Provide information on capacity of the hanger of the 12”-18” lvl connection -Provide a receptacle at stair rail -Install hanger at 2x12 beam connection to lvl above foyer/refrigerator wall -Support ridge above entry door and foyer; or install rafter ties -Install rafter ties above bedroom 2 -Brace ends of lvl beams from rotation -Fb basement wall from ceiling space and soffit throughout; Fb space between back-back showers -Anchor basement sill plate per code. Min 2 anchors per short plate -Install basement walkout door; complete framing near door -Provide safety tempered glass window near door -Seal penetrations of ceiling joist return air space -Provide wall receptacle spacing per code for basement bedroom 4 -Pan off return air space from dead space between basement showers. See fire blocking above -Blocking underneath 18” lvl point load **DO NOT INSULATE
Electrical Service Inspection Failed 4/7/2022 4/7/2022 04/07/2022
Misc
Corrective Action Required
04/07/2022
Provide grounding clamp listed for aluminum conductor
Gas Service Inspection - Residential Failed 4/7/2022 4/7/2022 04/07/2022
Misc
Corrective Action Required
04/07/2022
No pressure
Erosion Control Inspection Residential Failed 04/21/2022
DCM5 ESC INSP DENIED
Corrective Action Required
04/21/2022
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION.
All Rough Inspection - Residential Not Ready 4/21/2022 4/21/2022 04/21/2022
Misc
Corrective Action Required
04/07/2022
**4/21/22- NOT READY, ADDRESS EROSION CONTROL PER LAST INSPECTION BEFORE ANY FURTHER INSPECTIONS **REPAIR EROSION CONTROL ALONG THE STREET AND PROPERTY LINE -Nail/staple ZIP board to sill plates per code -Garage PFH wall anchor must be located within middle 1/3 of sill plate -Provide full support for front porch roof beam at garage and bedroom 2 walls -Support top of valley and hip rafter at ridge (above garage) -Fb plate opening at mud/closet wall; Fb triangular wall spaces at master shower from roof -Engineer to address rafter connections to wall per chapter 8 IRC 802.11 -Support ridge above deck -Strap rear dining CSPF wall header and nail siding to header and rim band per A/4 detail -Provide wall receptacle spacing per code. FYI: the non-sliding panel of the slide door is considered a wall space where receptacle spacing requirement is applicable -Support valley rafter at upper end above kitchen island -Provide information on capacity of the hanger of the 12”-18” lvl connection -Provide a receptacle at stair rail -Install hanger at 2x12 beam connection to lvl above foyer/refrigerator wall -Support ridge above entry door and foyer; or install rafter ties -Install rafter ties above bedroom 2 -Brace ends of lvl beams from rotation -Fb basement wall from ceiling space and soffit throughout; Fb space between back-back showers -Anchor basement sill plate per code. Min 2 anchors per short plate -Install basement walkout door; complete framing near door -Provide safety tempered glass window near door -Seal penetrations of ceiling joist return air space -Provide wall receptacle spacing per code for basement bedroom 4 -Pan off return air space from dead space between basement showers. See fire blocking above -Blocking underneath 18” lvl point load **DO NOT INSULATE
All Rough Inspection - Residential Failed 4/26/2022 04/26/2022
Misc
Corrective Action Required
04/21/2022
-Garage PFH wall anchor must be located within middle 1/3 of sill plate -Support ridge above deck -Strap rear dining CSPF wall header and nail siding to header and rim band per A/4 detail (CHECK EXTERIOR NAILING AT REINSPECTION) -Provide information on capacity of the hanger of the 12”-18” lvl connection **OK TO INSULATE**
Erosion Control Inspection Residential Partial 4/26/2022 4/26/2022 04/26/2022
DCM5 ESC INSP DENIED
Resolved
04/26/2022
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION.
All Rough Inspection - Residential Passed 4/28/2022 04/28/2022
Misc
Resolved
04/28/2022
Erosion Control Inspection Residential Partial 4/28/2022 4/28/2022 04/28/2022
Driveway Inspection Partial 6/15/2022 6/15/2022 06/15/2022
Misc
Informational
06/15/2022
On 6.15.2022 I performed a driveway inspection and pass the subgrade to pour concrete.
Sidewalk Inspection Partial 6/15/2022 6/15/2022 06/15/2022
Misc
Informational
06/15/2022
On 6.15.2022 I performed a sidewalk inspection and pass the subgrade to pour concrete.
Electrical Service Inspection Passed 7/21/2022 7/21/2022 07/21/2022
Misc
Resolved
07/21/2022
Provide grounding clamp listed for aluminum conductor
Gas Service Inspection - Residential Passed 7/21/2022 7/21/2022 07/21/2022
Misc
Resolved
07/21/2022
No pressure
Piers/Caissons Inspection - Residential Passed 7/27/2022 7/27/2022 07/27/2022
Misc
Corrective Action Required
07/27/2022
APPROVED PER CHAD M STREETER 6/15/22
Erosion Control Inspection Residential Failed 7/27/2022 7/27/2022 07/27/2022
Misc
Corrective Action Required
07/27/2022
-Maintain erosion control on lot until sod is placed
Occupancy Inspection - Codes Residential Failed 7/27/2022 7/27/2022 07/27/2022
Misc
Corrective Action Required
07/27/2022
-maintain erosion control on lot until sod is placed -resolve outstanding inspection fee -resolve outstanding item from footing inspection “UPLOAD ENGINEER REPORT TO PERMIT THAT WAS ON SITE AT INSPECTION CONCERNING SOIL CONDITIONS” -final driveway and sidewalk inspections required, contact development services to schedule -provide address numbers on house -submit revised plot plan to show retaining wall at rear and any changes concerning slope and grade of lot -final grade and sod -gutters and downspouts -splash blocks -complete spindles and handrail basement stairs -garage door must be self closing -basement bedroom egress window max 44” AFF to net clear window opening -nail off all joist hangers at deck -(2) 1/2 through bolts required each post/beam connection at deck
Footing Inspection - Residential Passed 7/28/2022 7/28/2022 07/28/2022
Misc
Resolved
07/28/2022
UPLOAD ENGINEER REPORT TO PERMIT THAT WAS ON SITE AT INSPECTION CONCERNING SOIL CONDITIONS
Occupancy Inspection - Codes Residential Ready for Temp CO 7/28/2022 7/28/2022 07/28/2022
Misc
Corrective Action Required
07/27/2022
-final driveway and sidewalk inspections required, contact development services to schedule -submit revised plot plan to show retaining wall at rear and any changes concerning slope and grade of lot -final grade and sod -gutters and downspouts -splash blocks
Occupancy Inspection - Codes Residential Temporary C of O 07/28/2022
Misc
Resolved
02/28/2024
-final driveway and sidewalk inspections required, contact development services to schedule -submit revised plot plan to show retaining wall at rear and any changes concerning slope and grade of lot -final grade and sod -gutters and downspouts -splash blocks
Plot Plan Inspection Passed 8/11/2022 08/11/2022
Misc
Resolved
08/11/2022
Driveway Inspection Passed 11/2/2022 11/2/2022 11/02/2022
Misc
Informational
06/15/2022
On 6.15.2022 I performed a driveway inspection and pass the subgrade to pour concrete. 11-2-22 RH. Meets LS and ADA specification.
Sidewalk Inspection Passed 11/2/2022 11/2/2022 11/02/2022
Misc
Informational
06/15/2022
On 6.15.2022 I performed a sidewalk inspection and pass the subgrade to pour concrete. 11-2-22 RH. Meets LS and ADA specification.
Occupancy Inspection - Codes Residential Full C of O 02/28/2024
Misc
Resolved
02/28/2024
-final driveway and sidewalk inspections required, contact development services to schedule -submit revised plot plan to show retaining wall at rear and any changes concerning slope and grade of lot -final grade and sod -gutters and downspouts -splash blocks
Documents & Images
Date Uploaded File Type Document Name
09/22/2021 Application Form APPLICATION
09/22/2021 Application Form EXCISE TAX FORM
09/24/2021 Permit Codes Residential Plan Review
09/27/2021 Approved Plans APPROVED DRAWINGS
09/28/2021 Plot Plan APPROVED PLOT PLAN
09/28/2021 Permit Codes Residential Plan Review
09/28/2021 Permit DS Building Permit
09/28/2021 Receipt Receipt for transaction:2021-007644
10/21/2021 Letter INSPECTION SUMMARY
11/30/2021 Letter INSPECTION SUMMARY
11/30/2021 Letter INSPECTION SUMMARY
12/01/2021 Letter INSPECTION SUMMARY
12/01/2021 Letter INSPECTION SUMMARY
04/07/2022 Letter INSPECTION SUMMARY
04/07/2022 Letter INSPECTION SUMMARY
04/07/2022 Letter INSPECTION SUMMARY
04/21/2022 3RD Party Insp Report 1721 Blackstone
04/21/2022 Letter INSPECTION SUMMARY
04/21/2022 Letter INSPECTION SUMMARY
04/26/2022 Letter INSPECTION SUMMARY
04/26/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
06/15/2022 Letter INSPECTION SUMMARY
06/15/2022 Letter INSPECTION SUMMARY
07/21/2022 3RD Party Insp Report 1721 SW Blackstone Pl_DECK PIER INSP_2022-06-15 (002)
07/21/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/27/2022 Letter INSPECTION SUMMARY
07/27/2022 Letter INSPECTION SUMMARY
07/27/2022 Letter INSPECTION SUMMARY
07/27/2022 3RD Party Insp Report 1721 SW BLACKSTONE PL SOIL
07/27/2022 Receipt Receipt for transaction:2022-006175
07/28/2022 Letter INSPECTION SUMMARY
07/28/2022 Receipt Receipt for transaction:2022-006192
07/28/2022 Letter Codes Temporary Certificate of Occupancy
08/10/2022 Plot Plan APPROVED AS GRADED PLOT PLAN
08/11/2022 Letter INSPECTION SUMMARY
11/02/2022 Letter INSPECTION SUMMARY
11/02/2022 Letter INSPECTION SUMMARY
03/22/2023 Letter Codes 140 Day Letter
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home