Permit Application Status

PRRES20213111


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20213111
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - COVERED DECK - UNFINISHED BASEMENT (ADDED BASEMENT FINISH 11/4/21)
06/17/2021
06/28/2021
12/21/2021
05/04/2022
Locations
Contacts
Kevin Hardee Homes LLC, Address:705 SW Admiral Byrd Court  
KEVIN.HARDEE@GMAIL.COM  
BALANCE POINT HEATING & COOLING INC, Address:PO Box 1233, Phone:(816) 265-0448  
Brads electric LLC, Address:12403 white oak street  
JT'S HOME REPAIR & REMODELING LLC, Address:7503 RYMEG CIR, Phone:(913) 515-8925  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Right of Way Permit Fee $80.00 $80.00 Paid 06/28/2021
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 06/28/2021
8331504-EFHB Middle Big Creek, Full $401.76 $401.76 Paid 06/28/2021
8331507-Sewer Connection Fee $360.00 $360.00 Paid 06/28/2021
Water Tap Fee $3,581.00 $3,581.00 Paid 06/28/2021
Water Meter Fee $455.54 $455.54 Paid 06/28/2021
Valuation Fee New Single Family $1,096.05 $1,096.05 Paid 06/28/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 7/7/2021 (11:00) 7/7/2021 07/07/2021
Erosion Control Inspection Residential Failed 7/7/2021 7/7/2021 07/07/2021
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
07/07/2021
DEFICIENT EROSION CONTROL INSTALLATION. EROSION CONTROL REQ AT FRONT OF LOT, MAINTAIN SILT FENCE AT LOT PERIMETER
Underslab Plumbing Inspection - Residential Passed 8/13/2021 08/17/2021
Misc
Resolved
08/17/2021
-Cannot use 3" waste stack to vent the shower trap. Vent the whole bath group per code. FYI: You can install dry vent for the shower trap, then wet-vent the toilet before connecting to the buildsing drain
Underslab Plumbing Inspection - Residential Passed 8/17/2021 8/17/2021 08/17/2021
Misc
Resolved
08/17/2021
Sewer Service Inspection - R Passed 8/18/2021 (1:00) 8/18/2021 08/18/2021
Water Service Inspection - R Passed 8/20/2021 (2:00) 8/20/2021 08/20/2021
Electrical Service Inspection Failed 10/11/2021 10/11/2021 10/11/2021
Misc
Corrective Action Required
10/11/2021
-Color code/label GEC at service panel
Gas Service Inspection - Residential Passed 10/11/2021 10/11/2021 10/11/2021
Misc
Resolved
10/11/2021
All Rough Inspection - Residential Failed 10/11/2021 10/11/2021 10/11/2021
Misc
Corrective Action Required
10/11/2021
-Protect NM within 6’ of attic access garage -structural straps required at all top plate bores 50% or more of plate width at all exterior walls and interior load bearing walls -Secure all vertical DWV 2” or less at mid point -add stud shoe laundry DWV stud penetration -fireblock dryer duct laundry side and strap top plate -vent all bath exhaust fans to exterior -Bocca protection plate DWV top and bottom plate at laundry -bump out for pex lines at laundry wall -add stud shoes at SEC cable stud penetrations garage wall -overbored studs for SEC cable garage wall -stud shoes master bath exterior wall DWV stud penetrations -Install exterior doors -Fireblock behind and between studs at 1st floor fireplace bump out, open to attic space above -seal low volt penetration at fireplace lid and bottom plate -Dbl top plate requires no less than 24” offset between plate breaks- strap top plate- see kitchen exterior wall, great room -Fireblock between studs at kitchen window header that will be open to attic space above -seal top plate and bottom plate penetrations throughout - low volt being installed at time of inspection -Fireblock cantilever at garage open to basement -complete framing at patio fireplace -color code/label GEC at service panel
Electrical Service Inspection Passed 10/13/2021 10/13/2021 10/13/2021
Misc
Resolved
10/13/2021
All Rough Inspection - Residential Failed 10/13/2021 10/13/2021 10/13/2021
Misc
Corrective Action Required
10/11/2021
-complete framing at patio fireplace **OK TO INSULATE AND ROCK**
Piers/Caissons Inspection - Residential Passed 11/18/2021 (9:30) 11/18/2021 11/18/2021
Driveway Inspection Passed 11/18/2021 11/18/2021 11/18/2021
Misc
Informational
11/18/2021
On Thursday 11/18/2021 I conducted a driveway inspection and pass the subgrade to pour concrete
All Rough Inspection - Residential Failed 11/19/2021 12/6/2021 12/06/2021
Misc
Corrective Action Required
10/13/2021
**BASEMENT FINISH ADDED** -FIREBLOCK CHASE AT BASMENT BATH -UFER WILL NEED TO REMAIN ACCESSIBLE AT FINISH, BASEMENT BATH -UFER, REPLACE ACORN STYLE CLAMP WITH CLAMP LISTED FOR REBAR, SEPARATION AT UFER WITH GEC CONDUCTOR
All Rough Inspection - Residential Passed 12/20/2021 12/20/2021 12/20/2021
Misc
Resolved
12/20/2021
Erosion Control Inspection Residential Passed 12/20/2021 12/20/2021 12/20/2021
DCM2 ESC DEFICIENT INSTALLATION
Resolved
12/20/2021
DEFICIENT EROSION CONTROL INSTALLATION. EROSION CONTROL REQ AT FRONT OF LOT, MAINTAIN SILT FENCE AT LOT PERIMETER
Occupancy Inspection - Codes Residential Failed 12/20/2021 12/20/2021 12/20/2021
Misc
Corrective Action Required
12/20/2021
-Final sidewalk inspection required, contact development services to schedule -move construction material in garage to allow for all receptacles to be tested -washing machine receptacle requires GFCI protection -great room floor receptacles must be type listed for application that protects from damage, dirt and moisture. No setback allowed with combustible material at great room floor receptacle boxes, adjust box depth or install spark rings -hammer arrestor required at dishwasher -dishwasher receptacle requires GFCI protection -secure main water line to foundation wall -anti siphon required at spigot main water line basement -install faceplate at sump pump receptacle -hot water heater discharge pipe, min 2X pipe diameter to max 6” AFF -Install ladder basement bedroom egress well -complete finished basement -UFER at basement bath will need to remain accessible at finish, basement bath UFER and UFER at unfinished basement for gas bond, replace acorn style clamps with clamps listed for rebar, separation of dissimilar metals of UFER and GEC conductor -complete stone/siding front of house -Install gutters and downspouts -splash blocks at all downspout and sump pump discharge locations, min 36” distance from foundation -secure AC electrical whip within 12” of disconnect -Tamper resistant valve caps required at AC compressor -Address several areas throughout foundation perimeter where sod is less than 6” from siding -seal all penetrations in siding, seal along top of AC disconnect and meter can -ensure 6” of fall within the first 10’ of foundation
Sidewalk Inspection Passed 11/19/2021 12/21/2021
Misc
Informational
11/19/2021
On 11/19/2021 I performed a sidewalk inspection and pass the subgrade to pour concrete
Misc
Informational
12/21/2021
On Tuesday, 12-21-2021. I performed a visual inspection on the sidewalk at this location and found the finish and grade elevation to pass standards for city sidewalk installation.
Occupancy Inspection - Codes Residential Failed 12/22/2021 12/22/2021 12/22/2021
Misc
Corrective Action Required
12/20/2021
Correct below for TCO -great room floor receptacles must be type listed for application that protects from damage, dirt and moisture. Recessed type with cover to protect receptacle -install faceplate at sump pump receptacle Complete below for c of o -complete basement finish -complete stone/siding front of house -Install gutters and downspouts -splash blocks at all downspout and sump pump discharge locations, min 36” distance from foundation -Address several areas throughout foundation perimeter where sod is less than 6” from siding -seal all penetrations in siding, seal along top of AC disconnect and meter can -ensure 6” of fall within the first 10’ of foundation (check at reinspect)
Occupancy Inspection - Codes Residential Temporary C of O 12/28/2021 12/28/2021 12/28/2021
Misc
Corrective Action Required
12/22/2021
-complete basement finish (FINAL INSPECTION REQUIRED) -complete stone/siding front of house -Install gutters and downspouts -splash blocks at all downspout and sump pump discharge locations, min 36” distance from foundation -Address several areas throughout foundation perimeter where sod is less than 6” from siding -seal all penetrations in siding, seal along top of AC disconnect and meter can -ensure 6” of fall within the first 10’ of foundation (check at reinspect) OK FOR TCO - TCO EXPIRES 2/11/22- IT IS BUILDERS RESPONSIBLITY TO SCHEDULE INSPECTION AND BE AVAILABLE FOR FINAL INSPECTION OF BASEMENT AND NOT HOMEOWNERS
Plot Plan Inspection Passed 5/4/2022 5/4/2022 05/04/2022
Occupancy Inspection - Codes Residential Full C of O 5/4/2022 5/4/2022 05/04/2022
Misc
Resolved
05/04/2022
Documents & Images
Date Uploaded File Type Document Name
06/17/2021 Plot Plan APPROVED PLOT PLAN
06/17/2021 Permit Codes Residential Plan Review
06/24/2021 Permit Codes Residential Plan Review
06/25/2021 Mike-Hubb-Plans_rev062521
06/25/2021 Approved Plans APPROVED PLANS
06/25/2021 Permit Codes Residential Plan Review
06/28/2021 Permit DS Building Permit
06/28/2021 Receipt Receipt for transaction:2021-005071
07/07/2021 Letter INSPECTION SUMMARY
07/07/2021 Letter INSPECTION SUMMARY
08/13/2021 Letter INSPECTION SUMMARY
08/17/2021 Letter INSPECTION SUMMARY
08/17/2021 Letter INSPECTION SUMMARY
08/17/2021 Letter INSPECTION SUMMARY
08/18/2021 Letter INSPECTION SUMMARY
08/20/2021 Letter INSPECTION SUMMARY
10/11/2021 Letter INSPECTION SUMMARY
10/11/2021 Letter INSPECTION SUMMARY
10/11/2021 Letter INSPECTION SUMMARY
10/13/2021 Letter INSPECTION SUMMARY
10/13/2021 Letter INSPECTION SUMMARY
11/04/2021 Application Form APPLICATION
11/05/2021 07_Mike-Hubb-Residence_Bsmt-Finish
11/08/2021 Approved Plans APPROVED BASEMENT FINISH
11/18/2021 Letter INSPECTION SUMMARY
11/18/2021 Letter INSPECTION SUMMARY
11/19/2021 Letter INSPECTION SUMMARY
12/06/2021 Letter INSPECTION SUMMARY
12/20/2021 Letter INSPECTION SUMMARY
12/20/2021 Letter INSPECTION SUMMARY
12/20/2021 Letter INSPECTION SUMMARY
12/21/2021 Letter INSPECTION SUMMARY
12/21/2021 Letter INSPECTION SUMMARY
12/22/2021 Letter INSPECTION SUMMARY
12/28/2021 Letter Codes Temporary Certificate of Occupancy
05/04/2022 Letter INSPECTION SUMMARY
05/04/2022 Letter Field Certificate of Occupancy
05/04/2022 Letter Codes Final Certificate of Occupancy
10/15/2024 240113-84-JH layoutTrusses
10/15/2024 I67919649_240113-84-JH-R-Trusses
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home