Permit Application Status

PRRES20212916


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20212916
Building Permit - Residential
Certificate of Occupancy
HUNT MIDWEST RESIDENTIAL LLC
NEW SINGLE FAMILY
NEW HOUSE - FINISHED AND UNFINISHED BASEMENT - COVERED DECK - SUSPENDED SLAB
06/07/2021
06/15/2021
12/05/2021
08/26/2022
Locations
Contacts
SAB CONSTRUCTION INC, Address:PO BOX 942, Phone:(816) 524-3855  
CURTIS@SABHOMES.COM  
HUNT MIDWEST RESIDENTIAL LLC, Address:8300 NE UNDERGROUND DR  
MIKE BRYANT HEATING & COOLING , Address:1711 E 123RD , Phone:(913) 441-7807  
C-R ELECTRICAL LLC, Address:4539 RIDGEWAY, Phone:(816) 803-3500  
GARRISON PLUMBING, Address:15430 S MAHAFFIE ST STE 102, Phone:(913) 768-1311  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 06/15/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 06/15/2021
8331507-Sewer Connection Fee $420.00 $420.00 Paid 06/15/2021
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 06/15/2021
8350015-Water Meter Fee $455.54 $455.54 Paid 06/15/2021
9110078-Valuation Fee New Single Family $1,097.27 $1,097.27 Paid 06/15/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 08/25/2022
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 08/25/2022
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 08/25/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Residential Failed 10/8/2021 10/8/2021 10/08/2021
Misc
Corrective Action Required
10/08/2021
INSPECTION DENIED -POST ADDRESS -MAINTAIN EROSION CONTROL AT FRONT OF LOT, CLEAN ANY MUD/GRAVEL FROM STREET AT STORM INLET
Erosion Control Inspection Residential Failed 10/8/2021 10/8/2021 10/08/2021
Misc
Corrective Action Required
10/08/2021
-MAINTAIN EROSION CONTROL AT FRONT OF LOT, CLEAN ANY MUD/GRAVEL FROM STREET AT STORM INLET
Underslab Plumbing Inspection - Residential Passed 10/25/2021 10/25/2021 10/25/2021
Misc
Corrective Action Required
10/08/2021
INSPECTION DENIED -POST ADDRESS -MAINTAIN EROSION CONTROL AT FRONT OF LOT, CLEAN ANY MUD/GRAVEL FROM STREET AT STORM INLET
Piers/Caissons Inspection - Residential Passed 10/26/2021 (10:15) 10/26/2021 10/26/2021
Sewer Service Inspection - R Passed 12/7/2021 (10:00) 12/7/2021 12/07/2021
Water Service Inspection - R Passed 12/7/2021 (1:45) 12/7/2021 12/07/2021
Erosion Control Inspection Residential Failed 3/23/2022 03/23/2022
Misc
Resolved
03/23/2022
-MAINTAIN EROSION CONTROL AT FRONT OF LOT, CLEAN ANY MUD/GRAVEL FROM STREET AT STORM INLET
DCM5 ESC INSP DENIED
Corrective Action Required
03/23/2022
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION. -see front of lot & storm drain
Electrical Service Inspection Failed 3/23/2022 3/23/2022 03/23/2022
Misc
Corrective Action Required
03/23/2022
inspection denied due to erosion control
Gas Service Inspection - Residential Failed 3/23/2022 3/23/2022 03/23/2022
Misc
Corrective Action Required
03/23/2022
inspection denied due to erosion control.
All Rough Inspection - Residential Failed 3/23/2022 3/23/2022 03/23/2022
Misc
Corrective Action Required
03/23/2022
inspection denied due to erosion control.
Erosion Control Inspection Residential Failed 3/31/2022 03/31/2022
DCM5 ESC INSP DENIED
Corrective Action Required
03/23/2022
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION. -see front of lot & storm drain
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/31/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. see front of lot and storm box
All Rough Inspection - Residential Not Ready 3/31/2022 3/31/2022 03/31/2022
Misc
Corrective Action Required
03/23/2022
inspection denied due to erosion control. erosion control still not in compliance Mitchell Schwarz 03/31/2022 1:27 PM
Gas Service Inspection - Residential Failed 3/31/2022 3/31/2022 03/31/2022
Misc
Corrective Action Required
03/23/2022
inspection denied due to erosion control.
Electrical Service Inspection Failed 3/31/2022 3/31/2022 03/31/2022
Misc
Corrective Action Required
03/23/2022
inspection denied due to erosion control
All Rough Inspection - Residential Not Ready 4/8/2022 4/8/2022 04/08/2022
Misc
Corrective Action Required
03/31/2022
inspection denied due to erosion control. erosion control still not in compliance Mitchell Schwarz 03/31/2022 1:27 PM
Gas Service Inspection - Residential Failed 4/8/2022 4/8/2022 04/08/2022
Misc
Corrective Action Required
03/31/2022
inspection denied due to erosion control.
Electrical Service Inspection Failed 4/8/2022 4/8/2022 04/08/2022
Misc
Corrective Action Required
03/31/2022
inspection denied due to erosion control
Erosion Control Inspection Residential Failed 4/8/2022 04/08/2022
DCM5 ESC INSP DENIED
Corrective Action Required
03/31/2022
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION. -see front of lot & storm drain
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/31/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. see front of lot and storm box
Misc
Corrective Action Required
04/08/2022
top of storm sewer covered in mud with mud running into storm sewer DO NOT SCHEDULE until erosion control is in compliance
Gas Service Inspection - Residential Failed 4/19/2022 4/19/2022 04/19/2022
Misc
Resolved
04/19/2022
inspection denied due to erosion control.
Misc
Corrective Action Required
04/19/2022
provide 10 psi at gas gauge for inspection
Electrical Service Inspection Passed 4/19/2022 4/19/2022 04/19/2022
Misc
Resolved
04/19/2022
inspection denied due to erosion control
All Rough Inspection - Residential Failed 4/19/2022 4/19/2022 04/19/2022
Misc
Resolved
04/19/2022
inspection denied due to erosion control. erosion control still not in compliance Mitchell Schwarz 03/31/2022 1:27 PM
Misc
Corrective Action Required
04/19/2022
-address return air in entry (above blocks) -seal all top and bottom plate penetrations throughout -seal gap between walls at furr out laundry wall and garage wall -fire block to ceiling space dining room NE wall -fire block gaps above fireplace -fireblock chase left of great room back windows -fireblock NE master to attic space -address great room wall to master wall not tied together -address missing LVL in master (2 places) -address wall framing at master W wall under window -seal penetrations/holes in RA panning above Basement bathroom -address over notched joist for dwv in unfinished area west basement wall
Erosion Control Inspection Residential Partial 4/19/2022 04/19/2022
DCM5 ESC INSP DENIED
Resolved
04/19/2022
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION. -see front of lot & storm drain
DCM3 ESC REQUIRED 2 DAY
Resolved
04/19/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. see front of lot and storm box
Misc
Resolved
04/19/2022
top of storm sewer covered in mud with mud running into storm sewer DO NOT SCHEDULE until erosion control is in compliance
Misc
Informational
04/19/2022
erosion control back in compliance Mitchell Schwarz 04/19/2022 11:36 AM
Gas Service Inspection - Residential Passed 4/26/2022 04/26/2022
Misc
Resolved
04/26/2022
provide 10 psi at gas gauge for inspection
All Rough Inspection - Residential Failed 4/26/2022 04/26/2022
Misc
Corrective Action Required
04/19/2022
-address great room wall to master wall not tied together -address over notched joist for dwv in unfinished area west basement wall
All Rough Inspection - Residential Failed 5/6/2022 5/6/2022 05/06/2022
Misc
Corrective Action Required
04/26/2022
-address over notched joist for dwv in unfinished area west basement wall provide engineer letter for fix Okay to insulate
All Rough Inspection - Residential Passed 5/13/2022 5/13/2022 05/12/2022
Misc
Corrective Action Required
05/06/2022
-address over notched joist for dwv in unfinished area west basement wall provide engineer letter for fix Okay to insulate
Driveway Inspection Partial 7/12/2022 7/12/2022 07/12/2022
Misc
Informational
07/12/2022
On 7.12.2022 I conducted a driveway inspection and pass the subgrade to pour concrete.
Sidewalk Inspection Partial 7/12/2022 7/12/2022 07/12/2022
Misc
Informational
07/12/2022
On 7.12.2022 I conducted a sidewalk inspection and pass the the subgrade to pour concrete.
Sidewalk Inspection Passed 7/15/2022 07/15/2022
Misc
Informational
07/12/2022
On 7.12.2022 I conducted a sidewalk inspection and pass the the subgrade to pour concrete. ON 7.15.2022 Sidewalk appears to be in compliance
Driveway Inspection Passed 8/8/2022 8/8/2022 08/08/2022
Misc
Informational
07/12/2022
On 7.12.2022 I conducted a driveway inspection and pass the subgrade to pour concrete. 8.8.2022 Driveway appears to be compliant
Plot Plan Inspection Failed 8/12/2022 08/12/2022
Misc
Corrective Action Required
08/12/2022
uncover covered manhole lid
Occupancy Inspection - Codes Residential Failed 8/24/2022 8/24/2022 08/24/2022
Misc
Corrective Action Required
08/24/2022
inspection denied no address posted upload third party footing inspection
Footing Inspection - Residential Passed 8/25/2022 08/25/2022
Occupancy Inspection - Codes Residential Ready for Temp CO 8/25/2022 8/25/2022 08/25/2022
Misc
Resolved
08/25/2022
inspection denied no address posted upload third party footing inspection
Misc
Corrective Action Required
08/25/2022
-pay tco fee -uncover covered man hole -stairs rises at rear sliding door to back patio to be not more that 3/8 difference in rises.
Occupancy Inspection - Codes Residential Temporary C of O 08/25/2022
Misc
Corrective Action Required
08/25/2022
-pay tco fee -uncover covered man hole -stairs rises at rear sliding door to back patio to be not more that 3/8 difference in rises.
Occupancy Inspection - Codes Residential Full C of O 8/26/2022 8/26/2022 08/26/2022
Misc
Informational
08/26/2022
As per Converstaion with Jim and pictures provided. Redford Const. will raise Manhole to City standards and Sab will provide grade and sod. Issuing C of O based on this converstion. MARK HARDING 08/26/2022 8:30 AM
Documents & Images
Date Uploaded File Type Document Name
06/07/2021 Application Form APPLICATION
06/07/2021 Application Form excise tax
06/08/2021 Approved Plans APPROVED PLANS
06/08/2021 Approved Plans COMBUSTION AIR CALCS.
06/08/2021 Permit Codes Residential Plan Review
06/10/2021 Plot Plan APPROVED PLOT PLAN
06/10/2021 Permit Codes Residential Plan Review
06/15/2021 Permit DS Building Permit
06/15/2021 Receipt Receipt for transaction:2021-004461
10/08/2021 Letter INSPECTION SUMMARY
10/08/2021 Letter INSPECTION SUMMARY
10/25/2021 Letter INSPECTION SUMMARY
10/26/2021 Letter INSPECTION SUMMARY
12/07/2021 Letter INSPECTION SUMMARY
12/07/2021 Letter INSPECTION SUMMARY
03/23/2022 Letter INSPECTION SUMMARY
03/23/2022 Letter INSPECTION SUMMARY
03/23/2022 Letter INSPECTION SUMMARY
03/23/2022 Letter INSPECTION SUMMARY
03/31/2022 Letter INSPECTION SUMMARY
03/31/2022 Letter INSPECTION SUMMARY
03/31/2022 Letter INSPECTION SUMMARY
03/31/2022 Letter INSPECTION SUMMARY
04/04/2022 DW STRUCTURAL LETTER Solaia II E737 2366 SW Hickory Ln
04/08/2022 Letter INSPECTION SUMMARY
04/08/2022 Letter INSPECTION SUMMARY
04/08/2022 Letter INSPECTION SUMMARY
04/08/2022 Letter INSPECTION SUMMARY
04/19/2022 Letter INSPECTION SUMMARY
04/19/2022 Letter INSPECTION SUMMARY
04/19/2022 Letter INSPECTION SUMMARY
04/19/2022 Letter INSPECTION SUMMARY
04/26/2022 Letter INSPECTION SUMMARY
04/26/2022 Letter INSPECTION SUMMARY
04/26/2022 Letter INSPECTION SUMMARY
05/06/2022 Letter INSPECTION SUMMARY
05/10/2022 DW FRAMING ADDENDUM Solaia II E737 2366 SW Hickory Ln 5-9-22
05/12/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
08/08/2022 Letter INSPECTION SUMMARY
08/11/2022 Plot Plan APPROVED AS GRADED PLOT PLAN
08/12/2022 Letter INSPECTION SUMMARY
08/24/2022 Letter INSPECTION SUMMARY
08/24/2022 M L Crose 2366 SW Hickory Ln LSMO Eagle Creek Lot 737 SAB Homes P 2021-2916 3rd Party Footing Inspection Report 9-14-21
08/25/2022 Receipt Receipt for transaction:2022-006983
08/25/2022 Receipt Receipt for transaction:2022-007005
08/25/2022 Letter Codes Temporary Certificate of Occupancy
08/26/2022 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home