Permit Application Status

PRRES20212525


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20212525
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - FINISHED BASEMENT - COVERED PATIO
05/18/2021
05/24/2021
11/14/2021
02/28/2024
Locations
Contacts
KEVIN HIGDON CONSTRUCTION, LLC, Address:P O BOX 847, Phone:(816) 524-9797  
HIGGINBOTHAM.BRIAN@YAHOO.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
INTERSTATE CONSTRUCTION SERVICES, Address:1450 SE BROADWAY DR, Phone:(816) 524-9797  
MILLER PLUMBING CO, Address:PO BOX 393 , Phone:(913) 851-1333  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,313.52 $1,313.52 Paid 05/24/2021
Right of Way Permit Fee $80.00 $80.00 Paid 05/24/2021
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 05/24/2021
8331504-EFHB Middle Big Creek, Full $602.64 $602.64 Paid 05/24/2021
8331507-Sewer Connection Fee $540.00 $540.00 Paid 05/24/2021
Water Tap Fee $3,581.00 $3,581.00 Paid 05/24/2021
Water Meter Fee $455.54 $455.54 Paid 05/24/2021
Not Ready Inspection Fee $50.00 $50.00 Paid 11/19/2021
Valuation Fee New Single Family $40.27 $40.27 Paid 11/19/2021
$1,353.79
Not Ready Inspection Fee $50.00 $50.00 Paid 05/17/2022
Not Ready Inspection Fee $50.00 $50.00 Paid 05/17/2022
Not Ready Inspection Fee $50.00 $50.00 Paid 05/17/2022
Not Ready Inspection Fee $50.00 $50.00 Paid 05/17/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 7/9/2021 (1:00) 7/9/2021 07/09/2021
Underslab Plumbing Inspection - Residential Passed 8/6/2021 8/6/2021 08/06/2021
Sewer Service Inspection - R Passed 10/4/2021 (10:30) 10/4/2021 10/04/2021
Water Service Inspection - R Passed 10/7/2021 (9:45) 10/7/2021 10/07/2021
All Rough Inspection - Residential Not Ready 11/4/2021 11/4/2021 11/04/2021
Misc
Corrective Action Required
11/04/2021
INSPECTION DENIED EROSION CONTROL REQUIRED ON LOT, MAINTAIN SILT FENCE ON LOT
Erosion Control Inspection Residential Failed 11/4/2021 11/4/2021 11/04/2021
Misc
Corrective Action Required
11/04/2021
INSPECTION DENIED EROSION CONTROL REQUIRED ON LOT, MAINTAIN SILT FENCE ON LOT
Electrical Service Inspection Passed 12/3/2021 12/3/2021 12/03/2021
Gas Service Inspection - Residential Failed 12/3/2021 12/3/2021 12/03/2021
Misc
Corrective Action Required
12/03/2021
-Gas pressure 7 psi, must maintain 10 psi for test
All Rough Inspection - Residential Failed 12/3/2021 12/3/2021 12/03/2021
Misc
Corrective Action Required
11/04/2021
-rafters not tied to ceiling joist and top plate per code, engineer letter -PFH garage portal design requires dbl bottom plate -overnotched studs garage west exterior wall -Fur down at HVAC garage ceiling to allow for insulation -Fireblock HVAC chase at garage -Secure all vertical DWV 2” or less at mid point -seal low volt bottom penetration, 1st floor flex, 2nd floor SW bedroom -CS-PF bracing per plans at breakfast sliding glass door and 2nd floor master bath, see detail A4 in plans, nail exterior sheathing, tension straps required, dbl 2x12 header min -attic access 1st floor -seal top plate penetrations finished basement -Fireblock vertical to horizontal at furred down soffit ends -UFER must remain accessible at finish -Fireblock deadspace at basement shower -Fireblock between top plate and foundation wall at basement bath and stairs -Tighten all anchor bolts at basement -Secure main water line to foundation wall at basement -what is conduit at driveway? If running electrical under driveway it will need to be buried 18” per code and will require an underground electrical inspection
Gas Service Inspection - Residential Not Ready 12/16/2021 12/16/2021 12/16/2021
Misc
Corrective Action Required
12/03/2021
-Gas pressure 7 psi, must maintain 10 psi for test 12-16-21- NOT READY, PRESSURE AT 5.5 PSI
All Rough Inspection - Residential Not Ready 12/16/2021 12/16/2021 12/16/2021
Misc
Corrective Action Required
12/03/2021
-rafters not tied to ceiling joist and top plate per code, engineer letter-COMPLETE CORRECTION PER ENGINEERED LETTER -PFH garage portal design requires dbl bottom plate-ANCHOR BOLTS TO BE THROUGH BOTH PLATES -seal low volt bottom penetration, 2nd floor SW bedroom top plate -Fireblock vertical to horizontal at furred down soffit ends -UFER must remain accessible at finish -Fireblock deadspace at basement shower -Fireblock between top plate at basement stairs -Tighten all anchor bolts at basement -Secure main water line to foundation wall at basement
Gas Service Inspection - Residential Failed 12/21/2021 12/21/2021 12/21/2021
Misc
Corrective Action Required
12/16/2021
-Gas pressure 7 psi, must maintain 10 psi for test 12-16-21- NOT READY, PRESSURE AT 5.5 PSI 12/21/21 - NOT READY, PRESSURE AT 5 PSI
All Rough Inspection - Residential Not Ready 12/21/2021 12/21/2021 12/21/2021
Misc
Corrective Action Required
12/16/2021
-rafters not tied to ceiling joist and top plate per code, engineer letter-COMPLETE CORRECTION PER ENGINEERED LETTER -Fireblock deadspace at basement shower -Tighten all anchor bolts at basement **OK TO INSULATE**
Gas Service Inspection - Residential Not Ready 12/27/2021 12/27/2021 12/27/2021
Misc
Corrective Action Required
12/21/2021
-Gas pressure 7 psi, must maintain 10 psi for test 12-16-21- NOT READY, PRESSURE AT 5.5 PSI 12/21/21 - NOT READY, PRESSURE AT 5 PSI 12/27/21 - NOT READY, PRESSURE AT 5 PSI
All Rough Inspection - Residential Failed 12/27/2021 12/27/2021 12/27/2021
Misc
Corrective Action Required
12/21/2021
-rafters not tied to ceiling joist and top plate per code, engineer letter- NAIL STRAPS PER ENGINEER LETTER REQUIREMENTS **OK TO INSULATE**
Gas Service Inspection - Residential Passed 1/18/2022 1/18/2022 01/18/2022
Misc
Resolved
01/18/2022
-Gas pressure 7 psi, must maintain 10 psi for test 12-16-21- NOT READY, PRESSURE AT 5.5 PSI 12/21/21 - NOT READY, PRESSURE AT 5 PSI 12/27/21 - NOT READY, PRESSURE AT 5 PSI
All Rough Inspection - Residential Passed 1/18/2022 1/18/2022 01/18/2022
Misc
Resolved
01/18/2022
Driveway Inspection Partial 4/4/2022 4/4/2022 04/04/2022
Misc
Informational
04/04/2022
On Monday 4.4.2022 I performed a driveway inspection and pass the subgrade to pour concrete
Occupancy Inspection - Codes Residential Failed 5/16/2022 5/17/2022 05/17/2022
Misc
Corrective Action Required
05/17/2022
-Final driveway inspection required, contact development services to schedule -Final grade and sod -Submit as graded plot plan for review and approval -splash blocks downspouts and sump pump, min 36" discharge from foundation -provide (2) 1/2” through bolts each post/beam connection at deck see center post one missing
Piers/Caissons Inspection - Residential Passed 5/18/2022 05/18/2022
Misc
Informational
05/18/2022
Third party inspection
Occupancy Inspection - Codes Residential Temporary C of O 5/18/2022 5/18/2022 05/18/2022
Misc
Corrective Action Required
05/17/2022
TCO Until 6/17/22 -Final driveway inspection required, contact development services to schedule -No pier inspection performed covered deck piers -Resolve outstanding inspection fees before final c of o -Final grade and sod -Submit as graded plot plan for review and approval -splash blocks downspouts and sump pump, min 36" discharge from foundation -Install locks front door -tighten guardrail at deck -clamp copper ground wire to ground rod exterior near meter can -provide (2) 1/2” through bolts each post/beam connection at deck
Plot Plan Inspection Passed 6/21/2022 at 7:57 AM 06/20/2022
Driveway Inspection Passed 11/2/2022 11/2/2022 11/02/2022
Misc
Informational
04/04/2022
On Monday 4.4.2022 I performed a driveway inspection and pass the subgrade to pour concrete 11-2-22 RH. Meets LS and ADA specification.
Erosion Control Inspection Residential Passed 03/23/2023
Misc
Resolved
03/23/2023
INSPECTION DENIED EROSION CONTROL REQUIRED ON LOT, MAINTAIN SILT FENCE ON LOT
Occupancy Inspection - Codes Residential Failed 3/23/2023 3/23/2023 03/23/2023
Misc
Resolved
03/23/2023
TCO Until 6/17/ -splash blocks downspouts and sump pump, min 36" discharge from foundation -Install locks front door -tighten guardrail at deck -clamp copper ground wire to ground rod exterior near meter can -provide (2) 1/2” through bolts each post/beam connection at deck
Misc
Corrective Action Required
05/24/2022
-Water meter to be 14-18 inches from lid to lid -provide issued lawn irrigation permit
Occupancy Inspection - Codes Residential Full C of O 02/28/2024
Misc
Resolved
02/28/2024
-Water meter to be 14-18 inches from lid to lid -provide issued lawn irrigation permit
Documents & Images
Date Uploaded File Type Document Name
05/18/2021 Application Form Permit Application
05/18/2021 Application Form License Tax Form
05/18/2021 Permit Codes Residential Plan Review
05/24/2021 Plot Plan Approved Plot Plan
05/24/2021 Approved Plans Approved Drawings
05/24/2021 Permit Codes Residential Plan Review
05/24/2021 Permit DS Building Permit
05/24/2021 Receipt Receipt for transaction:2021-003429
07/09/2021 Letter INSPECTION SUMMARY
08/06/2021 Letter INSPECTION SUMMARY
10/04/2021 Letter INSPECTION SUMMARY
10/07/2021 Letter INSPECTION SUMMARY
11/04/2021 Letter INSPECTION SUMMARY
11/04/2021 Letter INSPECTION SUMMARY
11/19/2021 Receipt Receipt for transaction: 2021-008863
11/19/2021 Letter DS Building Permit
12/03/2021 Letter INSPECTION SUMMARY
12/03/2021 Letter INSPECTION SUMMARY
12/03/2021 Letter INSPECTION SUMMARY
12/15/2021 1813 SW Sage Canyon Inspection Comment Letter
12/16/2021 Letter INSPECTION SUMMARY
12/16/2021 Letter INSPECTION SUMMARY
12/21/2021 Letter INSPECTION SUMMARY
12/21/2021 Letter INSPECTION SUMMARY
12/27/2021 Letter INSPECTION SUMMARY
12/27/2021 Letter INSPECTION SUMMARY
01/18/2022 Letter INSPECTION SUMMARY
01/18/2022 Letter INSPECTION SUMMARY
04/04/2022 Letter INSPECTION SUMMARY
05/17/2022 Letter INSPECTION SUMMARY
05/17/2022 1813 SW Sage Canyon Dr_DECK PIER INSP_2021-10-06 (002)
05/17/2022 Receipt Receipt for transaction:2022-003569
05/18/2022 Letter INSPECTION SUMMARY
05/18/2022 Letter Codes Temporary Certificate of Occupancy
06/20/2022 Plot Plan Approved As Graded Plot Plan
06/20/2022 Letter INSPECTION SUMMARY
11/02/2022 Letter INSPECTION SUMMARY
03/23/2023 Letter INSPECTION SUMMARY
03/23/2023 Letter INSPECTION SUMMARY
03/23/2023 Letter INSPECTION SUMMARY
08/10/2023 Letter Codes 140 Day Letter
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home