Permit Application Status

PRRES20210253


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20210253
Building Permit - Residential
Certificate of Occupancy
CHOYCE LLC
NEW SINGLE FAMILY
NEW HOUSE - FINISHED AND UNFINISHED BASEMENT - TILE ROOF
01/19/2021
01/20/2021
07/19/2021
08/26/2022
Locations
Contacts
CHOYCE LLC, Address:PO BOX 847  
KEVIN HIGDON CONSTRUCTION, LLC, Address:P O BOX 847, Phone:(816) 524-9797  
KEVIN@HIGDONBUILDERS.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
INTERSTATE CONSTRUCTION SERVICES, Address:1450 SE BROADWAY DR, Phone:(816) 524-9797  
MILLER PLUMBING CO, Address:PO BOX 393 , Phone:(913) 851-1333  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 01/22/2021 01/20/2021
Brandon Kalwei
Basement egress
Corrective Action Required
01/20/2021

Basement egress location(s) and elevation of the lowest adjacent grade must be provided on the plot plan.
Residential Plan Review Approved 01/22/2021 01/20/2021
Brandon Kalwei
Plot Plan Review Rejected 01/21/2021 01/19/2021
Brandon Kalwei
Basement egress
Corrective Action Required
01/19/2021

Basement egress location(s) and elevation of the lowest adjacent grade must be provided on the plot plan.
Sidewalks
Corrective Action Required
05/12/2022

Sidewalks with dimensions must be provided on the plot plan. No sidewalks shown on plat, please remove 4' sidewalk.
Residential Plan Review Approved 01/21/2021 01/19/2021
Brandon Kalwei
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,112.41 $1,112.41 Paid 01/20/2021
8331507-Sewer Connection Fee $390.00 $390.00 Paid 01/20/2021
Right of Way Permit Fee $80.00 $80.00 Paid 01/20/2021
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 01/20/2021
8331506-EFHB Maybrook, Full $553.93 $553.93 Paid 01/20/2021
Water Tap Fee $3,581.00 $3,581.00 Paid 01/20/2021
Water Meter Fee $455.54 $455.54 Paid 01/20/2021
Valuation Fee New Single Family $24.16 $24.16 Paid 06/15/2022
$1,136.57
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Residential Failed 3/23/2021 03/23/2021
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
03/23/2021
EROSION CONTROL REQUIRED ALONG THE STREET AT ALL DISTURBED SOIL, INCLUDING THE DIRT PILE AND TRACK ON BOTH SIDES OF THE LOT. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Footing Inspection - Residential Failed 3/23/2021 (2:00) 3/23/2021 03/23/2021
Misc
Corrective Action Required
03/23/2021
THE FOOTING IS OK; HOWEVER, COLUMN PADS THICKNESS IS NOT PER PLAN
Footing Inspection - Residential Passed 04/07/2021
Misc
Resolved
04/07/2021
THE FOOTING IS OK; HOWEVER, COLUMN PADS THICKNESS IS NOT PER PLAN
Underslab Plumbing Inspection - Residential Failed 5/3/2021 5/3/2021 05/03/2021
Misc
Corrective Action Required
05/03/2021
-COMPLETE INSTALLING THE SUMP PUMP PIT AND DRAIN TILES
Erosion Control Inspection Residential Failed 5/11/2021 05/11/2021
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
03/23/2021
CLEAN DIRT OFF THE STREET NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Underslab Plumbing Inspection - Residential Passed 5/11/2021 5/11/2021 05/11/2021
Misc
Resolved
05/11/2021
-COMPLETE INSTALLING THE SUMP PUMP PIT AND DRAIN TILES
Sewer Service Inspection - R Passed 8/3/2021 (2:30) 8/3/2021 08/03/2021
Water Service Inspection - R Passed 8/4/2021 (9:30) 8/4/2021 08/04/2021
All Rough Inspection - Residential Failed 10/5/2021 10/5/2021 10/05/2021
Misc
Corrective Action Required
10/05/2021
-Nail garage PFH wall sheathing to studs and header per code -Nail exterior siding to sill plates @6” oc -Install hanger support for roof beam above foyer and full stud support at foyer/garage end -Slope vent in attic toward drain -Provide full support for roof beam at front bedroom closet exterior wall -Engineer to address support for all over-cut bottom hip&valley rafters -Have engineer address rafters bearing on trim board, instead of 2x lumber -Install stud support underneath roof strut at front bedroom/bathroom wall -Support hip rafters above master bathroom -Security blocking for master bedroom exterior door -Shim gap underneath studs on both sides of slide door -Fb gap at back side of fireplace space -Support all hip and valley rafters at upper ends throughout house -Brace ends of lvl roof beams from rotation -Nail together lvl beam above great room -Provide (6)2x4 stud support for I beam at stair/mud corner and nail together w/16d or equivalent nailing every 24” oc; under the I beam point load, solid block to foundation wall -Install a floor receptacle at rail adjacent to stair -Provide (7)2x4 support at each end of garage I beam. Fill in bottom gap at stoop end of I beam -Provide two anchors with 2”x2”x3/16” washers for each garage PFH wall plate; install tension straps on the inner side of wall. See plan -Anchor garage sill plate within 12” of break -Provide full support for stoop roof beam at garage wall -Fb gap at stair/mud wall **OK TO INSULATE
Electrical Service Inspection Passed 10/5/2021 10/5/2021 10/05/2021
Gas Service Inspection - Residential Passed 10/5/2021 10/5/2021 10/05/2021
All Rough Inspection - Residential Failed 10/15/2021 10/15/2021 10/15/2021
Misc
Corrective Action Required
10/05/2021
-Nail exterior siding to sill plates @6” oc -Slope vent in attic toward drain -Engineer to address support for all over-cut bottom hip&valley rafters -Have engineer address rafters bearing on trim board, instead of 2x lumber **rafters must be fasten to wall top plates per IRC table 602.3(1). Have engineer address how to meet this requirement. -Reinstall torn-out electrical at front bedroom **OK TO INSULATE
Driveway Inspection Partial 11/11/2021 (3:30) 11/11/2021 11/11/2021
Misc
Informational
11/11/2021
Driveway was framed up and had aggregate in place and compacted. 11/11 ES
Driveway Inspection Passed 11/19/2021 11/19/2021 11/19/2021
Misc
Informational
11/11/2021
Driveway was framed up and had aggregate in place and compacted. 11/11 ES
Misc
Informational
11/19/2021
11-19 21 AN Driveway looks good and has expansion joints at curb and right of way . No sidewalk
All Rough Inspection - Residential Failed 12/21/2021 12/21/2021 12/21/2021
Misc
Corrective Action Required
10/15/2021
-Have engineer address rafters bearing on trim board, instead of 2x lumber **rafters must be fasten to wall top plates per IRC table 602.3(1). Have engineer address how to meet this requirement. **not done per apex engineer letter
All Rough Inspection - Residential Passed 12/27/2021 12/27/2021 12/27/2021
Misc
Resolved
12/27/2021
-Have engineer address rafters bearing on trim board, instead of 2x lumber **rafters must be fasten to wall top plates per IRC table 602.3(1). Have engineer address how to meet this requirement. **not done per apex engineer letter
All Rough Inspection - Residential Passed 7/15/2022 7/15/2022 07/15/2022
Misc
Corrective Action Required
07/15/2022
Basement finish all rough
Erosion Control Inspection Residential Passed 08/26/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
08/26/2022
CLEAN DIRT OFF THE STREET NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Piers/Caissons Inspection - Residential Passed 08/26/2022
Informational
08/26/2022
piers inspected and approved by engineer
Occupancy Inspection - Codes Residential Full C of O 8/26/2022 8/26/2022 08/26/2022
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home

*PLEASE NOTE - You must be logged in with your registered user account to view any documents related to your permit