Permit Application Status

PRRES20210098


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20210098
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - COVERED PATIO TILE ROOF
01/07/2021
01/15/2021
07/12/2021
08/24/2022
Locations
Contacts
KEVIN HIGDON CONSTRUCTION, LLC, Address:P O BOX 847, Phone:(816) 524-9797  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
INTERSTATE CONSTRUCTION SERVICES, Address:1450 SE BROADWAY DR, Phone:(816) 524-9797  
MILLER PLUMBING CO, Address:PO BOX 393 , Phone:(913) 851-1333  
DOUG@HIGDONBUILDERS.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 01/20/2021 01/15/2021
Kim Brennan
Deck location
Corrective Action Required
01/15/2021

Deck location, with dimensions to property lines must be provided on the plot plan. Please show that this is a covered patio
Misc
Corrective Action Required
01/15/2021

PLEASE SHOW NE INDPENDENCE AVE ON THE EAST SIDE OF THIS LOT
Right-of-way
Corrective Action Required
01/15/2021

The right-of-way with dimensions must be provided on the plot plan.
Basement egress
Corrective Action Required
01/15/2021

Basement egress location(s) and elevation of the lowest adjacent grade must be provided on the plot plan.
Residential Plan Review Approved 01/20/2021 01/15/2021
Kim Brennan
Residential Plan Review Approved 01/15/2021 01/13/2021
Kim Brennan
03 Two (2) plot plans
Corrective Action Required
01/13/2021

One plot plan
05 Provide square footage of living area, garage area, unfinished basement
Corrective Action Required
01/13/2021

Provide square footage of living area, garage area, unfinished basement area, etc (IRC Section R304) The finished and unfinished areas do not match the permit application. Please change the plans to reflect the correct square footage.
14 Identify roof covering material (IRC Section R905)
Corrective Action Required
01/13/2021

Identify roof covering material (IRC Section R905) Application shows cement tile roof and the drawings show a composition roof. Which one is correct?
Plot Plan Review Rejected 01/15/2021 01/13/2021
Kim Brennan
Deck location
Corrective Action Required
01/13/2021

Deck location, with dimensions to property lines must be provided on the plot plan. Please show that this is a covered patio
Misc
Corrective Action Required
01/13/2021

PLEASE SHOW NE INDPENDENCE AVE ON THE EAST SIDE OF THIS LOT
Right-of-way
Corrective Action Required
01/13/2021

The right-of-way with dimensions must be provided on the plot plan.
Basement egress
Corrective Action Required
01/13/2021

Basement egress location(s) and elevation of the lowest adjacent grade must be provided on the plot plan.
Plot Plan Review Rejected 01/11/2021 01/13/2021
Kim Brennan
Deck location
Corrective Action Required
01/12/2021

Deck location, with dimensions to property lines must be provided on the plot plan. Please show that this is a covered patio
Misc
Corrective Action Required
01/12/2021

PLEASE SHOW NE INDPENDENCE AVE ON THE EAST SIDE OF THIS LOT
Right-of-way
Corrective Action Required
01/13/2021

The right-of-way with dimensions must be provided on the plot plan.
Basement egress
Corrective Action Required
01/13/2021

Basement egress location(s) and elevation of the lowest adjacent grade must be provided on the plot plan.
Residential Plan Review Rejected 01/11/2021 01/08/2021
Kim Brennan
03 Two (2) plot plans
Corrective Action Required
01/07/2021

One plot plan
05 Provide square footage of living area, garage area, unfinished basement
Corrective Action Required
01/08/2021

Provide square footage of living area, garage area, unfinished basement area, etc (IRC Section R304) The finished and unfinished areas do not match the permit application. Please change the plans to reflect the correct square footage.
14 Identify roof covering material (IRC Section R905)
Corrective Action Required
01/08/2021

Identify roof covering material (IRC Section R905) Application shows cement tile roof and the drawings show a composition roof. Which one is correct?
Planning Review (RES) Approved 01/12/2021 01/08/2021
Hector Soto Jr.
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,063.33 $1,063.33 Paid 01/15/2021
Right of Way Permit Fee $80.00 $80.00 Paid 01/15/2021
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 01/15/2021
8331504-EFHB Middle Big Creek, Half $217.62 $217.62 Paid 01/15/2021
8331507-Sewer Connection Fee $390.00 $390.00 Paid 01/15/2021
Water Tap Fee $3,581.00 $3,581.00 Paid 01/15/2021
Water Meter Fee $455.54 $455.54 Paid 01/15/2021
Not Ready Inspection Fee $50.00 $50.00 Paid 03/24/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Not Ready 3/4/2021 (3:00) 3/4/2021 03/04/2021
Misc
Corrective Action Required
03/04/2021
3/4/21-Not ready fee assessed. Footing scheduled as ready at 3:00PM, but footing forms were not installed, only excavation for the footing is done **Erosion control not installed. Erosion control shall be installed before an inspection is perfomed
Footing Inspection - Residential Failed 3/24/2021 (2:30) 3/24/2021 03/24/2021
Misc
Corrective Action Required
03/04/2021
3/4/21-Not ready fee assessed. Footing scheduled as ready at 3:00PM, but footing forms were not installed, only excavation for the footing is done 3/24/21-Gravel is still not installed at driveway **Erosion control not installed. Erosion control shall be installed before an inspection is perfomed
Footing Inspection - Residential Partial 3/25/2021 3/25/2021 03/25/2021
Misc
Corrective Action Required
03/24/2021
3/4/21-Not ready fee assessed. Footing scheduled as ready at 3:00PM, but footing forms were not installed, only excavation for the footing is done 3/24/21-Gravel is still not installed at driveway FOOTING OK, EXCEPT THE PIER PADS THICKNESS IS NOT PER PLAN
Footing Inspection - Residential Passed 04/07/2021
Misc
Resolved
04/07/2021
3/4/21-Not ready fee assessed. Footing scheduled as ready at 3:00PM, but footing forms were not installed, only excavation for the footing is done 3/24/21-Gravel is still not installed at driveway FOOTING OK, EXCEPT THE PIER PADS THICKNESS IS NOT PER PLAN
Underslab Plumbing Inspection - Residential Passed 5/4/2021 5/4/2021 05/03/2021
Sewer Service Inspection - R Passed 8/4/2021 08/04/2021
Erosion Control Inspection Residential Failed 8/4/2021 08/04/2021
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
08/04/2021
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. **CLEAN STREET AFTER DONE WITH SEWER
Erosion Control Inspection Residential Failed 8/6/2021 08/06/2021
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
08/04/2021
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. **CLEAN STREET AND RESTORE EROSION CONTROL
Water Service Inspection - R Passed 8/6/2021 (8:30) 8/6/2021 08/06/2021
All Rough Inspection - Residential Failed 10/5/2021 10/5/2021 10/05/2021
Misc
Corrective Action Required
10/05/2021
Staple front sheathing to sill plate @4” oc and 8” oc to studs -Provide full support for roof beam ann beige foyer at foyer/garage end -Install joist hangers above front bathroom -Protect plumbing at laundry room top wall plate -Slope vent in attic toward drain -Cannot use shower bench space as return air space. Stud or joist space only -Support hip rafters above master bathroom -Nail corner studs per code -Install (3)2x4 support for lvl beam at master bedroom exterior wall -Brace ends of lvl roof beams from rotation -Fb gap at back side of fireplace space -Above stair, support end of ridge; add another rafter in the triangular area to reduce roof deck span to allowable 16/24 span -Provide (7)2x4 studs at each end of garage I beam -Install garage PFH wall tension straps per code. See the plan ; provide 2”x2”x3/16” washers -Provide full support for stoop roof beam at garage -Toe nail joists to foundation wall sill plates -Plumb steel column and anchor -Solid block under I beam point load (sb below rear dining corner) **DO NOT INSULATE
Electrical Service Inspection Passed 10/5/2021 10/5/2021 10/05/2021
Gas Service Inspection - Residential Passed 10/5/2021 10/5/2021 10/05/2021
All Rough Inspection - Residential Failed 10/15/2021 10/15/2021 10/15/2021
Misc
Corrective Action Required
10/05/2021
Staple front sheathing to sill plate @4” oc and 8” oc to studs -Provide full support for roof beam at foyer/garage end **add support studs -Protect plumbing at laundry room top wall plate **at top plate -Slope vent in attic toward drain -Install garage PFH wall tension straps per code. See the plan ; provide 2”x2”x3/16” washers **common! -Toe nail joists to foundation wall sill plates **not all done **DO NOT INSULATE
All Rough Inspection - Residential Failed 10/21/2021 10/21/2021 10/21/2021
Misc
Corrective Action Required
10/15/2021
-Staple front sheathing to sill plate @4” oc and 8” oc to studs -Provide full support for roof beam at foyer/garage end **add support studs -Protect plumbing at laundry room top wall plate **at top plate -Slope vent in attic toward drain -Install garage PFH wall tension straps per code. See the plan ; provide 2”x2”x3/16” washers **common! -Toe nail joists to foundation wall sill plates **not all done **DO NOT INSULATE
All Rough Inspection - Residential Passed 10/25/2021 10/25/2021 10/25/2021
Misc
Resolved
10/25/2021
-Slope vent in attic toward drain -Install garage PFH wall tension straps per code. See the plan ; provide 2”x2”x3/16” washers **common!
Driveway Inspection Partial 11/11/2021 (3:30) 11/11/2021 11/11/2021
Misc
Informational
11/11/2021
Driveway was framed up and had aggregate in place and compacted. 11/11 ES
Sidewalk Inspection Partial 11/11/2021 (3:30) 11/11/2021 11/11/2021
Misc
Informational
11/11/2021
Sidewalk was framed up and had aggregate in place and compacted. Sidewalk had two valve boxes on east side of house that will need to be replaced with ferrous metal risers. Informed flatworm crew to leave space enough for this work to take place while also maintaining panel size. 11/11 ES
Driveway Inspection Passed 11/22/2021 11/22/2021 11/19/2021
Misc
Informational
11/11/2021
Driveway was framed up and had aggregate in place and compacted. 11/11 ES
Misc
Informational
11/19/2021
Driveway looks good and meets ADA spec
Sidewalk Inspection Failed 12/15/2021 12/15/2021 12/15/2021
Misc
Informational
11/11/2021
Sidewalk was framed up and had aggregate in place and compacted. Sidewalk had two valve boxes on east side of house that will need to be replaced with ferrous metal risers. Informed flatworm crew to leave space enough for this work to take place while also maintaining panel size. 11/11 ES
Miscellaneous Correction
Corrective Action Required
12/15/2021
12-15-21 AN sidewalk does need to meet up with the ADA ramp at the corner of independence dr and ne woods chapel .
Erosion Control Inspection Residential Passed 05/17/2022
DCM2 ESC DEFICIENT INSTALLATION
Resolved
05/17/2022
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. **CLEAN STREET AND RESTORE EROSION CONTROL
Occupancy Inspection - Codes Residential Failed 5/17/2022 5/17/2022 05/17/2022
Resolved
05/17/2022
3/4/21-Not ready fee assessed. Footing scheduled as ready at 3:00PM, but footing forms were not installed, only excavation for the footing is done
Misc
Corrective Action Required
05/17/2022
-Obtain lawn irrigation permit and submit backflow valve test report to city -Sidewalk and piers inspections not approved on record -Final grade not sloped properly at east side. There’s standing water -Downspout + splash blocks must extend min 36” from foundation wall -PaInt gas service piping -Raise AC base -Fill in gravel at window well for min 36” footing frost protection -Provide box extensions for receptacle boxes in master bedroom -Garage stair handrail must be graspable -Support duct above rear of basement -Provide AFCI protectiotn for all outlets required per NEC 210.12 (all bedrooms, living room, etc)
Occupancy Inspection - Codes Residential Temporary C of O 5/20/2022 5/20/2022 05/20/2022
Misc
Corrective Action Required
05/17/2022
-Obtain lawn irrigation permit and submit backflow valve test report to city -Sidewalk not approved on record -Final grade not sloped properly at east side. There’s standing water -Raise AC base
Sidewalk Inspection Failed 05/20/2022
Misc
Informational
12/15/2021
Sidewalk was framed up and had aggregate in place and compacted. Sidewalk had two valve boxes on east side of house that will need to be replaced with ferrous metal risers. Informed flatworm crew to leave space enough for this work to take place while also maintaining panel size. 11/11 ES
Miscellaneous Correction
Corrective Action Required
12/15/2021
12-15-21 AN sidewalk does need to meet up with the ADA ramp at the corner of independence dr and ne woods chapel .
Miscellaneous Correction
Corrective Action Required
05/20/2022
5-20-22 AN one of the previous inspections states that there were 2 valve boxes in the sidewalk now there is only 1 . You need to locate the other valve
Sidewalk Inspection Failed 5/23/2022 5/23/2022 05/26/2022
Misc
Informational
05/20/2022
Sidewalk was framed up and had aggregate in place and compacted. Sidewalk had two valve boxes on east side of house that will need to be replaced with ferrous metal risers. Informed flatworm crew to leave space enough for this work to take place while also maintaining panel size. 11/11 ES
Miscellaneous Correction
Corrective Action Required
05/20/2022
12-15-21 AN sidewalk does need to meet up with the ADA ramp at the corner of independence dr and ne woods chapel .
Miscellaneous Correction
Corrective Action Required
05/20/2022
5-20-22 AN one of the previous inspections states that there were 2 valve boxes in the sidewalk now there is only 1 . You need to locate the other valve
Miscellaneous Correction
Corrective Action Required
05/26/2022
5-26-22 AN Google street view shows that there is two valves also Water utilities is investigating and trying to find the valve. It will be the builders responsibility take care of the valve.
Misc
Informational
05/26/2022
5-26-22 AN water utilities located the valve and replace the top hat
Sidewalk Inspection Passed 05/26/2022
Misc
Informational
05/26/2022
Sidewalk was framed up and had aggregate in place and compacted. Sidewalk had two valve boxes on east side of house that will need to be replaced with ferrous metal risers. Informed flatworm crew to leave space enough for this work to take place while also maintaining panel size. 11/11 ES
Miscellaneous Correction
Corrective Action Required
05/26/2022
12-15-21 AN sidewalk does need to meet up with the ADA ramp at the corner of independence dr and ne woods chapel .
Miscellaneous Correction
Corrective Action Required
05/26/2022
5-20-22 AN one of the previous inspections states that there were 2 valve boxes in the sidewalk now there is only 1 . You need to locate the other valve
Miscellaneous Correction
Corrective Action Required
05/26/2022
5-26-22 AN Google street view shows that there is two valves also Water utilities is investigating and trying to find the valve. It will be the builders responsibility take care of the valve.
Misc
Informational
05/26/2022
5-26-22 AN water utilities located the valve and replace the top hat
Occupancy Inspection - Codes Residential Full C of O 8/24/2022 8/24/2022 08/24/2022
Misc
Resolved
08/24/2022
-Obtain lawn irrigation permit and submit backflow valve test report to city
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home

*PLEASE NOTE - You must be logged in with your registered user account to view any documents related to your permit