Permit Application Status

PRRES20202672


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20202672
Building Permit - Residential
Certificate of Occupancy
CHOYCE LLC
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - COVERED PATIO TILE ROOF
09/01/2020
09/21/2020
06/29/2021
Locations
Contacts
CHOYCE LLC, Address:PO BOX 847  
KEVIN HIGDON CONSTRUCTION, LLC, Address:P O BOX 847, Phone:(816) 524-9797  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
INTERSTATE CONSTRUCTION SERVICES, Address:1450 SE BROADWAY DR, Phone:(816) 524-9797  
MILLER PLUMBING CO, Address:PO BOX 393 , Phone:(913) 851-1333  
DOUG@HIGDONBUILDERS.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Residential Plan Review Approved 09/14/2020 09/21/2020
Kim Brennan
Misc
Corrective Action Required
09/10/2020

The drawing states that this is Lot 16, Chapel Ridge Hills and it should state Lot 16, Estates of Chapel Ridge
14 Identify roof covering material (IRC Section R905)
Corrective Action Required
09/10/2020

Identify roof covering material (IRC Section R905) Page 5 of the drawings show roofing material as asphalt shingles and page 6 shows tile roof. Please clarify.
Plot Plan Review Approved 09/14/2020 09/15/2020
Kim Brennan
Property boundary
Corrective Action Required
09/10/2020

Property boundary distances and bearings, as shown on the recorded plat, must be provided on the plot plan. The distance on the corner should be 16.85 instead of 16.82 per the recorded plat
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,299.80 $1,299.80 Paid 09/21/2020
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 09/21/2020
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 09/21/2020
8331506-EFHB Maybrook, Full $766.98 $766.98 Paid 09/21/2020
8331507-Sewer Connection Fee $540.00 $540.00 Paid 09/21/2020
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 09/21/2020
8350015-Water Meter Fee $455.54 $455.54 Paid 09/21/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 10/7/2020 (3:00) 10/7/2020 10/07/2020
Erosion Control Inspection Residential Failed 11/16/2020
Misc
Corrective Action Required
11/16/2020
-Erosion control requires continuous maintenance, repair damaged sections within two business days -Immediate Street clean up required
Underslab Plumbing Inspection - Residential Passed 11/16/2020 11/16/2020 11/16/2020
Erosion Control Inspection Residential Failed 2/23/2021 02/23/2021
Misc
Corrective Action Required
11/16/2020
-Erosion control requires continuous maintenance, repair damaged sections within two business days
Electrical Service Inspection Passed 2/23/2021 2/23/2021 02/23/2021
Gas Service Inspection - Residential Passed 2/23/2021 2/23/2021 02/23/2021
All Rough Inspection - Residential Failed 2/23/2021 2/23/2021 02/23/2021
Misc
Corrective Action Required
02/23/2021
**PROVIDE AN APPROVED SET OF PLAN ON SITE **REPAIR EROSION CONTROL. NO FURTHER INSPECTION IF EROSION CONTROL IS NOT IN COMPLIANCE FRAMING: -Nail the garage PFH wall sheathing to sill plates and lvl header per code; anchor walls with 2” washers -Fb garage chase from ceiling joist space -Anchor garage sill plates within 12” of break -Frame wall open at kitchen hood -Insulate first, then solid block cantilevered joists above exterior kitchen wall and in basement -Toe nail joists to wall top plates with 4-8d or 3-10d -Support joists to I beam with proper devices -Have engineer address I beam with width not fully supported at stair wall -Solid block support underneath lvl beam (beam between foyer and living room) point load -Install hanger support for ceiling joists connections to lvl beam above the stair/bathroom -Fb all low voltage cable penetrations -Install roof support purlin for rafters above rear corner bedroom (NE) -Provide full support for lvl beam at rear bathroom exterior wall; this beam is being supported by a non-bearing wall -Nail wall corner studs at master bathroom tub -Provide tempered glass window at master bathroom tub MECHANICAL: -Vent all bath fans PLUMBING: -Vent tub and shower traps -Support DVW at interval 4 ft or less -Provide vent available for future basement bathroom ELECTRICAL: -Provide a receptacle for foyer wall wider than 3 ft (for foyer larger than 60 sq ft). **OK TO INSULATE
All Rough Inspection - Residential Failed 3/2/2021 3/2/2021 03/02/2021
Misc
Corrective Action Required
02/23/2021
FRAMING: -Nail the garage PFH wall sheathing to lvl header per code -Insulate first, then solid block cantilevered joists above exterior kitchen wall -Toe nail joists to wall top plates with 4-8d or 3-10d -Provide tempered glass window at master bathroom tub -Install interior bracing per plan ELECTRICAL: -Provide a receptacle for foyer wall wider than 3 ft (for foyer larger than 60 sq ft).
All Rough Inspection - Residential Failed 3/4/2021 3/4/2021 03/04/2021
Misc
Corrective Action Required
03/02/2021
FRAMING: -Nail the garage PFH wall sheathing to lvl header per code -Insulate first, then solid block cantilevered joists above exterior kitchen wall -Toe nail joists to wall top plates with 4-8d or 3-10d -Provide tempered glass window at master bathroom tub -Install interior bracing per plan
All Rough Inspection - Residential Passed 3/5/2021 3/5/2021 03/05/2021
Misc
Resolved
03/05/2021
FRAMING: -Insulate first, then solid block cantilevered joists above exterior kitchen wall -Toe nail joists to wall top plates with 4-8d or 3-10d -Provide tempered glass window at master bathroom tub -Install interior bracing per plan
Water Service Inspection - R Passed 4/9/2021 04/09/2021
Driveway Inspection Partial 4/26/2021 4/26/2021 04/26/2021
Misc
Informational
04/26/2021
Driveway - forms and materials pass pre-inspection.
Driveway Inspection Passed 4/28/2021 4/28/2021 04/29/2021
Misc
Informational
04/26/2021
Driveway - forms and materials pass pre-inspection. 4/29/21 Thursday Driveway - passed final inspection.
Sewer Service Inspection - R Passed 4/8/2021 (10:00) 4/8/2021 05/27/2021
Occupancy Inspection - Codes Residential Failed 5/27/2021 5/27/2021 05/27/2021
Resolved
05/27/2021
-Provide tempered glass window at master bathroom tub
Misc
Corrective Action Required
05/27/2021
**EROSION CONTROL SHALL BE REPAIRED ALONG THE STREET. MUD RUNOFF MUST BE CLEANED OFF THE STREET IMMEDIATELY -Final grade, sod, downspout and sump pump extensions -Install window well ladder -Paint gas service piping to protect against corrosion -Nail all holes at rear patio Simpson post support bases -Check rear patio roof for damage -Garage door bottom track support bracket must be @ 10” above floor per design -Replace broken furnace&WH interconnecting fitting -Provide AFCI protectiotn for all outlets required per NEC 210.12 (entry, washer, fireplace, kitchen)
Occupancy Inspection - Codes Residential Failed 5/28/2021 5/28/2021 05/28/2021
Misc
Corrective Action Required
05/27/2021
**EROSION CONTROL SHALL BE REPAIRED ALONG THE STREET. MUD RUNOFF MUST BE CLEANED OFF THE STREET IMMEDIATELY -Final grade, sod, downspout and sump pump extensions -Install window well ladder -Paint gas service piping to protect against corrosion -Nail all holes at rear patio Simpson post support bases -Check rear patio roof for damage -Replace broken furnace&WH interconnecting fitting **screw the connection -Provide AFCI protectiotn for all outlets required per NEC 210.12 (entry, kitchen A recept)
Occupancy Inspection - Codes Residential Temporary C of O 6/1/2021 6/1/2021 06/01/2021
Misc
Corrective Action Required
05/28/2021
-Final grade, sod, downspout and sump pump extensions
Erosion Control Inspection Residential Passed 06/01/2021
Misc
Resolved
05/27/2021
-Erosion control requires continuous maintenance, repair damaged sections within two business days
Occupancy Inspection - Codes Residential Full C of O 6/29/2021 6/29/2021 06/29/2021
Misc
Resolved
06/29/2021
-Final grade, sod, downspout and sump pump extensions
Documents & Images
Date Uploaded File Type Document Name
09/01/2020 Application Form Permit Application
09/01/2020 Application Form License Tax Application
09/10/2020 Letter Codes Residential Plan Review
09/15/2020 Plot Plan Approved Plot Plan
09/21/2020 Approved Plans Approved Drawings
09/21/2020 Receipt Receipt for transaction:2020-006379
09/21/2020 Letter DS Building Permit
10/07/2020 Letter INSPECTION SUMMARY
11/16/2020 Letter INSPECTION SUMMARY
11/16/2020 Letter INSPECTION SUMMARY
01/31/2021 Final_2021_01_21_DPier_LSMO_Pat Cochran Concrete
02/23/2021 Letter INSPECTION SUMMARY
02/23/2021 Letter INSPECTION SUMMARY
02/23/2021 Letter INSPECTION SUMMARY
02/23/2021 Letter INSPECTION SUMMARY
03/02/2021 Letter INSPECTION SUMMARY
03/04/2021 Letter INSPECTION SUMMARY
03/05/2021 Letter INSPECTION SUMMARY
04/08/2021 Letter INSPECTION SUMMARY
04/09/2021 Letter INSPECTION SUMMARY
04/26/2021 Letter INSPECTION SUMMARY
04/29/2021 Letter INSPECTION SUMMARY
04/29/2021 Letter INSPECTION SUMMARY
05/27/2021 Letter INSPECTION SUMMARY
05/27/2021 Letter INSPECTION SUMMARY
05/28/2021 Letter INSPECTION SUMMARY
06/01/2021 Letter INSPECTION SUMMARY
06/01/2021 Letter Codes Temporary Certificate of Occupancy
06/29/2021 Letter Field Certificate of Occupancy
06/29/2021 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home