Permit Application Status

PRRES20200262


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20200262
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - COVERED PATIO - FINISHED BASEMENT - ENGINEERED FLOOR SYSTEM
02/04/2020
02/10/2020
03/08/2021
Locations
Contacts
JFE CONSTRUCTION INC, Address:1314 SW MARKET ST, Phone:(816) 470-0074  
PERMITTING@JFECONSTRUCTION.COM  
MIKE BRYANT HEATING & COOLING , Address:1711 E 123RD , Phone:(913) 441-7807  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
A BRIGHT PLUMBING LLC, Address:201 NE WOODBURY DR, Phone:(816) 867-4540  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 02/06/2020 02/10/2020
Development Center
As-graded plot plan
Corrective Action Required
02/04/2020

A as-graded plot plan per Section 7-160, Code of Ordinances, is required prior to occupancy.
Residential Plan Review Approved 02/06/2020 02/04/2020
Dylan Eppert
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,454.93 $1,454.93 Paid 02/10/2020
8331507-Sewer Connection Fee $600.00 $600.00 Paid 02/10/2020
Water Tap Fee $3,477.00 $3,477.00 Paid 02/10/2020
Water Meter Fee $425.02 $425.02 Paid 02/10/2020
Right of Way Permit Fee $80.00 $80.00 Paid 02/10/2020
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 02/10/2020
Valuation Fee New Single Family $55.02 $55.02 Paid 11/03/2020
$1,509.95
8331507-Sewer Connection Fee $30.00 $30.00 Paid 11/03/2020
$600.00
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 3/6/2020 3/6/2020 03/06/2020
Underslab Plumbing Inspection - Residential Passed 3/26/2020 3/26/2020 03/26/2020
Water Service Inspection - R Partial 4/3/2020 04/03/2020
Sewer Service Inspection - R Passed 4/3/2020 4/3/2020 04/03/2020
Water Service Inspection - R Passed 4/7/2020 4/7/2020 at 11:26 AM 04/07/2020
All Rough Inspection - Residential Partial 7/7/2020 7/7/2020 07/07/2020
Misc
Informational
07/07/2020
- GARAGE PORTAL FRAMEING ONLY - HOLD DOWNS NAILED OFF, NAILING PATTERN 3" OC OK TO COVER -
Piers/Caissons Inspection - Residential Passed 3/3/2020 08/21/2020
Misc
Informational
08/21/2020
- 3RD PARTY DRILLED PIERS & DECK PIERS BY TODD LANGENHORST SIGNED & SEALED BY CHAD STREETER -
Gas Piping Inspection - Residential Passed 8/24/2020 08/24/2020
Gas Service Inspection - Residential Passed 8/24/2020 8/24/2020 08/24/2020
Electrical Service Inspection Passed 8/24/2020 8/24/2020 08/24/2020
All Rough Inspection - Residential Failed 8/24/2020 8/24/2020 08/24/2020
Misc
Informational
07/07/2020
- GARAGE PORTAL FRAMING ONLY - HOLD DOWNS NAILED OFF, NAILING PATTERN 3" OC OK TO COVER -
Misc
Corrective Action Required
08/24/2020
- SEAL BORES TOP & BOTTOM PLATE DEAD SPACE @ MASTER SHOWER - - NAIL JOIST HANGER MASTER BEDROOM CEILING - - WHERE JOIST IS PARALLEL TO FOUNDATION PROVIDE SOLID BLOCKINH 32" C PER PLAN - - PROVIDE STRAP AT MIDPOINT VERTICAL 2" DWV OR SMALLER - - STRAP 4 TOP PLATES EXTERIOR WALL MASTER BEDROOM W/ 18 GA 24" LONG STRAP - - ADDRESS RAFTERS LANDING ON MULTIPLE BLOCKS THROUGHOUT -
All Rough Inspection - Residential Passed 8/27/2020 8/27/2020 08/27/2020
Misc
Informational
08/24/2020
- GARAGE PORTAL FRAMING ONLY - HOLD DOWNS NAILED OFF, NAILING PATTERN 3" OC OK TO COVER -
Misc
Resolved
08/27/2020
Driveway Inspection Partial 9/21/2020 9/21/2020 09/21/2020
Misc
Informational
09/21/2020
Forms were placed and aggregate was present and compacted. RP 9-21-20
Sidewalk Inspection Partial 9/21/2020 (A.M.) 9/21/2020 09/21/2020
Misc
Informational
09/21/2020
Forms were placed and aggregate was present and compacted. I informed them about brush finish only, plus white cure. RP 9-21-20
Driveway Inspection Passed 9/25/2020 9/25/2020 09/25/2020
Misc
Informational
09/21/2020
Forms were placed and aggregate was present and compacted. RP 9-21-20
Misc
Informational
09/25/2020
Finished driveway meets LS and ADA specs. RP 9-25-20
Sidewalk Inspection Passed 9/25/2020 9/25/2020 09/25/2020
Misc
Informational
09/21/2020
Forms were placed and aggregate was present and compacted. I informed them about brush finish only, plus white cure. RP 9-21-20
Misc
Informational
09/25/2020
Finished sidewalk meets LS and ADA specs. RP 9-25-20
Plot Plan Inspection Failed 10/14/2020 10/14/2020
Miscellaneous Correction
Corrective Action Required
10/14/2020
-grade shall fall not less than 6” within the first 10’ from the foundation -6” clearance from grade below to wood siding or sheathing -remove excavation spoils from site
Plot Plan Inspection Passed 10/23/2020 10/23/2020
Miscellaneous Correction
Resolved
10/23/2020
-grade shall fall not less than 6” within the first 10’ from the foundation -6” clearance from grade below to wood siding or sheathing -remove excavation spoils from site
All Rough Inspection - Residential Failed 12/3/2020 12/3/2020 12/03/2020
Misc
Corrective Action Required
12/03/2020
-Fireblock vertical to horizontal at top plate and vertically at 10’ intervals horizontally of set out construction -Fireblock soffit to wall connections, beam pockets and at steel columns -Seal penetrations in studs where cavities are used as return plenum -Fireblock all top plate penetrations and penetrations in Fireblock made by other trades -Panel GFCI receptacle is no longer accessible -Spray foam in unfinished area to comply with section R316 of the 2018 IRC -Fireblock vertical to horizontal between top plates at bedroom/tub walls
All Rough Inspection - Residential Partial 12/4/2020 12/4/2020 12/04/2020
Misc
Corrective Action Required
12/03/2020
-Spray foam in unfinished area to comply with section R316 of the 2018 IRC OK TO INSULATE AND ROCK
Occupancy Inspection - Codes Residential Temporary C of O 1/27/2021 1/27/2021 01/27/2021
Misc
Corrective Action Required
01/27/2021
-Lawn irrigation permit required -Provide sod -Seal top and sides of exterior lighting exposed to the elements, Electric meter enclosure, AC disconnect -Seal all exterior penetrations -Downspouts to discharge minimum 36 inches from foundation -Secure receptacle device to outlet box above exterior fireplace -Identify white insulated Conductors used as current caring Conductors at both points of termination, Condensing unit circuit TCO valid through 02/27/2021
Occupancy Inspection - Codes Residential Temporary C of O 2/3/2021 3/5/2021 02/22/2021
Misc
Corrective Action Required
01/27/2021
-Lawn irrigation permit required -Provide sod -Seal top and sides of exterior lighting exposed to the elements, Electric meter enclosure, AC disconnect -Seal all exterior penetrations -Downspouts to discharge minimum 36 inches from foundation -Secure receptacle device to outlet box above exterior fireplace -Identify white insulated Conductors used as current caring Conductors at both points of termination, Condensing unit circuit TCO EXTENSION VALID THROUGH 03/27/2021 DUE TO WEATHER CONDITIONS
Occupancy Inspection - Codes Residential Full C of O 3/8/2021 3/8/2021 03/08/2021
Misc
Resolved
03/08/2021
-Lawn irrigation permit required -Provide sod -Seal top and sides of exterior lighting exposed to the elements, Electric meter enclosure, AC disconnect -Seal all exterior penetrations -Downspouts to discharge minimum 36 inches from foundation -Secure receptacle device to outlet box above exterior fireplace -Identify white insulated Conductors used as current caring Conductors at both points of termination, Condensing unit circuit TCO EXTENSION VALID THROUGH 03/27/2021 DUE TO WEATHER CONDITIONS
All Rough Inspection - Residential Passed 03/08/2021
Misc
Resolved
03/08/2021
-Spray foam in unfinished area to comply with section R316 of the 2018 IRC OK TO INSULATE AND ROCK
Erosion Control Inspection Residential Passed 03/08/2021
Documents & Images
Date Uploaded File Type Document Name
02/07/2020 Letter Codes Residential Plan Review
02/10/2020 Receipt Receipt for transaction: 2020-000518
02/10/2020 Letter DS Building Permit
02/11/2020 Plot Plan DOC021020-02102020104059
02/11/2020 Drawing DOC021020-02102020104129
03/06/2020 Letter INSPECTION SUMMARY
03/09/2020 Engineer Report/Study 149 NW Carson Dr_PIER INSP_2020-03-03
04/03/2020 Letter INSPECTION SUMMARY
04/03/2020 Letter INSPECTION SUMMARY
04/03/2020 Engineer Report/Study Final_2020.04.01_GBSlab_LSMO_Concrete Design
04/07/2020 Letter INSPECTION SUMMARY
07/07/2020 Letter INSPECTION SUMMARY
08/21/2020 Engineer Report/Study 149 NW Carson Dr_PIER INSP_2020-03-03
08/21/2020 Engineer Report/Study WV #1435_149 NW CARSON DR_PIER PLAN_2-21-20
08/24/2020 Letter INSPECTION SUMMARY
08/24/2020 Letter INSPECTION SUMMARY
08/24/2020 Letter INSPECTION SUMMARY
08/24/2020 Letter INSPECTION SUMMARY
08/26/2020 Letter 149 NW Carson Drive_Framing Evaluation Report_8-26-20
08/27/2020 Letter INSPECTION SUMMARY
08/27/2020 Letter INSPECTION SUMMARY
08/27/2020 Letter INSPECTION SUMMARY
09/21/2020 Letter INSPECTION SUMMARY
09/21/2020 Letter INSPECTION SUMMARY
09/25/2020 Letter INSPECTION SUMMARY
09/25/2020 Letter INSPECTION SUMMARY
10/13/2020 Plot Plan APPROVED AS-BUILT
10/14/2020 Letter INSPECTION SUMMARY
10/22/2020 Plot Plan APPROVED AS-BUILT
10/23/2020 Letter INSPECTION SUMMARY
11/03/2020 1830_001
11/03/2020 Plans APPROVED BASEMENT PLAN
11/03/2020 Receipt Receipt for transaction:2020-007345
12/03/2020 Letter INSPECTION SUMMARY
12/04/2020 Letter INSPECTION SUMMARY
01/27/2021 Letter Codes Temporary Certificate of Occupancy
01/27/2021 Letter INSPECTION SUMMARY
02/22/2021 Letter Codes Temporary Certificate of Occupancy
03/08/2021 Letter Codes Final Certificate of Occupancy
03/08/2021 Letter Field Certificate of Occupancy
03/08/2021 Letter INSPECTION SUMMARY
03/08/2021 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home