PRRES20193345
Building Permit - Residential
Certificate of Occupancy
CMH PARKS INC
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT
11/13/2019
11/19/2019
11/13/2019
Locations
Contacts
CMH PARKS INC, Address:5000 CLAYTON RD  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
DUSTIN@SUMMITHOMESKC.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 11/15/2019 11/14/2019
Kim Brennan
Residential Plan Review Approved 11/15/2019 11/14/2019
Kim Brennan
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,299.54 $1,299.54 Paid 11/19/2019
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 11/19/2019
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 11/19/2019
8331504-EFHB Middle Big Creek, Full $602.64 $602.64 Paid 11/19/2019
8331507-Sewer Connection Fee $540.00 $540.00 Paid 11/19/2019
8331401-Water Tap Fee $3,477.00 $3,477.00 Paid 11/19/2019
8350015-Water Meter Fee $425.02 $425.02 Paid 11/19/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 1/6/2020 01/06/2020
Underslab Plumbing Inspection - Residential Failed 2/10/2020 2/10/2020 02/10/2020
Misc
Corrective Action Required
02/10/2020
- Interior drain tile is not complete and connected to sump basin - DWV covered in mud and water in areas. Please make all DWV available for inspection
Sewer Service Inspection - R Passed 2/10/2020 (1:00) 2/10/2020 02/10/2020
Water Service Inspection - R Passed 2/11/2020 02/11/2020
Underslab Plumbing Inspection - Residential Passed 2/20/2020 2/20/2020 02/20/2020
Misc
Resolved
02/20/2020
Piers/Caissons Inspection - Residential Passed 4/3/2020 (9:00) 4/3/2020 04/03/2020
Misc
Informational
04/03/2020
(2) 24 X 36 PIERS
Electrical Service Inspection Passed 5/15/2020 5/15/2020 05/15/2020
Gas Service Inspection - Residential Passed 5/15/2020 5/15/2020 05/15/2020
Gas Piping Inspection - Residential Passed 5/15/2020 05/15/2020
All Rough Inspection - Residential Failed 5/15/2020 5/15/2020 05/15/2020
Misc
Corrective Action Required
05/15/2020
- Fireblock all tubs and shower traps - Complete DWV 2nd floor above garage - Seal all penetrations at top and sill plates - Address proper Fireblock 1st floor chase and all fir out dead spaces on 1st floor, areas are too large to support loose insulation as Fireblock - Address PEX in 1st floor chase, within 6” of flue vent - Protection plates required for NM within 1 1/4”of stud member end - Truss hangers per plan - Address notched truss in garage by single car bay - Remove front porch and rear patio lids to expose truss hangers for inspection - Complete garage PFH per plans - EC#2 800 lb hold downs per plans - Protect and support PEX at showers
All Rough Inspection - Residential Failed 5/19/2020 5/19/2020 05/19/2020
Misc
Corrective Action Required
05/15/2020
- Fireblock all tubs and shower traps- master bath - Complete DWV 2nd floor above garage - Seal all penetrations at top and sill plates - Seal gaps in Fireblocking 1st floor chase and all fir out dead spaces - Address PEX in 1st floor chase, within 6” of flue vent - Protection plates required for NM within 1 1/4”of stud member end - Truss hangers per plan - Address notched truss in garage by single car bay - Remove front porch and rear patio lids to expose truss hangers for inspection - Complete garage PFH per plans - EC#2 800 lb hold downs per plans
All Rough Inspection - Residential Failed 5/21/2020 5/21/2020 05/21/2020
Misc
Corrective Action Required
05/19/2020
- Fireblock all tubs and shower traps- master bath - Complete DWV 2nd floor above garage - Address notched truss in garage by single car bay
All Rough Inspection - Residential Passed 5/22/2020 5/22/2020 05/22/2020
Misc
Resolved
05/22/2020
Driveway Inspection Partial 6/1/2020 (P.M.) 6/1/2020 06/01/2020
Misc
Informational
06/01/2020
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Driveway Inspection Passed 6/5/2020 6/5/2020 06/09/2020
Misc
Informational
06/01/2020
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Occupancy Inspection - Codes Residential Failed 9/17/2020 9/17/2020 09/17/2020
Misc
Corrective Action Required
09/17/2020
- Label dedicated receptacle in garage as not GFCI protected - AFCI protection required per code E3902.16 - Bathroom circuit(s) 1st and 2nd floor are not allowed to supply any other outlets, besides bathroom sink receptacles. E3703.4 - Kitchen circuit is not allowed to supply exterior GFCI receptacle at back porch E3703.2 - Place splash blocks at all downspout and sump pump discharge locations, minimum discharge distance 36” from foundation - Obtain lawn irrigation system permit
Occupancy Inspection - Codes Residential Temporary C of O 9/18/2020 9/18/2020 09/18/2020
Misc
Corrective Action Required
09/17/2020
- Obtain lawn irrigation system permit OK for TCO
Plot Plan Inspection Passed 10/09/2020
Occupancy Inspection - Codes Residential Full C of O 10/9/2020 10/9/2020 10/09/2020
Misc
Resolved
10/09/2020
Documents & Images
Date Uploaded File Type Document Name
11/19/2019 Receipt Receipt for transaction: 2019-007380
11/19/2019 Letter DS Building Permit
11/21/2019 Plot Plan DOC112019-11202019153906
01/06/2020 Letter INSPECTION SUMMARY
01/06/2020 A885598F-686D-46B4-BC67-B57B08E83776
01/06/2020 0ED554DB-EFF9-40BD-804E-748FABC28A04
02/10/2020 Letter INSPECTION SUMMARY
02/10/2020 Letter INSPECTION SUMMARY
02/11/2020 Letter INSPECTION SUMMARY
02/20/2020 Letter INSPECTION SUMMARY
04/03/2020 Letter INSPECTION SUMMARY
05/15/2020 Letter INSPECTION SUMMARY
05/15/2020 Letter INSPECTION SUMMARY
05/15/2020 Letter INSPECTION SUMMARY
05/15/2020 Letter INSPECTION SUMMARY
05/19/2020 Letter INSPECTION SUMMARY
05/21/2020 Letter INSPECTION SUMMARY
05/21/2020 MN61 Truss Fix
05/22/2020 Letter INSPECTION SUMMARY
06/01/2020 Letter INSPECTION SUMMARY
06/09/2020 Letter INSPECTION SUMMARY
09/17/2020 Letter INSPECTION SUMMARY
09/18/2020 Letter Codes Temporary Certificate of Occupancy
10/09/2020 Letter INSPECTION SUMMARY
10/09/2020 Letter Field Certificate of Occupancy
10/09/2020 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home