Permit Application Status

PRRES20193015


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20193015
Building Permit - Residential
Certificate of Occupancy
CMH PARKS INC
NEW SINGLE FAMILY
NEW SINGLE FAMILY UNFINISHED BASEMENT COVERED PATIO
10/14/2019
10/18/2019
05/27/2020
Locations
Contacts
CMH PARKS INC, Address:5000 CLAYTON RD  
KIMBEL MECHANICAL SYSTEMS, INC, Address:1936 N SHILOH DR, Phone:(479) 756-1099  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
PERMITTING@SUMMITHOMESKC.COM  
CLAYTON PROPERTIES GROUP, INC, Address:10450 Holmes Rd Suite 100, Phone:(816) 246-6700  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 10/16/2019 10/17/2019
Steve Conrick
As-graded plot plan
Corrective Action Required
10/15/2019

A as-graded plot plan per Section 7-160, Code of Ordinances, is required prior to occupancy.
City infrustructure
Corrective Action Required
10/15/2019

Show all manholes, water valve boxes, fire hydrants, and stormwater structures. Missing FH and WV
Residential Plan Review Approved 10/16/2019 10/15/2019
Steve Conrick
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,021.07 $1,021.07 Paid 10/18/2019
Right of Way Permit Fee $80.00 $80.00 Paid 10/18/2019
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 10/18/2019
8331507-Sewer Connection Fee $360.00 $360.00 Paid 10/18/2019
Water Tap Fee $3,477.00 $3,477.00 Paid 10/18/2019
Water Meter Fee $425.02 $425.02 Paid 10/18/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 11/5/2019 (1:00) 11/5/2019 11/05/2019
Underslab Plumbing Inspection - Residential Passed 11/22/2019 11/22/2019 11/22/2019
Sewer Service Inspection - R Passed 2/26/2020 02/26/2020
Water Service Inspection - R Passed 2/27/2020 (1:00) 2/27/2020 02/27/2020
Gas Piping Inspection - Residential Passed 2/28/2020 2/28/2020 02/28/2020
Gas Service Inspection - Residential Failed 2/28/2020 02/28/2020
Misc
Corrective Action Required
02/28/2020
Provide bond gas line
Electrical Service Inspection Failed 2/28/2020 2/28/2020 02/28/2020
Misc
Corrective Action Required
02/28/2020
Provide bond gas line
All Rough Inspection - Residential Failed 2/28/2020 2/28/2020 02/28/2020
Misc
Corrective Action Required
02/28/2020
Maintain silt fence. Provide bond gas line. Provide hanger HGUS28-2 truss C-1 per truss layout. Provide PFH portal frame garage per plan Min (1) 5/8 anchor bolt , double bottom plate.
Misc
Corrective Action Required
02/28/2020
Maintain silt fence. Provide bond gas line. Provide hanger HGUS28-2 truss C-1 per truss layout. Provide PFH portal frame garage per plan Min (1) 5/8 anchor bolt , double bottom plate. Provide pier inspection patio post.
Gas Service Inspection - Residential Passed 3/4/2020 3/4/2020 03/04/2020
Misc
Resolved
03/04/2020
Electrical Service Inspection Passed 3/4/2020 3/4/2020 03/04/2020
Misc
Resolved
03/04/2020
All Rough Inspection - Residential Passed 3/5/2020 3/4/2020 03/04/2020
Misc
Resolved
03/04/2020
Misc
Resolved
03/04/2020
Erosion Control Inspection Residential Failed 4/17/2020 04/17/2020
DCM5 ESC INSP DENIED
Corrective Action Required
04/17/2020
- MAINTAIN SILT FENCE UNTIL SOD -
Occupancy Inspection - Codes Residential Failed 4/30/2020 4/30/2020 04/30/2020
Misc
Corrective Action Required
04/30/2020
- Submit as graded plot plan for review - - Hammer arrestors at laundry and kitchen - - Sliding patio door locks and handle - - Submit pier inspection report -
Driveway Inspection Passed 4/10/2020 (A.M.) 4/10/2020 05/11/2020
Misc
Informational
04/10/2020
Driveway is ready to pour. Inspected forms and subgrade. They meet approval and pass inspection. Will come back to finalize inspection later to day when drive is poured.
Misc
Informational
05/11/2020
Drive approach visual inspection passes city standards.
Occupancy Inspection - Codes Residential Failed 5/14/2020 5/14/2020 05/14/2020
Misc
Corrective Action Required
04/30/2020
-NO FURTHER TCO’s WITHOUT APPROVED AS GRADED PLOT PLANS - Submit as graded plot plan for review - - Submit pier inspection report -
Occupancy Inspection - Codes Residential Temporary C of O 05/19/2020
Misc
Corrective Action Required
05/14/2020
Per email with Spencer As-graded is in process and weill be submitted Asap. 2 week tco issued.
Plot Plan Inspection Passed 5/27/2020 05/27/2020
Occupancy Inspection - Codes Residential Full C of O 6/1/2020 05/27/2020
Misc
Resolved
05/27/2020
Per email with Spencer As-graded is in process and weill be submitted Asap. 2 week tco issued.
Documents & Images
Date Uploaded File Type Document Name
10/15/2019 Letter Codes Residential Plan Review
10/18/2019 Receipt Receipt for transaction: 2019-006878
10/18/2019 Letter DS Building Permit
10/18/2019 Plot Plan DOC101819-004
11/05/2019 Letter INSPECTION SUMMARY
11/22/2019 Letter INSPECTION SUMMARY
02/26/2020 Letter INSPECTION SUMMARY
02/27/2020 Letter INSPECTION SUMMARY
02/28/2020 Letter INSPECTION SUMMARY
02/28/2020 Letter INSPECTION SUMMARY
02/28/2020 Letter INSPECTION SUMMARY
02/28/2020 Letter INSPECTION SUMMARY
03/04/2020 Letter INSPECTION SUMMARY
03/04/2020 Letter INSPECTION SUMMARY
03/04/2020 Letter INSPECTION SUMMARY
04/17/2020 Letter INSPECTION SUMMARY
04/30/2020 Letter INSPECTION SUMMARY
05/14/2020 Letter INSPECTION SUMMARY
05/14/2020 Letter INSPECTION SUMMARY
05/19/2020 Letter Codes Temporary Certificate of Occupancy
05/26/2020 LOT 31 ASBUILT (002)
05/27/2020 Letter INSPECTION SUMMARY
05/27/2020 Letter Field Certificate of Occupancy
05/27/2020 Letter Codes Final Certificate of Occupancy
06/03/2020 LOT 31 ASBUILT
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home