Summary
PRRES20191394
Building Permit - Residential
Certificate of Occupancy
HUNT MIDWEST RESIDENTIAL LLC
NEW SINGLE FAMILY
NEW HOUSE - COVERED PATIO - UNFINISHED BASEMENT
05/30/2019
06/10/2019
02/13/2020
Locations
Contacts
HUNT MIDWEST RESIDENTIAL LLC, Address:8300 NE UNDERGROUND DR  
IQ CONSTRUCTION, Address:P O BOX 6423, Phone:(816) 582-8100  
JENNIFER@IQHOMEBUILDERS.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
SAFEHOUSE ELECTRIC COMPANY, Address:P O BOX 1833, Phone:(816) 935-8113  
FIVE STAR PLUMBING INC, Address:P O BOX 452, Phone:(816) 228-8821  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 06/03/2019 06/05/2019
Steve Conrick
As-graded plot plan
Corrective Action Required
06/03/2019

A as-graded plot plan per Section 7-160, Code of Ordinances, is required prior to occupancy. *As-graded plot plan is required
Residential Plan Review Approved 06/03/2019 05/30/2019
Dylan Eppert
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $984.67 $984.67 Paid 06/10/2019
8331507-Sewer Connection Fee $450.00 $450.00 Paid 06/10/2019
8331401-Water Tap Fee $3,409.00 $3,409.00 Paid 06/10/2019
8350015-Water Meter Fee $408.37 $408.37 Paid 06/10/2019
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 06/10/2019
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 06/10/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Residential Passed 7/9/2019 7/9/2019 07/09/2019
Sewer Service Inspection - R Passed 7/16/2019 7/16/2019 07/16/2019
Water Service Inspection - R Partial 7/17/2019 7/17/2019 07/17/2019
Water Service Inspection - R Passed 7/18/2019 (11:00) 7/18/2019 07/18/2019
Electrical Service Inspection Passed 8/28/2019 8/28/2019 08/28/2019
Gas Service Inspection - Residential Passed 8/28/2019 8/28/2019 08/28/2019
Miscellaneous Correction
Resolved
08/28/2019
All Rough Inspection - Residential Failed 8/28/2019 8/28/2019 08/28/2019
Miscellaneous Correction
Corrective Action Required
08/28/2019
** Draft block plumbing fur down in garage ** ** Okay to insulate **
Piers/Caissons Inspection - Residential Passed 9/3/2019 09/03/2019
All Rough Inspection - Residential Passed 9/5/2019 9/5/2019 09/05/2019
Miscellaneous Correction
Resolved
09/05/2019
** Draft block plumbing fur down in garage ** ** Okay to insulate **
Driveway Inspection Partial 10/23/2019 (P.M.) 10/23/2019 10/23/2019
Misc
Informational
10/23/2019
The forms are set and there appears to be sufficient compacted aggregate.
Sidewalk Inspection Partial 10/23/2019 (P.M.) 10/23/2019 10/23/2019
Misc
Informational
10/23/2019
The forms are set and there appears to be sufficient compacted aggregate.
Sidewalk Inspection Passed 10/30/2019 11/05/2019
Misc
Informational
10/23/2019
The forms are set and there appears to be sufficient compacted aggregate.
Driveway Inspection Passed 10/30/2019 11/05/2019
Misc
Informational
10/23/2019
The forms are set and there appears to be sufficient compacted aggregate.
Occupancy Inspection - Codes Residential Failed 2/11/2020 2/11/2020 02/11/2020
Misc
Corrective Action Required
02/11/2020
Provide footing inspection - Provide as graded plot plan prior to sodding. - Provide sod in 48 hours or replace silt fence. - Provide guardrail or raise grade to 30” front stoop - Provide hammer arrestor @ dishwasher - Provide two 3” screws each exterior door hinge and strike plates - Provide hammer arrestors laundry room -
Misc
Corrective Action Required
02/11/2020
Provide footing inspection - Provide as graded plot plan prior to sodding. - Provide sod in 48 hours or replace silt fence. - Provide guardrail or raise grade to 30” front stoop - Provide hammer arrestor @ dishwasher - Provide two 3” screws each exterior door hinge and strike plates - Provide hammer arrestors laundry room - Permits pulled after April 1, 2019shall meet code (NEC 2017)requirements Dish washer & laundry outlets GFCI protection per 210.8 (A) and (D) Provide handrail basement stairway - Secure conduit at meter can -
Misc
Corrective Action Required
02/11/2020
Provide footing inspection - Provide as graded plot plan prior to sodding. - Provide sod in 48 hours or replace silt fence. - Provide guardrail or raise grade to 30” front stoop - Provide hammer arrestor @ dishwasher - Provide two 3” screws each exterior door hinge and strike plates - Provide hammer arrestors laundry room - Permits pulled after April 1, 2019shall meet code (NEC 2017)requirements Dish washer & laundry outlets GFCI protection per 210.8 (A) and (D) Provide handrail basement stairway - Secure conduit at meter can -
Footing Inspection - Residential Passed 6/14/2019 02/12/2020
Gas Piping Inspection - Residential Passed 8/28/2019 02/13/2020
Miscellaneous Correction
Corrective Action Required
08/28/2019
** Draft block plumbing fur down in garage ** ** Okay to insulate **
Occupancy Inspection - Codes Residential Temporary C of O 2/13/2020 2/13/2020 02/13/2020
Misc
Resolved
02/13/2020
Misc
Resolved
03/25/2020
Provide as graded plot plan prior to sodding. - Provide sod in 48 hours or replace silt fence. -
Misc
Resolved
02/13/2020
Plot Plan Inspection Passed 3/25/2020 03/25/2020
Occupancy Inspection - Codes Residential Full C of O 3/25/2020 03/25/2020
Misc
Resolved
03/25/2020
Misc
Resolved
03/25/2020
Misc
Resolved
03/25/2020
Documents & Images
Date Uploaded File Type Document Name
06/03/2019 Letter Codes Residential Plan Review
06/10/2019 Receipt Receipt for transaction: 2019-003433
06/10/2019 Letter Codes Building Permit
06/12/2019 Plot Plan DOC061219-06122019083040
07/09/2019 Letter INSPECTION SUMMARY
07/16/2019 Letter INSPECTION SUMMARY
07/17/2019 Letter INSPECTION SUMMARY
07/18/2019 Letter INSPECTION SUMMARY
08/28/2019 Letter INSPECTION SUMMARY
08/28/2019 Letter INSPECTION SUMMARY
08/28/2019 Letter INSPECTION SUMMARY
08/28/2019 Letter INSPECTION SUMMARY
08/28/2019 Letter INSPECTION SUMMARY
09/03/2019 Letter INSPECTION SUMMARY
09/05/2019 Letter INSPECTION SUMMARY
10/23/2019 Letter INSPECTION SUMMARY
10/23/2019 Letter INSPECTION SUMMARY
11/05/2019 Letter INSPECTION SUMMARY
11/05/2019 Letter INSPECTION SUMMARY
02/11/2020 Letter INSPECTION SUMMARY
02/11/2020 Letter INSPECTION SUMMARY
02/13/2020 Letter Codes Temporary Certificate of Occupancy
03/24/2020 Plot Plan LOT 675 ASBUILT
03/25/2020 Letter INSPECTION SUMMARY
03/25/2020 Letter Field Certificate of Occupancy
03/25/2020 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home