Permit Application Status

PRRES20190741


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20190741
Building Permit - Residential
Certificate of Occupancy
ASPEN HOMEBUILDERS LLC
NEW SINGLE FAMILY
NEW HOUSE, FINISHED/UNFINISHED BASEMENT, COVERED DECK
03/29/2019
04/19/2019
05/22/2020
Locations
Contacts
ASPEN HOMEBUILDERS LLC, Address:6618 ROYAL ST STE B  
ASPEN HOME BUILDERS LLC, Address:6618 ROYAL ST #B, Phone:(816) 507-0123  
STEVE@ASPENHOMESKC.COM  
MIDWEST HEATING COOLING & PLUMBING, Address:13228 HOLMES RD, Phone:(816) 943-8513  
C-R ELECTRICAL LLC, Address:4539 RIDGEWAY, Phone:(816) 803-3500  
MILLER PLUMBING CO, Address:PO BOX 393 , Phone:(913) 851-1333  
Reviews
Review Type Outcome Est. Completion Date Completed
Residential Plan Review Approved 04/03/2019 04/17/2019
Dylan Eppert
37 Provide details for any walls over 10 feet in height.
Corrective Action Required
04/01/2019

Provide details for any walls over 10 feet in height. Include stud grade, size, spacing and actual, uninterrupted height. (IRC Section 602.3.1 and Table 602.3(5) & 602.3.1)
Plot Plan Review Approved 04/02/2019 04/04/2019
Kim Brennan
Deck location
Corrective Action Required
03/29/2019

Deck location, with dimensions to property lines must be provided on the plot plan.
Rear yard dimension
Corrective Action Required
03/29/2019

The rear yard demision(s) must be provided on the plot plan.
City infrustructure
Corrective Action Required
03/29/2019

Show all manholes, water valve boxes, fire hydrants, and stormwater structures. *Missing curb inlet. There is a leader, but no curb inlet.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,071.52 $1,071.52 Paid 04/19/2019
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 04/19/2019
8331507-Sewer Connection Fee $420.00 $420.00 Paid 04/19/2019
8331401-Water Tap Fee $3,409.00 $3,409.00 Paid 04/19/2019
8350015-Water Meter Fee $408.37 $408.37 Paid 04/19/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 5/20/2019 (11:00) 5/20/2019 05/20/2019
Miscellaneous Correction
Corrective Action Required
05/20/2019
Need city approved red stamp plans for further inpsections, ok to pour
Sewer Service Inspection - R Passed 6/3/2019 06/03/2019
Water Service Inspection - R Passed 6/4/2019 (9:15) 6/4/2019 06/04/2019
Underslab Plumbing Inspection - Residential Passed 6/11/2019 6/11/2019 06/11/2019
Piers/Caissons Inspection - Residential Passed 8/14/2019 (10:30) 8/14/2019 08/14/2019
All Rough Inspection - Residential Failed 10/7/2019 10/7/2019 10/07/2019
Misc
Corrective Action Required
10/07/2019
- fire stop basement bedroom on north wall over window from fur down. -install 3 studs in basement wall see plans. --install 3/4" plywood for fire stopping over fire plans and dead spaces. --flue clearance basement wall tp plywood and framing --
Electrical Service Inspection Passed 10/7/2019 10/7/2019 10/07/2019
Gas Service Inspection - Residential Passed 10/7/2019 10/7/2019 10/07/2019
All Rough Inspection - Residential Passed 10/10/2019 10/10/2019 10/10/2019
Misc
Resolved
10/10/2019
Ok to insulate
Driveway Inspection Partial 12/23/2019 12/23/2019 12/23/2019
Misc
Informational
12/23/2019
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Driveway Inspection Passed 12/30/2019 01/02/2020
Misc
Informational
12/23/2019
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Occupancy Inspection - Codes Residential Failed 3/17/2020 3/16/2020 03/16/2020
Misc
Corrective Action Required
03/16/2020
- Handrail required on steps from garage to mud room - Breaker lockouts required on hardwired appliances - Place splashblocks at all downspout and sump pump discharge locations for minimum distance from foundation 36” - Final grade and sod - Seal around all exterior light fixtures
Occupancy Inspection - Codes Residential Failed 5/4/2020 5/4/2020 05/04/2020
Misc
Corrective Action Required
03/16/2020
- Obtain lawn irrigation system permit and submit backflow certification -
Gas Piping Inspection - Residential Passed 05/04/2020
Plot Plan Inspection Passed 5/4/2020 05/04/2020
Occupancy Inspection - Codes Residential Full C of O 5/22/2020 5/22/2020 05/22/2020
Misc
Resolved
05/22/2020
Documents & Images
Date Uploaded File Type Document Name
03/29/2019 Letter Codes Residential Plan Review
04/01/2019 Letter Codes Residential Plan Review
04/19/2019 Receipt Receipt for transaction: 2019-001510
04/19/2019 Letter Codes Building Permit
04/25/2019 Plot Plan DOC042519-04252019093449
05/20/2019 Letter INSPECTION SUMMARY
06/03/2019 Letter INSPECTION SUMMARY
06/04/2019 Letter INSPECTION SUMMARY
06/11/2019 Letter INSPECTION SUMMARY
08/14/2019 Letter INSPECTION SUMMARY
10/07/2019 Letter INSPECTION SUMMARY
10/10/2019 Letter INSPECTION SUMMARY
12/23/2019 Letter INSPECTION SUMMARY
01/02/2020 Letter INSPECTION SUMMARY
01/02/2020 Letter INSPECTION SUMMARY
03/16/2020 Letter INSPECTION SUMMARY
05/04/2020 Letter INSPECTION SUMMARY
05/04/2020 Letter INSPECTION SUMMARY
05/04/2020 Letter INSPECTION SUMMARY
05/22/2020 Letter Field Certificate of Occupancy
05/22/2020 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home