Permit Application Status

PRRES20190221


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20190221
Building Permit - Residential
Certificate of Occupancy
HUNT MIDWEST RESIDENTIAL LLC
NEW SINGLE FAMILY
NEW HOUSE, UNFINISHED AND FINISHED BASEMENT, COVERED PATIO
01/31/2019
03/05/2019
04/16/2020
Locations
Contacts
HUNT MIDWEST RESIDENTIAL LLC, Address:8300 NE UNDERGROUND DR  
SAB CONSTRUCTION INC, Address:PO BOX 942, Phone:(816) 524-3855  
CURTIS@SABHOMES.COM  
MIKE BRYANT HEATING & COOLING , Address:1711 E 123RD , Phone:(913) 441-7807  
GARRISON PLUMBING, Address:15430 S MAHAFFIE ST STE 102, Phone:(913) 768-1311  
C-R ELECTRICAL LLC, Address:4539 RIDGEWAY, Phone:(816) 803-3500  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 02/05/2019 02/05/2019
Steve Conrick
Residential Plan Review Approved 02/05/2019 02/01/2019
Brandon Kalwei
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $892.22 $892.22 Paid 03/05/2019
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 03/05/2019
8331507-Sewer Connection Fee $30.00 $30.00 Paid 03/05/2019
8331401-Water Tap Fee $3,409.00 $3,409.00 Paid 03/05/2019
8350015-Water Meter Fee $408.37 $408.37 Paid 03/05/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 3/8/2019 (1:00) 3/8/2019 at 1:15 PM 03/08/2019
Sewer Service Inspection - R Passed 3/20/2019 3/20/2019 at 8:00 AM 03/20/2019
Water Service Inspection - R Partial 03/20/2019
Water Service Inspection - R Passed 3/22/2019 3/22/2019 at 8:30 AM 03/22/2019
Underslab Plumbing Inspection - Residential Passed 4/3/2019 4/3/2019 at 9:00 AM 04/03/2019
Electrical Service Inspection Passed 5/31/2019 5/31/2019 at 9:30 AM 05/31/2019
Gas Service Inspection - Residential Passed 5/31/2019 5/31/2019 at 10:30 AM 05/31/2019
All Rough Inspection - Residential Failed 5/31/2019 5/31/2019 at 11:00 AM 05/31/2019
Misc
Corrective Action Required
05/31/2019
no further inspections until erosion control is in place - Tie rafters to ceiling joist over rear wall. -correct fie stopping and flue clearance over fireplace. - return air need completed and sealed from fireplace. - heat run in basement incomplete to master. -fire stop angle wall front entry from attic. - untreated lumber in contact with concrete basement wall. -strap top plate basement wall where drilled more than 50%. -joist hanger ceiling joist over mstr closet to LVL.
All Rough Inspection - Residential Failed 05/31/2019
All Rough Inspection - Residential Failed 05/31/2019
Misc
Corrective Action Required
05/31/2019
no further inspections until erosion control is in place - Tie rafters to ceiling joist over rear wall. -correct fie stopping and flue clearance over fireplace. - return air need completed and sealed from fireplace. - heat run in basement incomplete to master. -fire stop angle wall front entry from attic. - untreated lumber in contact with concrete basement wall. -strap top plate basement wall where drilled more than 50%. -joist hanger ceiling joist over mstr closet to LVL. - B vents within 10' of roof 2' above.. fireplace and furnace vent.
All Rough Inspection - Residential Failed 6/7/2019 6/7/2019 at 12:00 PM 06/07/2019
Misc
Corrective Action Required
05/31/2019
ok to insulate -strap top plate basement wall where drilled more than 50%. -flue clearance
All Rough Inspection - Residential Passed 6/12/2019 6/12/2019 06/12/2019
Misc
Corrective Action Required
06/07/2019
ok to insulate -strap top plate basement wall where drilled more than 50%. -flue clearance
Driveway Inspection Partial 8/6/2019 (Ready Now) 8/6/2019 08/06/2019
Misc
Informational
08/06/2019
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Sidewalk Inspection Partial 8/14/2019 8/14/2019 08/14/2019
Misc
Informational
08/14/2019
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate. I was on site last week to do a pre inspection for the ADA section of the sidewalk. There was damage to the ADA ramp and it was out of compliance therefore it had to be replaced. The curb cut for the ADA ramp also has damage and needs replaced. The contractor is going to pour the sidewalk today and leave the ADA ramp to pour at a later date.
Driveway Inspection Passed 8/13/2019 08/19/2019
Misc
Informational
08/06/2019
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Sidewalk Inspection Passed 8/21/2019 09/19/2019
Misc
Informational
08/14/2019
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate. I was on site last week to do a pre inspection for the ADA section of the sidewalk. There was damage to the ADA ramp and it was out of compliance therefore it had to be replaced. The curb cut for the ADA ramp also has damage and needs replaced. The contractor is going to pour the sidewalk today and leave the ADA ramp to pour at a later date.
Occupancy Inspection - Codes Residential Failed 3/24/2020 3/24/2020 03/24/2020
Misc
Corrective Action Required
03/24/2020
- provide cover plates kitchen island - seal top of meter can A/C disconnect
Plot Plan Inspection Passed 3/24/2020 03/24/2020
Occupancy Inspection - Codes Residential Full C of O 4/17/2020 4/17/2020 04/16/2020
Misc
Resolved
04/16/2020
Documents & Images
Date Uploaded File Type Document Name
03/05/2019 Receipt Receipt for transaction: 2019-000726
03/05/2019 Letter Codes Building Permit
03/07/2019 Plot Plan DOC030619-03062019114456
03/08/2019 Letter INSPECTION SUMMARY
03/20/2019 Letter INSPECTION SUMMARY
03/20/2019 Letter INSPECTION SUMMARY
06/07/2019 Letter INSPECTION SUMMARY
06/12/2019 Letter INSPECTION SUMMARY
08/06/2019 Letter INSPECTION SUMMARY
08/14/2019 Letter INSPECTION SUMMARY
08/19/2019 Letter INSPECTION SUMMARY
09/19/2019 Letter INSPECTION SUMMARY
03/24/2020 Letter INSPECTION SUMMARY
04/16/2020 Letter Field Certificate of Occupancy
04/16/2020 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.