Summary
PRRES20183237
Building Permit - Residential
Certificate of Occupancy
SILVERSTONE DEVELOPMENT LLC
NEW SINGLE FAMILY
NEW HOUSE FINISHED AND UNFINISHED BASEMENT COVERED DECK
09/24/2018
10/02/2018
09/27/2019
Locations
Contacts
SILVERSTONE DEVELOPMENT LLC, Address:PO BOX 346  
NICK ZVACEK CONSTRUCTION LLC, Address:1009 INDUSTRIAL DR, Phone:(816) 213-7204  
COMFORT SYSTEMS HTG/CLG, Address:128 W Markey Rd, Phone:(816) 322-1013  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
CENTURY PLUMBING, Address:14001 CENTURY LN, Phone:(816) 765-6066  
NZVACEK@GMAIL.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Residential Plan Review Approved 09/26/2018 09/27/2018
Brandon Kalwei
05 Provide square footage of living area, garage area, unfinished basement
Corrective Action Required
09/24/2018

Provide square footage of living area, garage area, unfinished basement area, etc (IRC Section R304) garage sq. ft. not found
12 Detail required separation between garage and living area including door
Corrective Action Required
09/24/2018

Detail required separation between garage and living area including door, door closer and gypsum board. (IRC R302.5) gypsum board detail not found
Plot Plan Review Approved 09/26/2018 09/26/2018
Steve Conrick
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,221.93 $1,221.93 Paid 10/02/2018
Right of Way Permit Fee $80.00 $80.00 Paid 10/02/2018
8331507-Sewer Connection Fee $570.00 $570.00 Paid 10/02/2018
Water Tap Fee $3,409.00 $3,409.00 Paid 10/02/2018
Water Meter Fee $408.37 $408.37 Paid 10/02/2018
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 10/22/2018 (3:00) 10/22/2018 at 2:55 PM 10/22/2018
Underslab Plumbing Inspection - Residential Failed 11/26/2018 11/26/2018 at 10:45 AM 11/26/2018
Misc
Corrective Action Required
11/26/2018
-PLUMBING COVERED WITH SNOW
Sewer Service Inspection - R Passed 11/29/2018 11/29/2018 at 1:50 PM 11/29/2018
Water Service Inspection - R Passed 11/30/2018 11/30/2018 at 11:25 AM 11/30/2018
Underslab Plumbing Inspection - Residential Passed 12/4/2018 12/4/2018 at 8:55 AM 12/04/2018
Misc
Resolved
12/04/2018
-PLUMBING COVERED WITH SNOW
Gas Service Inspection - Residential Failed 2/1/2019 02/01/2019
Misc
Corrective Action Required
02/01/2019
-COMPLETE GAS PIPING AND RETEST
Electrical Service Inspection Passed 2/1/2019 02/01/2019
All Rough Inspection - Residential Failed 2/1/2019 at 9:35 AM 02/01/2019
Misc
Corrective Action Required
02/01/2019
FRAMING: -Support roof beam at front bedroom exterior wall -Anchor garage sill plates per code -Provide full support for joists at master closet/garage wall return air -Seal penetrations of ceiling return air space at master closet -Fb laundry wall space from ceiling space -Solidblock under lvl point load at laundry/hallway wall corner and under double stud at laundry/bath wall; install 2-stud support for triple joist at laundry/shower wall and solidblock underneath -Install joist hangers below master shower -Solid block cantilevered joists below fireplace -Nail loft ceiling beam hanger; install correct size hangers -Install hangers for ceiling joist connections to triple beam MECHANICAL: -Install fireplace PLUMBING: -Protect plumbing at refrigerator -Complete gas line to fireplace and retest -Complete plumbing to basement bathroom **OK TO INSULATE
All Rough Inspection - Residential Failed 2/14/2019 2/14/2019 02/14/2019
Misc
Corrective Action Required
02/01/2019
HOUSE LOCKED, NO LOCK BOX PROVIDED, NO INSPECTION FRAMING: -Support roof beam at front bedroom exterior wall -Anchor garage sill plates per code -Provide full support for joists at master closet/garage wall return air -Fb laundry wall space from ceiling space -Solidblock under lvl point load at laundry/hallway wall corner and under double stud at laundry/bath wall; install 2-stud support for triple joist at laundry/shower wall and solidblock underneath -Install joist hangers below master shower -Solid block cantilevered joists below fireplace -Nail loft ceiling beam hanger; install correct size hangers -Install hangers for ceiling joist connections to triple beam on 2nd floor MECHANICAL: -Install fireplace PLUMBING: -Protect plumbing at refrigerator -Complete gas line to fireplace and retest -Complete plumbing to basement bathroom **OK TO INSULATE
All Rough Inspection - Residential Failed 2/19/2019 2/19/2019 at 9:00 AM 02/19/2019
Misc
Corrective Action Required
02/14/2019
FRAMING: -Support fully roof beam at front bedroom exterior wall -Fb laundry wall space from ceiling space -Solidblock under lvl point load at laundry/hallway wall corner and under double studs (point load supports of double and triple joists) at laundry/bath wall **not done -Install joist hangers below master shower -Nail loft ceiling beam hanger **one hanger has no nails on one side PLUMBING: -Protect plumbing at refrigerator **OK TO INSULATE
Gas Service Inspection - Residential Passed 2/19/2019 2/19/2019 02/19/2019
Misc
Resolved
02/19/2019
-COMPLETE GAS PIPING AND RETEST
All Rough Inspection - Residential Failed 2/27/2019 2/27/2019 at 9:40 AM 02/27/2019
Misc
Corrective Action Required
02/19/2019
-Support fully roof beam at front bedroom exterior wall **as you walk through the front entry door, turn right into the front room. See the roof support beam above? Please add stud support for this beam at the exterior wall end -Fb laundry wall space from ceiling space -Solidblock under double studs (point load supports of double and triple joists) at laundry/bath wall **Solid-block between the joists below the laundry/bath wall to transfer the point loads onto the I beam -Nail loft ceiling beam hanger **one hanger has no nails on one side. See the hanger nearer to the stair/bedroom wall PLUMBING: -Protect plumbing at refrigerator **not done **PLEASE BE ADVISED THAT THIS IS THE 4TH ALL-ROUGH INSPECTION. I WILL ISSUE DOUBLE RE-INSPECTION FEE IF THE ALL-ROUGH IS NOT APPROVED AT NEXT INSPECTION **OK TO INSULATE
All Rough Inspection - Residential Partial 3/8/2019 3/8/2019 at 9:35 AM 03/08/2019
Misc
Corrective Action Required
02/27/2019
**PLEASE INSTALL COLUMN SUPPORT FOR THE I BEAM IN BASEMENT BELOW THE FRONT BREAKFAST RM. CHECK ON FINAL **OK TO ROCK
Piers/Caissons Inspection - Residential Passed 4/15/2019 (9:00) 4/15/2019 at 9:40 AM 04/15/2019
Driveway Inspection Partial 4/15/2019 (P.M.) 4/15/2019 04/16/2019
Informational
04/16/2019
Forms and materials passed pre-inspection.
Driveway Inspection Passed 4/23/2019 04/29/2019
Misc
Informational
04/29/2019
Driveway Final Inspection Passed.
Erosion Control Inspection Residential Passed 5/7/2019 at 1:55 PM 05/07/2019
Occupancy Inspection - Codes Residential Failed 9/20/2019 at 9:15 AM 09/20/2019
Misc
Corrective Action Required
09/20/2019
-Obtain lawn irrigation permit -Install downspout splash blocks and sump pump extension -Complete rear stair -Install sewer tracer box -Seal above meter and AC disconnect, wall penetrations -Install tamper proof caps at AC valves -Raise AC base above grade -Mount smoke alarm above front bedroom/office -Pendant light is not allowed within the bath tub zone -Install fall protection device for window with bottom of opening less than 24” from finished floor and more than six ft above grade -Install steel column below front bedroom/office -Secure lawn irrigation pex line to wall -Provide provision to clean out furnace condensate drain
All Rough Inspection - Residential Passed 09/25/2019
Misc
Resolved
09/25/2019
**PLEASE INSTALL COLUMN SUPPORT FOR THE I BEAM IN BASEMENT BELOW THE FRONT BREAKFAST RM. CHECK ON FINAL **OK TO ROCK
Occupancy Inspection - Codes Residential Failed 9/25/2019 9/25/2019 at 10:40 AM 09/25/2019
Misc
Corrective Action Required
09/20/2019
-Install downspout splash blocks and sump pump extension -Install sewer tracer box -Install fall protection device for window meeting the requirement of IRC 312.2.1 for upper floor bedroom window with bottom of opening less than 24” from finished floor and more than six ft above grade -Secure lawn irrigation pex line to wall -Provide provision to clean out furnace condensate drain
Occupancy Inspection - Codes Residential Failed 9/26/2019 9/26/2019 at 9:45 AM 09/26/2019
Misc
Corrective Action Required
09/25/2019
-Install sump pump extension min 5 ft out -Install fall protection device for window meeting the requirement of IRC 312.2.1 for upper floor bedroom window with bottom of opening less than 24” from finished floor and more than six ft above grade **You need to get back to the window vendor to get a proper fall protection device that allow full opening of the window, so the occupant can escape in case of fire.
Occupancy Inspection - Codes Residential Full C of O 9/27/2019 9/27/2019 at 8:45 AM 09/27/2019
Misc
Resolved
09/27/2019
-Install sump pump extension min 5 ft out -Install fall protection device for window meeting the requirement of IRC 312.2.1 for upper floor bedroom window with bottom of opening less than 24” from finished floor and more than six ft above grade **You need to get back to the window vendor to get a proper fall protection device that allow full opening of the window, so the occupant can escape in case of fire.
Documents & Images
Date Uploaded File Type Document Name
09/24/2018 Letter Codes Residential Plan Review
10/02/2018 Receipt Receipt for transaction: 2018-006665
10/02/2018 Letter Codes Building Permit
10/02/2018 Plot Plan DOC100218-10022018141828
10/22/2018 Letter Inspection Summary
11/26/2018 Letter INSPECTION SUMMARY
11/29/2018 Letter INSPECTION SUMMARY
12/04/2018 Letter INSPECTION SUMMARY
02/01/2019 Letter INSPECTION SUMMARY
02/01/2019 Letter INSPECTION SUMMARY
02/01/2019 Letter INSPECTION SUMMARY
02/14/2019 Letter INSPECTION SUMMARY
02/19/2019 Letter INSPECTION SUMMARY
03/08/2019 Letter INSPECTION SUMMARY
04/15/2019 Letter INSPECTION SUMMARY
04/16/2019 Letter DE-Daily Inspection Summary
04/29/2019 Letter INSPECTION SUMMARY
04/29/2019 Letter INSPECTION SUMMARY
05/07/2019 Letter INSPECTION SUMMARY
09/20/2019 Letter INSPECTION SUMMARY
09/25/2019 Letter INSPECTION SUMMARY
09/25/2019 Letter INSPECTION SUMMARY
09/26/2019 Letter INSPECTION SUMMARY
09/27/2019 Letter Codes Final Certificate of Occupancy
09/27/2019 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home