Permit Application Status

PRRES20182804


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20182804
Building Permit - Residential
Certificate of Occupancy
MAR INVESTMENTS INC
NEW SINGLE FAMILY
NEW HOUSE UNIFNISHED BASEMENT COVERED PATIO
08/22/2018
08/30/2018
11/21/2019
Locations
Contacts
MAR INVESTMENTS INC, Address:PO BOX 847  
KEVIN HIGDON CONSTRUCTION, LLC, Address:P O BOX 847, Phone:(816) 524-9797  
PRAIRIE CENTER PLUMBING HEATING & A/C, Address:242 N MARION, Phone:(913) 829-6263  
LUCAS ELECTRIC , Address:517 MARGARET LN, Phone:(816) 807-4432  
PRAIRIE CENTER PLUMBING HEATING & A/C, Address:242 N MARION, Phone:(913) 829-6263  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 08/24/2018 08/24/2018
Steve Conrick
Residential Plan Review Approved 08/24/2018 08/23/2018
Brandon Kalwei
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,276.25 $1,276.25 Paid 08/30/2018
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 08/30/2018
8331504-EFHB Middle Big Creek, Full $636.12 $636.12 Paid 08/30/2018
8331507-Sewer Connection Fee $570.00 $570.00 Paid 08/30/2018
8331401-Water Tap Fee $3,409.00 $3,409.00 Paid 08/30/2018
8350015-Water Meter Fee $408.37 $408.37 Paid 08/30/2018
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 9/4/2018 09/04/2018
Underslab Plumbing Inspection - Residential Passed 9/27/2018 9/27/2018 at 9:00 AM 09/27/2018
Sewer Service Inspection - R Passed 10/2/2018 (1:00) 10/2/2018 at 1:00 PM 10/02/2018
Water Service Inspection - R Partial 10/3/2018 (11:00) 10/3/2018 10/02/2018
Water Service Inspection - R Passed 10/3/2018 at 1:45 PM 10/03/2018
Piers/Caissons Inspection - Residential Passed 11/13/2018 (1:30) 11/13/2018 at 1:50 PM 11/13/2018
Gas Piping Inspection - Residential Failed 11/30/2018 11/30/2018 at 2:00 PM 11/30/2018
Misc
Corrective Action Required
11/30/2018
* GAS LINE IS NOT CONNECTED TO FIRE PLACE, FIRE PLACE IS NOT INSTALLED YET. * GAS LINE IS NOT BONDED NO ELECTRICAL INSTALLED YET.
Gas Service Inspection - Residential Failed 1/3/2019 1/3/2019 at 9:00 AM 01/03/2019
Misc
Corrective Action Required
01/03/2019
* GAS LINE IS NOT BONDED. THE LUG IS IN PLACE BUT NO GROUNDING CONDUCTOR.
Erosion Control Inspection Residential Failed 1/28/2019 at 11:00 AM 01/28/2019
Misc
Corrective Action Required
01/28/2019
RE ESTABLISH EROSION CONTROL
All Rough Inspection - Residential Failed 1/28/2019 1/28/2019 at 11:20 AM 01/28/2019
Misc
Corrective Action Required
01/28/2019
DENIED DUE TO LACK OF EROSION CONTROL
All Rough Inspection - Residential Failed 2/12/2019 2/12/2019 at 10:30 AM 02/12/2019
Misc
Resolved
02/12/2019
DENIED DUE TO LACK OF EROSION CONTROL
Misc
Corrective Action Required
02/12/2019
Install boot at radon chase in garage. Fire block fir down at north wall in garage. Add 2 2x4@ steel beam in pantry-on outside wall. Nail corner studs per code. Block to support over bed4 roof joists over hallway. Dryer vent resting on flex duct. Add 4 2x4 at master bed laundry wall to support triple 2x10. Address middle king rafter that has been over notched. Above master closet.
Electrical Service Inspection Passed 2/12/2019 2/12/2019 02/12/2019
Gas Piping Inspection - Residential Passed 2/12/2019 at 11:30 AM 02/12/2019
Misc
Resolved
02/12/2019
* GAS LINE IS NOT CONNECTED TO FIRE PLACE, FIRE PLACE IS NOT INSTALLED YET. * GAS LINE IS NOT BONDED NO ELECTRICAL INSTALLED YET.
Gas Service Inspection - Residential Passed 2/12/2019 2/12/2019 at 11:41 AM 02/12/2019
Misc
Resolved
02/12/2019
* GAS LINE IS NOT BONDED. THE LUG IS IN PLACE BUT NO GROUNDING CONDUCTOR.
All Rough Inspection - Residential Passed 2/22/2019 at 8:00 AM 02/22/2019
Misc
Resolved
02/22/2019
Install boot at radon chase in garage. Fire block fir down at north wall in garage. Add 2 2x4@ steel beam in pantry-on outside wall. Nail corner studs per code. Block to support over bed4 roof joists over hallway. Dryer vent resting on flex duct. Add 4 2x4 at master bed laundry wall to support triple 2x10. Address middle king rafter that has been over notched. Above master closet.
Driveway Inspection Partial 4/16/2019 4/16/2019 04/16/2019
Misc
Informational
04/16/2019
PRE POUR INSPECTION The forms are up and there appears to be sufficient compacted aggregate.
Sidewalk Inspection Partial 4/17/2019 (A.M.) 4/17/2019 04/17/2019
Misc
Informational
04/17/2019
PRE POUR INSPECTION The forms are up and there appears to be sufficient compacted aggregate.
Sidewalk Inspection Passed 4/24/2019 04/24/2019
Misc
Informational
04/17/2019
PRE POUR INSPECTION The forms are up and there appears to be sufficient compacted aggregate.
Driveway Inspection Passed 4/24/2019 04/24/2019
Misc
Informational
04/16/2019
PRE POUR INSPECTION The forms are up and there appears to be sufficient compacted aggregate.
Occupancy Inspection - Codes Residential Failed 11/19/2019 11/19/2019 11/19/2019
Misc
Corrective Action Required
11/19/2019
-handrail needed for steps coming from garage into house - hot water heater discharge pipe is cut to high from finished floor - splash block at left of front porch needs installed
Occupancy Inspection - Codes Residential Full C of O 11/21/2019 11/21/2019 11/21/2019
Misc
Resolved
11/21/2019
Documents & Images
Date Uploaded File Type Document Name
08/30/2018 Receipt Receipt for transaction: 2018-006133
08/30/2018 Letter Codes Building Permit
09/04/2018 Plot Plan DOC090418-09042018104055
09/04/2018 Letter Inspection Summary
09/27/2018 Letter Inspection Summary
10/02/2018 Letter Inspection Summary
10/03/2018 Letter Inspection Summary
11/13/2018 Letter Inspection Summary
11/30/2018 Letter INSPECTION SUMMARY
01/03/2019 Letter INSPECTION SUMMARY
01/28/2019 Letter INSPECTION SUMMARY
01/28/2019 Letter INSPECTION SUMMARY
02/12/2019 Letter INSPECTION SUMMARY
02/12/2019 Letter INSPECTION SUMMARY
02/12/2019 Letter INSPECTION SUMMARY
02/12/2019 Letter INSPECTION SUMMARY
02/22/2019 Letter INSPECTION SUMMARY
04/16/2019 Letter INSPECTION SUMMARY
04/17/2019 Letter INSPECTION SUMMARY
04/24/2019 Letter INSPECTION SUMMARY
04/24/2019 Letter INSPECTION SUMMARY
11/19/2019 Letter INSPECTION SUMMARY
11/21/2019 Letter Field Certificate of Occupancy
11/21/2019 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home