Permit Application Status

PRRES20182457


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20182457
Building Permit - Residential
Certificate of Occupancy
HUNT MIDWEST RESIDENTIAL LLC
NEW SINGLE FAMILY
NEW HOUSE - FINISHED BASEMENT - COVERED DECK
08/03/2018
08/13/2018
09/09/2019
Locations
Contacts
HUNT MIDWEST RESIDENTIAL LLC, Address:8300 NE UNDERGROUND DR  
SAB CONSTRUCTION INC, Address:PO BOX 942, Phone:(816) 524-3855  
MIKE BRYANT HEATING & COOLING , Address:1711 E 123RD , Phone:(913) 441-7807  
C-R ELECTRICAL LLC, Address:4539 RIDGEWAY, Phone:(816) 803-3500  
GARRISON PLUMBING, Address:15430 S MAHAFFIE ST STE 102, Phone:(913) 768-1311  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 08/07/2018 08/07/2018
Steve Conrick
Residential Plan Review Approved 08/07/2018 08/07/2018
Kim Brennan
05 Provide square footage of living area, garage area, unfinished basement
Corrective Action Required
08/03/2018

Provide square footage of living area, garage area, unfinished basement area, etc (IRC Section R304) No square footage shown for the garage and unfinished basement
10 Combustion air
Corrective Action Required
08/03/2018

Provide combustion air calculations and specify transfer air grilles for fuel burning appliances located in confined space(s). (IRC Chapter 17 and Section G2407)
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,045.82 $1,045.82 Paid 08/13/2018
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 08/13/2018
8331507-Sewer Connection Fee $510.00 $510.00 Paid 08/13/2018
8331401-Water Tap Fee $3,409.00 $3,409.00 Paid 08/13/2018
8350015-Water Meter Fee $408.37 $408.37 Paid 08/13/2018
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 8/20/2018 at 3:00 PM 08/20/2018
Sewer Service Inspection - R Passed 9/10/2018 9/10/2018 at 10:00 AM 09/10/2018
Water Service Inspection - R Passed 9/11/2018 9/11/2018 at 11:00 AM 09/11/2018
Underslab Plumbing Inspection - Residential Passed 9/14/2018 9/14/2018 at 1:00 PM 09/14/2018
Electrical Service Inspection Passed 12/11/2018 12/11/2018 12/11/2018
Gas Service Inspection - Residential Passed 12/11/2018 12/11/2018 12/11/2018
All Rough Inspection - Residential Failed 12/11/2018 12/11/2018 12/11/2018
Misc
Corrective Action Required
12/11/2018
-Provide plans on site at time of inspection. -install required erosion control at street. -joist hanger ceiling joist over entry at can light. -install straps at garage doors. -install stud or header over cut stud for hood. Exterior wall. - block hole in bottom plate north Side of 1st floor, missed cut for havc.
All Rough Inspection - Residential Failed 12/20/2018 12/20/2018 12/20/2018
Misc
Corrective Action Required
12/11/2018
-Provide plans on site at time of inspection. plans show beam post in garage. -install required erosion control at street. erosion control is down in the front. -install stud or header over cut stud for hood. Exterior wall. install full length stud in bearing wall from floor to top plate next to the hood. or install header across the top of the hoos with jack stud. *block hole in bottom plate north Side of 1st floor, missed cut for havc. stud bay south of the refrigerator still opne to floor space.
All Rough Inspection - Residential Passed 12/28/2018 12/28/2018 12/28/2018
Misc
Resolved
12/28/2018
-Provide plans on site at time of inspection. plans show beam post in garage. -install required erosion control at street. erosion control is down in the front. -install stud or header over cut stud for hood. Exterior wall. install full length stud in bearing wall from floor to top plate next to the hood. or install header across the top of the hoos with jack stud. *block hole in bottom plate north Side of 1st floor, missed cut for havc. stud bay south of the refrigerator still opne to floor space.
Driveway Inspection Partial 3/22/2019 3/22/2019 03/21/2019
Misc
Corrective Action Required
03/21/2019
PRE POUR INSPECTION The forms are set at 37’ for the width of the driveway. The contractor is going to make corrections to bring it in compliance prior to pouring.
Driveway Inspection Passed 3/26/2019 03/27/2019
Misc
Corrective Action Required
03/21/2019
PRE POUR INSPECTION The forms are set at 37’ for the width of the driveway. The contractor is going to make corrections to bring it in compliance prior to pouring.
Occupancy Inspection - Codes Residential Temporary C of O 3/27/2019 3/27/2019 03/27/2019
Misc
Corrective Action Required
03/27/2019
exterior items - sod, erosion control, splashblocks , water meter etc.
Occupancy Inspection - Codes Residential Full C of O 9/9/2019 9/9/2019 09/09/2019
Misc
Corrective Action Required
03/27/2019
exterior items - sod, erosion control, splashblocks , water meter etc.
Documents & Images
Date Uploaded File Type Document Name
08/03/2018 Letter Codes Residential Plan Review
08/13/2018 Receipt Receipt for transaction: 2018-005687
08/13/2018 Letter Codes Building Permit
08/16/2018 Plot Plan DOC081518-08152018114036
08/20/2018 Letter Inspection Summary
09/10/2018 Letter Inspection Summary
09/11/2018 Letter Inspection Summary
09/14/2018 Letter Inspection Summary
12/11/2018 Letter INSPECTION SUMMARY
12/11/2018 Letter INSPECTION SUMMARY
12/11/2018 Letter INSPECTION SUMMARY
12/11/2018 Letter INSPECTION SUMMARY
12/11/2018 Letter INSPECTION SUMMARY
12/20/2018 Letter INSPECTION SUMMARY
12/28/2018 Letter INSPECTION SUMMARY
03/21/2019 Letter INSPECTION SUMMARY
03/27/2019 Letter INSPECTION SUMMARY
03/27/2019 Letter Codes Temporary Certificate of Occupancy
09/09/2019 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home