Summary
PRRES20171839
Building Permit - Residential
Certificate of Occupancy
CHOYCE LLC
NEW SINGLE FAMILY
NEW HOUSE - COVERED PATIO
06/05/2017
07/13/2017
05/26/2020
Locations
Contacts
CHOYCE LLC, Address:PO BOX 847  
KEVIN HIGDON CONSTRUCTION, LLC, Address:P O BOX 847, Phone:(816) 524-9797  
PRAIRIE CENTER PLUMBING HEATING & A/C, Address:242 N MARION, Phone:(913) 829-6263  
LUCAS ELECTRIC , Address:517 MARGARET LN, Phone:(816) 807-4432  
PRAIRIE CENTER PLUMBING HEATING & A/C, Address:242 N MARION, Phone:(913) 829-6263  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 06/07/2017 07/12/2017
Nick Lightner
Sidewalks
Resolved
07/12/2017

Sidewalks with deminsions must be provided on the plot plan. *On the west side of the property can you please include the 5 foot sidewalk and ada ramp location.
Drainage swales
Resolved
07/12/2017

Drainage swales (where required); show spot elevations within the swale as required to conform to the approved master drainage plan (if applicable), must be provide *Can you please show the swale detail on the plot plan.
As-graded plot plan
Resolved
07/12/2017

A as-graded plot plan per Section 7-160, Code of Ordinances, is required prior to occupancy. *Can you please add "AS-GRADED PLOT PLAN IS REQUIRED PRIOR TO SODDING"
City infrustructure
Resolved
07/12/2017

Show all manholes, water valve boxes, fire hydrants, and stormwater structures. * Can you please show on the west side of th lot a sanatary man hole.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $930.95 $930.95 Paid 07/13/2017
9110073-Right of Way Permit Fee $75.00 $75.00 Paid 07/13/2017
8331504-EFHB Middle Big Creek, Full $569.16 $569.16 Paid 07/13/2017
8331507-Sewer Connection Fee $510.00 $510.00 Paid 07/13/2017
8331401-Water Tap Fee $3,310.00 $3,310.00 Paid 07/13/2017
8350015-Water Meter Fee $405.36 $405.36 Paid 07/13/2017
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 7/26/2017 (10:00) 7/26/2017 07/26/2017
Underslab Plumbing Inspection - Residential Not Ready 8/17/2017 8/17/2017 at 1:15 AM 08/17/2017
Misc
Corrective Action Required
08/17/2017
NO INSPECTION - Establish erosion control on front, rear, and east sides of Property. Clean up street. Remove overgrown weeds.
Erosion Control Inspection Residential Failed 8/17/2017 at 1:20 AM 08/17/2017
Misc
Corrective Action Required
08/17/2017
Establish erosion control on front, rear, and east sides of Property.
Underslab Plumbing Inspection - Residential Not Ready 8/24/2017 8/24/2017 at 9:30 AM 08/24/2017
Misc
Corrective Action Required
08/17/2017
NO INSPECTION - Establish erosion control on front, rear, and east sides of Property. Clean up street. Remove overgrown weeds.
Erosion Control Inspection Residential Failed 8/24/2017 at 9:35 AM 08/24/2017
Misc
Corrective Action Required
08/17/2017
Establish erosion control on front, rear, and east sides of Property.
Underslab Plumbing Inspection - Residential Passed 8/29/2017 8/29/2017 at 2:50 PM 08/28/2017
Misc
Resolved
08/28/2017
NO INSPECTION - Establish erosion control on front, rear, and east sides of Property. Clean up street. Remove overgrown weeds.
Erosion Control Inspection Residential Partial 8/28/2017 at 2:55 PM 08/28/2017
Misc
Resolved
08/28/2017
Establish erosion control on front, rear, and east sides of Property.
Sewer Service Inspection - R Partial 9/14/2017 (8:30) 9/14/2017 at 9:35 AM 09/14/2017
Sewer Service Inspection - R Passed 9/14/2017 (1:45) 9/14/2017 at 2:00 AM 09/14/2017
Water Service Inspection - R Partial 9/14/2017 at 2:10 AM 09/14/2017
Water Service Inspection - R Passed 9/15/2017 (11:15) 9/15/2017 at 11:15 AM 09/15/2017
Gas Service Inspection - Residential Failed 10/24/2017 at 10:40 AM 10/24/2017
Misc
Corrective Action Required
10/24/2017
Low pressure
Electrical Service Inspection Passed 11/15/2017 11/15/2017 at 3:45 AM 11/15/2017
Gas Service Inspection - Residential Failed 11/15/2017 11/15/2017 at 3:50 AM 11/15/2017
Misc
Corrective Action Required
10/24/2017
Low pressure
All Rough Inspection - Residential Failed 11/15/2017 11/15/2017 at 3:55 AM 11/15/2017
Misc
Corrective Action Required
11/15/2017
1. GAS: Low PSI. 2. EXT: Siding nails overdriven; ensure WSP spacing where needed. 3. EXT: Exterior garage portal nailing to sill plate. 4. BSMT: Firestop vertical-to-horizontal at stair landing. 5. BSMT: Anchor columns. 6. BSMT: Support bottoms of stair stringers. 7. BSMT: Support DWV every 4'. 8. BSMT: Complete electric installation (non-terminated wire dangling near panel). 9. BSMT: Stub vents for future bar and bath. 10. BSMT: Install window. 11. 1st FLR: Sill-plate anchor - southwest corner of garage. 12. 1st FLR: Firestop at change of ceiling height in living room - foam gaps in blocking & add blocking around stove-vent duct. 13. 1st FLR: Firestop vert-to-horiz where fireplace meets arches and where arch meets perimeter wall. 14. 1st FLR: Missing ceiling joist hanger near rear door. 15. 1st FLR: Security blocking - rear door. 16. 1st FLR: Corner nail - west corner. 17. 1st FLR: Protect NM within 6' of attic access. 18. 1st FLR: Joist hangers at attic access. 19. 1st FLR: BOCA plates at bathroom. 20. 1st FLR: More than 2 consecutive studs are bored at the northeast wall. 21. 1st FLR: Many corrections needed in roof framing - too numerous to itemize, but include issues such as missing purlins, missing supports, and incorrectly constructed supports.
Piers/Caissons Inspection - Residential Passed 11/16/2017 (3:00) 11/16/2017 at 2:50 AM 11/16/2017
Gas Service Inspection - Residential Passed 11/21/2017 11/21/2017 at 8:55 AM 11/21/2017
Misc
Resolved
11/21/2017
Low pressure
Gas Piping Inspection - Residential Passed 10/24/2017 11/21/2017 at 9:05 AM 11/21/2017
All Rough Inspection - Residential Failed 11/21/2017 11/21/2017 at 9:10 AM 11/21/2017
Misc
Corrective Action Required
11/15/2017
2. EXT: Siding nails overdriven; ensure WSP spacing where needed. 12. 1st FLR: Firestop at change of ceiling height in living room - foam gaps in blocking. 13. 1st FLR: Firestop vert-to-horiz where fireplace meets arches and where arch meets perimeter wall - foam gaps. 21. 1st FLR: Many corrections needed in roof framing - too numerous to itemize, but include issues such as missing purlins, missing supports, and incorrectly constructed supports.
All Rough Inspection - Residential Passed 11/22/2017 11/22/2017 at 10:15 AM 11/22/2017
Misc
Resolved
11/22/2017
2. EXT: Siding nails overdriven; ensure WSP spacing where needed. 12. 1st FLR: Firestop at change of ceiling height in living room - foam gaps in blocking. 13. 1st FLR: Firestop vert-to-horiz where fireplace meets arches and where arch meets perimeter wall - foam gaps. 21. 1st FLR: Many corrections needed in roof framing - too numerous to itemize, but include issues such as missing purlins, missing supports, and incorrectly constructed supports.
Driveway Inspection Partial 2/14/2018 2/14/2018 at 3:10 PM 02/14/2018
Informational
02/14/2018
Tom Chandler 02/14/2018 3:17 PM Inspected forms and compacted aggregate only.
Driveway Inspection Passed 2/27/2018 at 10:45 AM 02/27/2018
Informational
02/27/2018
Tom Chandler 02/27/2018 10:51 AM Driveway has been completed and passed final inspection.
Erosion Control Inspection Residential Failed 3/27/2018 at 11:41 AM 03/27/2018
Corrective Action Required
03/27/2018
Matt Munger 03/27/2018 11:46 AM ESC devices need to be installed on the property to prevent silt from leaving the site. Silt has gotten into the curb gutter and will need to be removed. A Stop Work Order may be issued if ESC is not in compliance.
Erosion Control Inspection Residential Failed 4/3/2018 at 1:50 PM 04/03/2018
Corrective Action Required
04/03/2018
Matt Munger 04/03/2018 1:56 PM The site does not Erosion Control Devices in place to prevent soil from leaving the site. There are signs of silt in the curb gutter due to the lack of ESC devices. Erosion Control needs to be put in place within 48 hours. A Stop Work Order may be issued if ESC devices are not installed.
Sidewalk Inspection Partial 5/3/2018 at 3:00 PM 05/03/2018
Informational
05/03/2018
Tom Chandler 05/03/2018 4:16 PM Inspected forms and compacted aggregate only. Sidewalk along the back of the lot.
Sidewalk Inspection Passed 5/21/2018 at 2:20 PM 05/21/2018
Informational
05/21/2018
Tom Chandler 05/21/2018 2:22 PM Sidewalk has been completed and passed final inspection.
Occupancy Inspection - Codes Residential Failed 1/18/2019 at 8:00 AM 01/18/2019
Misc
Corrective Action Required
01/18/2019
* INSTALL SPARK RINGS AT KITCHEN OUTLETS LOCATED WITHIN BACKSPLASH.
Occupancy Inspection - Codes Residential Temporary C of O 1/24/2019 at 1:00 PM 01/24/2019
Misc
Resolved
01/24/2019
* INSTALL SPARK RINGS AT KITCHEN OUTLETS LOCATED WITHIN BACKSPLASH.
Misc
Corrective Action Required
01/24/2019
AS GRADED PLOT PLAN IS REQUIRED.
Plot Plan Inspection Passed 3/20/2020 03/20/2020
Occupancy Inspection - Codes Residential Full C of O 5/26/2020 5/26/2020 05/26/2020
Misc
Resolved
05/26/2020
Documents & Images
Date Uploaded File Type Document Name
07/10/2017 Letter Codes Residential Plan Review
07/13/2017 Receipt Receipt for transaction: 2017-004915
07/13/2017 Letter Codes Building Permit
07/13/2017 Plot Plan Plot Plan
07/26/2017 Letter Inspection Summary
08/17/2017 Letter Inspection Summary
08/24/2017 Letter Inspection Summary
08/28/2017 Letter Inspection Summary
09/14/2017 Letter Inspection Summary
09/14/2017 Letter Inspection Summary
09/14/2017 Letter Inspection Summary
09/15/2017 Letter Inspection Summary
10/24/2017 Letter Inspection Summary
11/15/2017 Letter Inspection Summary
11/16/2017 Letter Inspection Summary
11/21/2017 Letter Inspection Summary
11/22/2017 Letter Inspection Summary
02/14/2018 Letter DE-Daily Inspection Summary
02/27/2018 Letter DE-Daily Inspection Summary
03/27/2018 Letter DE-Daily Inspection Summary
04/03/2018 Letter DE-Daily Inspection Summary
05/03/2018 Letter DE-Daily Inspection Summary
05/21/2018 Letter DE-Daily Inspection Summary
10/08/2018 Letter Codes 140 Day Letter
01/18/2019 Letter INSPECTION SUMMARY
01/24/2019 Letter Codes Temporary Certificate of Occupancy
03/19/2020 Plot Plan LOT 118 ASBUILT
03/20/2020 Letter INSPECTION SUMMARY
05/26/2020 Letter Field Certificate of Occupancy
05/26/2020 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home