Permit Application Status

PRRES20170293


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20170293
Building Permit - Residential
Final Completion
ATKINS JASON D & TARA D
REPAIR REPLACE UPGRADE
INSTALLING GAS LINES. SWITCHING FROM PROPANE TO NATURAL GAS
02/08/2017
02/08/2017
03/29/2023
Locations
Contacts
ATKINS JASON D & TARA D, Address:3603 SW CRANE RD  
ATKINS JASON D & TARA D, Address:3603 SW CRANE RD  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 02/08/2017 02/08/2017
Development Center
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for Repair/Replace/Upgrade $30.00 $30.00 Paid 02/08/2017
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Gas Service Inspection - Residential Failed 3/7/2017 3/7/2017 03/07/2017
Misc
Corrective Action Required
03/07/2017
Interior inspected need to install pressure gauge on exterior 1`0lbs for 15min and recall for inspection.
Gas Service Inspection - Residential Passed 3/8/2017 3/8/2017 03/08/2017
Misc
Resolved
03/08/2017
Interior inspected need to install pressure gauge on exterior 1`0lbs for 15min and recall for inspection.
Documents & Images
Date Uploaded File Type Document Name
02/08/2017 Receipt Receipt for transaction: 2017-000379
02/08/2017 Letter Codes Building Permit
02/08/2017 Scope of Work DOC020817-012
03/07/2017 Letter Inspection Summary
03/08/2017 Letter Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home