Permit Application Status

PRRES20163037


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20163037
Building Permit - Residential
Final Completion
PERKINS DANYALE S & WILLIAM E
ADDITION SINGLE FAMILY
ROOM ADDITION
11/21/2016
11/21/2016
05/22/2017
Locations
Contacts
PERKINS DANYALE S & WILLIAM E, Address:4028 SW BENZIGER DR  
GLENROSS CONTRACTING INC, Address:18275 S RIDGEVIEW RD, Phone:(913) 686-2367  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
DS ELECTRIC, Address:5336 KNOX ST, Phone:(913) 432-0313  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 11/21/2016 11/21/2016
Development Center
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Add/Alter Single Family $106.76 $106.76 Paid 11/21/2016
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 2/6/2017 2/6/2017 02/06/2017
Foundation Inspection - Residential Passed 2/7/2017 (8:00) 2/7/2017 02/07/2017
All Rough Inspection - Residential Failed 3/13/2017 03/13/2017
Misc
Corrective Action Required
03/13/2017
-gas pressure test required on gas line - protect gas line in wall - provide access/ ventilation on crawl space. ok to insulate
All Rough Inspection - Residential Passed 3/15/2017 3/15/2017 03/15/2017
Misc
Resolved
03/15/2017
-gas pressure test required on gas line - protect gas line in wall - provide access/ ventilation on crawl space. ok to insulate
Final Inspection - Residential Passed 5/22/2017 5/22/2017 05/22/2017
Documents & Images
Date Uploaded File Type Document Name
11/21/2016 Receipt Receipt for transaction: 2016-006908
11/21/2016 Letter Codes Building Permit
11/22/2016 Plot Plan DOC112216
11/22/2016 Drawing DOC112216-001
02/06/2017 Letter Inspection Summary
02/07/2017 Letter Inspection Summary
03/13/2017 Letter Inspection Summary
03/15/2017 Letter Inspection Summary
05/22/2017 Letter Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home